NOTES - RESIDENTIAL ESTATES 1. LOCAL AUTHORITY REQUIREMENTS Unless specified or detailed with this set of Landscape drawings works are to be to Local Authority details and requirements. 2. DRAINAGE Refer to relevant engineering drawings for storm water drainage and field gully sizing and connections. Field gullies are to be supplied, installed and connected to the stormwater system. Install subsoil drains where indicated on plans, and behind all retaining walls. Connect subsoil drains to storm water drainage system or to gravel soakage pit as indicated on plan. 3. FALLS, LEVELS AND GRADING Grade all lawns and planting areas evenly, in the direction shown by arrows, or by using the spot levels provided. Ponding is unacceptable. Final surface levels to be verified on site. Refer Engineering drawings for levels on road surfaces, pits, gullies etc. Unless noted otherwise on plan, surrounding maximum grades should be 1:4 for planting beds, and 1:6 for turf areas. 4. PLANTING SELECTION Refer to plant schedule for plant selection and to plans for the locations of tree and associated planting. 4.1 Fertiliser to planting areas: Install Agriform 10gm Slow Release Tablets to all plants under 45Ltr at planting as per the Manufacturer's instructions. Install Agriform 21gm Slow Release Tablets to all plants over 45Ltr at planting as per Manufacturer's instructions. Use Dynamic Lifter or equivalent through topsoil as per manufacturer's recommendations. Apply a general organic fertiliser to all plants. Fertilisers containing phosphorous must not be used on Banksia, Grevillea, Hakea, Telopea, Hardenbergia, Proteas, Alyogyne and Phebalium species. 4.2 SH - Sun hardened It is the contractors responsibility to ensure all plants are sun hardened to the sites climatic conditions. 5. PLANTING AREAS (PA) a) Common Planting Areas. Cultivate to 150mm depth and place 300mm site topsoil, as specified. Place 100mm layer of site mulch or unscreened hoop pine bark mulch, as specified. Mound garden beds above adjacent hard surfaces to promote positive drainage and as directed on plan. b) General Planting into Common Planting Areas - 140mm to 25lt pot sizes. Mound up additional topsoil around the base of the plants to achieve minimum soil depths, as shown in the landscape detail drawings. The profile of mounding is to provide a smooth transition to the grades, as shown. c) Advanced & Super Advanced Stock Planting - 45It to 200It & Ex-ground stock. All stock is to be planted with imported topsoil, and with a specified minimum quantity of topsoil immediately surrounding the planting basin. Minimum quantity varies according to the size of the stock installed. Refer to Soil Schedule in specification for soil volume and installed dimensions. Provide drainage gravel layer and subsoil drainage where indicated on landscape plans. d) Street Trees - Street trees are to be planted into a minimum volume of amended site topsoil according to the size of stock installed, and mounded to the heights noted on plans. e) Podium Planting Areas - Podium planters are to be min 600mm of average for groundcovers and shrubs and 1000mm min depth for tree plantings. Refer to Typical Planter Profile detail. 6. REVEGETATION PLANTING AREAS Following weed management the following works are to occur: Cultivation Cultivate all of revegetation that do not occur within the drip line of existing vegetation to a minimum depth of 150mm. Mulch (a) Blanket mulch all areas indicated as revegetation with a minimum of 100mm mulch or as specified. (b) Mulch must be a minimum of 100mm unless specified and contain a combination of leaf, timber and bark unless otherwise specified. (c) Where blanket mulch is not specified use pre-fabricated jute-mat squares or approved equivalent or mulch rings around all tubstock as specified. (d) No soil laden tub grindings will be allowed to be used as mulch. (e) Soil laden tub grindings may only be used as an additive to site topsoil used in revegetation areas. (f) Planted slopes equal to or steeper than 1:6 must be fully mulched with a locking mulch such as unscreened hoop pine. 7. EQUITABLE ACCESS All pathways are to have maximum cross-falls of 1:40. Handrails and pathways to comply with AS1428.1. Tactile indicators to comply with 1428.4. 8. PAVEMENTS Pavements are to be non-slip to comply with BCA requirements and AS1428. 9. LAWN AREAS Cultivate existing subgrade to a depth of 150mm, place 100mm of topsoil as specified, and lay 25mm thick turf rolls as specified. Ensure flush to adjacent pathways. 