Council archive · source document
Operational Works Application OPW19-0092 · OPW19/0092
(1 Listed on the Environmental Management Register (EMR) under the Environmental Protection Act 1994 EMR site identification: (1 Listed on the Contaminated Land Register (CLR) under the Environmental Protection Act 1994 CLR site identification: N/A 5) Are there any existing easements over the premises? Note: Easement t vary throughout Queensland and are to be identified correctly and accurately. For further information on easements and how they may affect the proposed development, see DA Forms Guide C1 Yes — All easement locations, types and dimensions are included in plans submitted with this development application [XI No PART 3 —- DEVELOPMENT DETAILS Section 1 — Aspects of development 6.1) Provide details about the first development aspect a) What is the type of development? (tick only one box) CO Material change of use (1 Reconfiguring a lot [J Operational work (1 Building work b) What is the approval type? (tick only png 4x) Jf Development permit ae approval Oo Preliminary approval that includes a variation approval c) What is the level of assessment? we assessment oO Impact assessment (requires public notification) d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3 os: replace existing Orivewey with new, Replace low Retaining wall Cam) wiltK new Footing 2% block wail e) Relevant plans Note: Refevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms guide: Releyafit plans. Relevant plans of the proposed development are attached to the development application 6.2) Provide details about the second development aspect a) What is the type of development? (tick only one box) CI Material change of use (1 Reconfiguring a lot Operational work (1 Building work b) What is the approval type? (tick only one box) C1 Development permit (1 Preliminary approval (1 Preliminary approval that includes a variation approval c) What is the level of assessment? (1 Code assessment (J Impact assessment (requires public notification) d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3 lots): e) Relevant plans Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide: Relevant plans. (J Relevant plans of the proposed development are attached to the development application Page 3 DA Form 1 ~ Development Application details Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW19-0092.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.