Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

PRESENTATION - Jade Oakley x CR - Noosa Concept Final 24-4-25_Optimized · EXE25/0029

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

MAINTENANCE +
DURABILITY
Crossing The Bar has been designed with longevity, safety, and ease of maintenance as key       a secure and permanent installation. The budget allows for pile footings in addition to large
considerations from the outset. All materials, finishes, and construction methods have been     concrete footings to be poured on site.
selected to withstand the coastal conditions of Noosa and to ensure the artwork remains
intact, presentable, and safe for a minimum lifespan of 10 years, in accordance with Council    Lighting & Electrical Considerations
expectations.                                                                                   If lighting is used, it will utilise low-voltage, weatherproof LED fittings, sealed and rated for
                                                                                                outdoor use (minimum IP67). All components will be serviceable and sourced from reputable
Durable Materials & Finishes                                                                    suppliers with parts available over the long term. Power will be drawn from the adjacent boat
The sculpture will be fabricated using marine-grade stainless steel and high-performance        ramp infrastructure, minimising new installation costs and ensuring accessibility for future
concrete, both chosen for their strength, weather resistance, and proven performance in         electrical maintenance.
coastal environments. These materials are non-corrosive and highly durable, requiring minimal
upkeep even in high-salinity, UV-exposed environments.                                          Maintenance Requirements
                                                                                                The artwork is designed to be low maintenance. Recommended maintenance includes:
Where colour or texture is used, finishes will be achieved through integral pigments or
abrasion-resistant coatings, reducing the risk of peeling or fading over time. All materials    •   Annual inspection of surface condition and structure for signs of corrosion, structural
are selected to be graffiti-resistant and easily cleanable, with no small components, fragile       stress, or damage.
features, or moving parts that could compromise the work’s safety or appearance over time.      •   Annual wash-down with freshwater and mild detergent to remove salt residue and
The sculptures will be sealed with dry-look Graffex anti graffiti coating by Cementaid.             surface contaminants.
                                                                                                •   Graffiti removal as required using non-abrasive, Council-approved cleaners.
Fabrication and Engineering Standards                                                           •   Annual check of any integrated electrical components or lighting by a licensed
Fabrication will be overseen by Parts Department, whose background in delivering high-              electrician.
quality public artworks ensures that all constructed elements will meet the highest standards
of durability and workmanship. The structure will be engineered and certified by Partridge      These tasks can be completed within routine Council maintenance schedules and do not
Engineers to ensure compliance with all relevant load-bearing, safety, and public use           require specialist knowledge or equipment beyond standard public asset care.
standards, including climbability and stability for interactive engagement.
                                                                                                Documentation
Footings & Installation                                                                         A detailed Maintenance Manual will be provided at handover, including materials
Concrete footings and foundations, provided by Heritage Precast Toowoomba, will be              specifications, cleaning instructions, recommended inspection intervals, and contact details
designed to accommodate shifting soil, weather events, and consistent public interaction.       for all relevant contractors and suppliers.
Anchoring systems will be non-invasive to the surrounding natural environment while ensuring




Noosa Council CityDeal Public Art Initiative | April 2025                                                                                                          Jade Oakley x Creative Road   28

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PRESENTATION - Jade Oakley x CR - Noosa Concept Final 24-4-25_Optimized.pdf · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.