9. EDGING Construct continuous mowing strips in locations shown on plans. Refer to detail for type and size. 10. FENCES AND RETAINING WALLS Refer to landscape plans for wall and fence types and dimensions. Refer to Engineer's details for construction. 11. STREET TREE PLANTING Place street trees to local authority policy and generally to the centre of lots to maximise distance from driveways, services and street lights. 12. NAT SPEC At the time of planting all trees must conform to guidelines outlined with ‘Specifying Trees - A Guide to Assessment of Tree Quality'(Author - Ross Clark) otherwise known as Nat Spec. Responsibility for planting only Nat Spec compliant trees will rest with the landscape contractor. Where Nat Spec quality trees can not be sourced, no other tree species is to substituted without referring the issue to the landscape architect. The landscape contractor is responsible for informing the landscape architect if a tree species is not available due to issues of non-Nat Spec compliance. 13. IRRIGATION CONDUITS UPVC capped conduits under pathways to be installed by Contractor. Conduits under roads and kerbs are also to be installed by Contractor. A1 ESTABLISHMENT PERIOD WORKS Period Commencement: The planting establishment period commences at the date of practical completion. Required period: Refer to Schedule Existing planting and grass Maintenance: Where existing grass or planting is within the landscape contract area, maintain it as for the corresponding classifications of new grass or planting. A1.1Scope of Works The WUC is outlined in detail on the Plans and Schedule of Works. If this work item does not appear on the Plans or Schedule of Works, please disregard the following section. A1.2Recurrent works General: Throughout the planting establishment period, carry out maintenance work including, watering, mowing, weeding, rubbish removal, fertilising, pest and disease control, reseeding, returfing, staking and tying, replanting, cultivating, pruning, hedge clipping, aerating, reinstatement of mulch, renovating, top dressing, and keeping the site neat and tidy. Turf to Foot Paths To be maintained and mowed as per the specification Fertilising Fertilise planting areas as required to achieve healthy growth and record in establishment log. Revegetation areas: Generally no fertilising, only if required use a Slow release fertiliser suitable for native plants. Mulch Maintain in a clean and tidy condition and reinstate mulch to required depth as specified in Schedules - Finishes. Keep away from tree trunks and the base of all plants. Allow to top up at the end of the Establishment Period. Pest and disease control Report all identified pest or disease to the Superintendent. Apply chemicals and follow manufacturer's instructions. Record in establishment log. Pruning of trees and shrubs Remove broken or dead branches, maintain natural habit of tree. Lightly prune all shrubs halfway through and at the end of the Establishment Period. Replacements Plants: Continue to replace failed, damaged or stolen plants. Replace all plants that are dying or have died during the establishment period. This is to be done progressively so that plant numbers match construction drawing numbers at the end of establishment period. List all replaced plants in establishment log. Topdressing When the turf is established, mow closely, remove cuttings and lightly top dress with sand. Rub the dressing well into the joints and correct any unevenness in the turf surface. Top dress all turf areas three quarters of the way through the Establishment Period. Fill and lift all hallows and depressions. Rake rocks, sticks and other debris from the top dress. Watering Water sufficiently to ensure healthy turf and plant growth. Maintain irrigation system where installed. All watering prior to PC being issued by the superintendent is at the contractors expense and cost to do so should be factored into preliminaries or planting rates. AFTER PC is given there is a provisional amount in the contract for 15 watering events (i.e watering of the entire softscape areas under contract that are not otherwise irrigated). | The purpose of this is to establish a rate for watering all softscape works under contract as one event. The 15 waters is a nominal guide to the amount of watering that may be required during the 12 week period. If we receive ample rainfall (30mm or more) during the 12 week