Council archive · source document
Operational Works Application OPW19-0092 · OPW19/0092
6:3) Additional eeecel GENE lelelancint
CJ Additional aspects of development are relevant to this development application and the details for these aspects
thafwould be required under Part 3 Section 1 of this form have been attached to this development application
Not required
Section 2 — Further development details
7) Does the proposed geeou ue application invaive any fejp dels: following?
Material change of use ’ ([] Yes — complete division 1 if assessable against a focal planning instrument
Reconfiguring a lot C] Yes complete division 2
Operational work aes ~ complete division 3
Building work (2 Yes ~ complete DA Form 2 — Building work details
Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
focal planning instrument.
8.1) Describe the proposed maternal change of use S
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m? )
(if applicable}
8 2) Does the proposed use involve the use of existing buildings on the premises?
(J Yes
CI No
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing Jots REL) upthe premises? oe oe cu 2
9.2) What Is the nattire of the lot reconfiguration? i ic all applicable boxes)
(1) Subdivision (complete 10)) [1 Dividing land into parts by agreement (complete 11)
(1 Boundary realignment (complete 12) (J Creating or changing an easement giving access to a lot
from a construction road (complete 13))
40) Subdivision
10.1) Eor this development, how many lots are being created and cea is the intended use of fae leis
intended use of lots created Residential Commercial
Industrial Other, please specify:
Number of lots created
40.2) Will the subdivision be staged?
[J Yes — provide additional details below
CI No
How many stages will the works include?
What stage(s) will this development application
apply to?
Page 4
DA Form 1 ~- Development Application details
Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW19-0092.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.