Council archive · source document
01. Hales - DA Form 1, Authority to Act, SDAP module · OPW20/0118
Performance outcomes Acceptable outcomes Response
safely navigate the waterway. navigable waterway and does not extend into the
navigation corridor.
Note: Where development proposes to temporarily or permanently
limit the depth of a navigable waterway or the size of vessels which
can navigate a waterway, it is recommended that a vessel traffic
management plan be provided. It is also recommended a marine
execution plan be submitted to the regional harbour master 30 days
prior to the commencement of works.
AND
AO3.4 Development involving the demolition of Compliant,.
structures in a navigable waterway, including piling, The existing jetty, concrete ramp and landscaped
ensures the entire structure is removed. rock and grass area will be completely removed
from the site.
AND
AO3.5 Structures, including all freestanding piles, Complies with AO3.5
must be appropriately lit and clearly visible to A light unit will be positioned on the jetty.
approaching vessels, and reflective tape must be This will ensure the structure is lit appropriately
fitted to all structures to enhance visibility during the for approaching vessels.
hours of darkness. The boundary wall is within the freehold property
and does not extend into the canal area.
Note: Where necessary, the regional harbour master may require
the installation of aids to navigation on structures.
State Development Assessment Provisions – version 2.4
State code 7: Maritime safety Page 3 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
01. Hales - DA Form 1, Authority to Act, SDAP module.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.