period than watering would not be required for this week and hence all 15 waters may not then be claimed. Likewise, if the conditions are particularly hot and dry and additional watering is required than the contractor should notify the superintendent prior to using more than 15 waters. The contractor is to provide evidence of the number of watering events that takes place and on what day they are taking place. Watering on days immediately following large rain events is unlikely to be paid unless conditions require it but the contractor needs to discuss this with the superintendent rather than use all 15 waters unneccessarily. Plant health always remains the responsibility of the contractor and they should advise the superintenent for apporval of what watering requirements they think are necessary following Practical Completion (PC). It also puts the onus on the contractor to complete the works ready for PC shortly after planting works start. Weeding Remove all weed. Noxious weeds in revegetation areas are to be brushed and dabbed in lieu of spraying. Record in establishment log. Grassed areas Maintenance: Commence grass maintenance works at the completion of sowing, hydroseeding and turfing. Maintain healthy weed-free growth. Theft and Vandalism / Damage by others Report all damaged or missing landscape elements to the Superintendent. Record in establishment log. Log book Records: Keep a log book recording when and what maintenance work has been done and what materials, including toxic materials, have been used. Make the log book available for inspection on request. A1.3Completion Product warranty Certification: Submit the supplier's written statement certifying that plants are true to the required species and type, and are free from diseases, pests and weeds. Maintenance manual General: Submit recommendations for maintenance of plants. Cleaning Stakes and ties: Remove those no longer required at the end of the planting establishment period. Temporary fences: Remove temporary protective fences at the end of the planting establishment period. Watering It is anticipated that 15 waters will occur in the initial 12 week establishment period. Watering will occur over the whole site and will be sufficient to ensure satisfactory establishment of all plants. The timing of the 15 waters will be the contractor's responsibility. If adverse weather conditions require, additional watering will be considered. The contractor will be required to advise the landscape architect as to the reason for the additional watering and obtain approval for the additional watering prior to actual watering. The rate for watering is a provisional sum, and payment will upon production of invoices which show the actual date of watering KEY PLAN 0 5 10 15 20 25 (A1) 1:500 50 enn nS \etres (A3) 1:1000 NOOSA COUNCIL GENERALLY IN ACCORDANCE OPW12/0110.01 18 APR 2018 OOSA DOMAIN APARTMENTS - COVERSHEET MOTT MCN CN TON LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTU RE APPROVAL ISSUE LANDSCAPE DOCUMENTATION PACKAGE The following plans are to be read in conjunction with the: e Technical Specification and e Schedule (on drawing CSO2), and e Contract Documents where JFP are the Superintendent issuing the contract. JFP PROJECT: SHEET: DESCRIPTION: cso1 COVER SHEET cso2 SCHEDULE LPO1-LPO6 LANDSCAPE PLANS LDO1 LANDSCAPE DETAILS ASSOCIATED DOCUMENTATION: SCH1 SCHEDULE (A4 Document) SPC1 TECHNICAL SPECIFICATION (A4) c OP WORKS 2018-02-23 ME ME WA B DRAFT OP WORKS 2018-02-06 ME ME WA A PRELIMINARY 2018-01-15 ME ME WA ISSUE: DETAILS: DATE: DES: DC: QA: | } JFOP URBANCONSULTANTS PAUAN/ANNPAIND PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD URBAN DESIGNERS, BRISBANE - JFP House SURVEvoRS ~~~: 76 Ernest Street, ENGINEERS South Brisbane Qld 4101 P07 30120100 W www.jfp.com.au LANDSCAPE ARCHITECTS JF URBAN CONSULTANTS PTY. LTD. A.C.N. 050.414 045 LIENT: CLIENT NAME HERE PTY LTD COUNTRY CLUB VILLAGES ease) 0 AE = NOOSA DOMAIN APARTMENTS WALTER HAY DRIVE, NOOSAVILLE. COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD. ee COVER SHEET KEY PLAN AND NOTES PLAN NUMBER: B3730LA1-DA1 LA VM M1717L_A1 CS 01C
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (M1717 OPW Landscaping GIA OPW12-0110 01 pdf.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
SCHEDULE - LANDSCAPE & EXTERNAL WORKS
NOTE: QUANTITIES PROVIDED ARE TO ASSIST IN TENDERING AND ESTIMATION. Totals
ALL QUANTITIES ARE TO BE CHECK MEASURED BY TENDERERS WHEN SUBMITTING PRICING.
