Skip to the record
The only place to find full transcripts.

Council archive · source document

01. Hales - DA Form 1, Authority to Act, SDAP module · OPW20/0118

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Performance outcomes                         Acceptable outcomes                                                    Response
                                             safely navigate the waterway.                                          navigable waterway and does not extend into the
                                                                                                                    navigation corridor.
                                             Note: Where development proposes to temporarily or permanently
                                             limit the depth of a navigable waterway or the size of vessels which
                                             can navigate a waterway, it is recommended that a vessel traffic
                                             management plan be provided. It is also recommended a marine
                                             execution plan be submitted to the regional harbour master 30 days
                                             prior to the commencement of works.

                                             AND
                                             AO3.4 Development involving the demolition of                          Compliant,.
                                             structures in a navigable waterway, including piling,                  The existing jetty, concrete ramp and landscaped
                                             ensures the entire structure is removed.                               rock and grass area will be completely removed
                                                                                                                    from the site.
                                             AND
                                             AO3.5 Structures, including all freestanding piles,                    Complies with AO3.5
                                             must be appropriately lit and clearly visible to                       A light unit will be positioned on the jetty.
                                             approaching vessels, and reflective tape must be                       This will ensure the structure is lit appropriately
                                             fitted to all structures to enhance visibility during the              for approaching vessels.
                                             hours of darkness.                                                     The boundary wall is within the freehold property
                                                                                                                    and does not extend into the canal area.
                                             Note: Where necessary, the regional harbour master may require
                                             the installation of aids to navigation on structures.




State Development Assessment Provisions – version 2.4
State code 7: Maritime safety                                                                                                                     Page 3 of 3

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

01. Hales - DA Form 1, Authority to Act, SDAP module.pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.