Council archive · source document
PRESENTATION - Jade Oakley x CR - Noosa Concept Final 24-4-25_Optimized · EXE25/0029
TECHNICAL DRAWINGS
1 2 3 4 5 6 7 8
A A
B B
C C
PLINTH TO BE CAST
ONSITE AFTER BOATS
FIXED IN PLACE. THEN
COVERED IN SOIL.
D D
M16 ANCON COUPLER
TO CONNECT BOAT TO
FOOTING
E E
CONCRETE FOOTING TO BE POURED ON-SITE
ALL DRAWINGS AND CONCEPTS TITLE:
ARE PROPERTY OF PARTS
F
DEPARTMENT AND MAY NOT BE CROSSING THE BAR F
COPIED WITHOUT CONSENT.
NAME SIGNATURE DATE DRW NO REVISION
DRAWN DUGALD MONCRIEFF 20/04/25
IN-GROUND FOOTING V3
BUILT
A3
FINISH RAW MATERIAL MIXED SCALE 1:15 SHEET 6/6
PROJECT JADE OAKLEY - CROSSING THE BAR CONCRETE
1 2 3 4 5 6 7 8
Noosa Council CityDeal Public Art Initiative | April 2025 Jade Oakley x Creative Road 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PRESENTATION - Jade Oakley x CR - Noosa Concept Final 24-4-25_Optimized.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.