Item Legend Code Description Specification Unit Qty.
A PRELIMINARIES AND SITE WORKS, MINOR EARTHWORKS, DRAINAGE
1 0 Site Establishment
1 Preliminaries Refer to specification to determine minimum Sum 1
required works.
1 2 Program PROGRAM DATES, MILESTONES AND HOLDPOINTS 0
TO BE ADDED HERE
START DATE:
PC DATE:
ENTRY WALL START DATE:
REHAB AREAS START DATE:
1 3 Initial Site Rubbish Removal Removal of waste items located on site. Items to Item 1
be removed before works commences.
1 |4 Set-out by surveyor required Survey by setout required. Design CAD files can Day 0
be supplied as requested.
2 Site Works/ Minor Earthworks
2 1 Shaping - adjust civil profiles to desired shape & Civil to provide site at handover minus 100mm m2 1083
trim +/-50mm of finished surface levels shown on
landscape plans
2 2 Cultivation as per specification Planting areas - 200mm cultivation m 773
Gypsum: Incorporate at the rate of 0.25 kg/m2. Turf areas - 100mm
REFER TO DETAIL
2 3 HOLD POINT - CULTIVATION- LANDSCAPE
SUPERINTENDENT TO INSPECTION PRIOR TO
TOPSOIL - PROVIDE Min. 72 HRS NOTICE
2 4 Additional Topsoil due to poor site conditions If subgrade is deemed to be a poor, i.e weathered m? 773
IF ORDERED rock, schist or heavy clay INSTALL an additional
200mm of site topsoil prior to garden bed
preparation
2 5 TPF Tree protection as per VMP - Temporary Fencing m 0
3 Drainage
3 1 Subsoil drains - allowance only Type: 150 mm to raingardens and 100mm Lm 0
diameter to other areas. 100mm slotted HDPP Ag
Drain wrapped in geo-textile, drainage gravel to
be 20mm recycled concrete. Queensland
Recycling Pty Ltd Ph 135 135.
3 CON Subsoil drainage conduits Type: 100mm UPVC Item 275
3 Podium planter water retention layer- |F ORDERED |Type: 100mm HydroCell foam layer with m? 0
protective geotextile over. Refer to detail
3 4 Pits - typically 300 x300 ACO Pits - within planting areas | Type: 300 x300 mm ACO Pits Item 33
Hot dip galv. Grates to AS1428.1
B HARDSCAPE
Pavements
1 General for all pavements Sealer: Provide a penetrative sealer to all
pavements except asphalt.
Sample Panels: Provide a 1m square sample
panel of all pavements ona pallet such that it
can be moved around site as required to
compare to finished work.
Slip resisitance: All pavements to be non-slip as
defined in the BCA
2 P1 Concrete 1 Refer Architect Plans m 0
P2 Concrete 2 Refer Architect Plans m 0
4 P3 Unit paving on concrete subbase Size: 400 x 400mm each 220
Colour: TBC
Supplier: TBC
Sealed: TBC
4 5 GR1 Gravel mulch Type: 20mm washed river gravel over weedmat m 124
Depth: 100mm
5 Fences and Barriers
5 1 Fl Fence type 1 - 1800 high to boundary Refer to Refer Architect specifications m 0
5 2 F2 Fence type 2 - Pool Fence Refer to Refer Architect specifications m 0
5 3 HR Handrail and Balustrades Refer to Refer Architect specifications m 0
5 4 BL1 Feature Bollard Refer to Refer Architect specifications Item 23
C SOFTSCAPE
6 Edging
6 Concrete edge to planting areas Refer to Detail. 150x150mm. m 131
6 Timber edge to planting areas - If ordered Refer to Detail m 0
OOSA DOMAIN APARTMENTS - SCHEDULE
7 TU Turf- (includes watering costs until PC)
7 Imported Soil Blend 100mm deep Soil Blend to AS4419 m? 310
2 Site Topsoil with amendments - |F ORDERED Amendments to be added to the 100mm deep m? 0
site topsoil SPREAD BY CIVIL.
