Skip to the record
The gold standard in government transparency.

Council archive · source document

01. Hales - DA Form 1, Authority to Act, SDAP module · OPW20/0118

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Performance outcomes                           Acceptable outcomes                                                        Response
                                               navigation, an aid to navigation management plan is required.

                                               AND
                                               AO2.3 Development keeps sight lines of any aids to                         Complies with AO2.3
                                               navigation which cross the land clear of obstructions.                     The proposal does not interfere with sight lines of
                                                                                                                          any aids to navigation.
                                               Note: Where development has the potential to obstruct the line of
                                               sight to aids to navigation or interfere with the functioning of aids to
                                               navigation, an aid to navigation management plan is required.

                                               AND
                                               AO2.4 Development ensures ongoing access to aids                           Complies with AO2.4
                                               to navigation for maintenance purposes.                                    The proposal does not interfere with access to
                                                                                                                          aids to navigation.
                                               AND
                                               AO2.5 Development does not result in electrical or                         Complies with AO2.5
                                               electro-magnetic emissions which may impede the                            The proposal is not designed to result in electrical
                                               operation of aids to navigation.                                           or electro-magnetic emissions which may impede
                                                                                                                          the operation of aids to navigation.
Protection of navigable waterways
PO3 Development does not impede the safe       AO3.1 Development ensures navigable waterways                              Complies with AO3.1
movement of vessels in a navigable waterway.   are open to vessel traffic at all times.                                   The jetty proposal is positioned at the appropriate
                                                                                                                          quay line and does not interfere with
                                               AND                                                                        vessel traffic in this section of the canal.
                                                                                                                          The boundary wall is located within the freehold
                                                                                                                          property.
                                               AO3.2 Development, including structures and any                            Complies with PO3
                                               vessel berthed at the structures:                                          The proposed jetty and associated vessel do not
                                               1. does not encroach into, pass over or under a                            extend into the navigation corridor. Further, the
                                                  navigation corridor; or                                                 proposal is not located in a high risk maritime
                                               2. is not located in a high risk maritime development                      development zone. See plans for positioning
                                                  zone.                                                                   details.

                                               Note: Navigation corridor and high risk maritime development zone
                                               layers are currently unavailable for Gold Coast waters.

                                               AND
                                               AO3.3 Development does not limit either the depth of                       Complies with AO3.3
                                               a navigable waterway or the size of vessels which can                      The proposal does not alter the depth of the



State Development Assessment Provisions – version 2.4
State code 7: Maritime safety                                                                                                                           Page 2 of 3

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

01. Hales - DA Form 1, Authority to Act, SDAP module.pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.