Skip to the record
Accept no substitutions.

Council archive · source document

Operational Works Application OPW19-0092 · OPW19/0092

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

6:3) Additional eeecel GENE lelelancint

CJ Additional aspects of development are relevant to this development application and the details for these aspects
thafwould be required under Part 3 Section 1 of this form have been attached to this development application
Not required

 

Section 2 — Further development details

 

7) Does the proposed geeou ue application invaive any fejp dels: following?

 

 

 

 

Material change of use ’ ([] Yes — complete division 1 if assessable against a focal planning instrument
Reconfiguring a lot C] Yes complete division 2

Operational work aes ~ complete division 3

Building work (2 Yes ~ complete DA Form 2 — Building work details

 

 

Division 1 — Material change of use

Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
focal planning instrument.

8.1) Describe the proposed maternal change of use S

Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m? )

(if applicable}

   
 
        

 

 

 

 

 

 

 

8 2) Does the proposed use involve the use of existing buildings on the premises?
(J Yes
CI No

 

 

 

 

 

 

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

9.1) What is the total number of existing Jots REL) upthe premises? oe oe cu 2

9.2) What Is the nattire of the lot reconfiguration? i ic all applicable boxes)

   
     

  

 

 

 

 

(1) Subdivision (complete 10)) [1 Dividing land into parts by agreement (complete 11)
(1 Boundary realignment (complete 12) (J Creating or changing an easement giving access to a lot
from a construction road (complete 13))

 

  
 

  
    
 

40) Subdivision
10.1) Eor this development, how many lots are being created and cea is the intended use of fae leis
intended use of lots created Residential Commercial

 

   

Industrial Other, please specify:

 

  
  

 

 

  
   

Number of lots created
40.2) Will the subdivision be staged?
[J Yes — provide additional details below
CI No

How many stages will the works include?

What stage(s) will this development application
apply to?

 

 

 

 

 

 

Page 4
DA Form 1 ~- Development Application details
Version 1.1— 22 JUNE 2018

Used in these records

About this file

File size
9.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW19-0092.pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.