- Soil amendments for Site topsoil should include
the following: Gypsum at (2.5t/ha) following top
soil spread and Dynamic Lifter (2kg/10m2).
Please allow for both Turf topsoil and planting
soil
7 3 TU Turf Agrade 'Legend' turf supplied by Jimboomba Turf m 310
3 PA Planting Areas - (includes watering costs until PC)
8 1 Soil Blend - Site Topsoil Minimum depth 300mm deep Site soil amended m? 773
with gypsum. Mound to 450mm to centre of beds
8 |2 Soil Blend - Imported - If ordered 300mm deep Soil Blend to AS4419. Mound to m 0
450mm to centre of beds. Submit sample for
apporval prior to install.
8 3 Fertiliser Apply dynamic lifter or approved equivalent as
per specification
8 14 Mulch to planting areas Forest Litter mulch 100mm deep m 773
M3 - Site mulch (install only) Site Mulch m- 0
8 DG1 -Decorative Gravel - 100 mm thickness Gravel Type: 20mm washed river gravel m 0
9 Planting Stock
9 1 100 Lt stock Refer to Plant Schedule Item 0
9 {2 45 Lt stock Refer to Plant Schedule Item 65
9 13 25 Lt stock Refer to Plant Schedule Item 3
9 4 300mm pots Refer to Plant Schedule Item 471
9 5 200mm pots Refer to Plant Schedule Item 142
9 6 140mm pots Refer to Plant Schedule Item 2028
9 Relocation of existing palm trees. Refer Planting Plan Item 2
9 |7 Tube stock- Native tube min. 75mm Refer to Plant Schedule Item 0
9 8 Slow release nutrient bags Each 2711
9 Water retention additive for each plant Green Harvest Rainsaver Water crystals or Each 2711
approved similar
* JFP Arborist to inspect plants at nursery to ensure compliance with NATSPEC - Specifying trees
10 PC Post Practical Completion - Plant Establishment Period and Maintenance
Note Practical Completion will be given at the time the Local Authority provides
On Maintenance or Superintendant certifies completion.
10 |1 Plant Establishment Period - 12 week period Fortnightly Mowing and turf edging to all turf Week 12
areas. Fertilising, pruning of street trees as
required and chemical and physical weed
removal to all garden areas. Rubbish removal as
required
10 |2 TU, PA Watering Costs during Plant Establishment Period |Over the 12 week period wateringis required to Week 12
(Provisional Sum) maintain healthy plant growth. Allow for min. 15
waters (3-1st week, 2-2nd week, 1 per week for
Note: the cost of watering prior to Practical following 10 weeks).
Completion being given is to be allowed forin Note: Rates per water will be used if additional
preliminaries or within softscape rates watering is required oras a credit if there is
adequate rainfall. (30mm per week adequate
rainfall). Requirement: Advise superintendent if
All water dockets are to be provided to demonstrate oa: )-Req a . p
timi dvol f teri additional watering is required due to hot
Iming and volume or watering weather /dry conditions over and above the
provisional 15 waters.
Should the weather be excessively dry and/or
hot and additional watering is required notify
superintendent at once. Plant deaths due to
watering will be replaced at the constractors
expense.
10 |3 RV Watering Costs during Plant Establishment Period |Over the 12 week period wateringis required to Week 12
(Provisional Sum) maintain healthy plant growth. Allow for min. 15
waters (3-1st week, 2-2nd week, 1 per week for
Note: the cost of watering prior to Practical following 10 weeks).
Completion being given is to be allowed forin Note: Rates per water will be used if additional
preliminaries or within softscape rates watering is required or as a credit if there is
adequate rainfall. (30mm per week adequate
rainfall). Requirement: Advise superintendent if
All water dockets are to be provided to demonstrate “ae )-Req - . p
. dvol f . additional watering is required due to hot
timing and volume of watering weather /dry conditions over and above the
provisional 15 waters.
Should the weather be excessively dry and/or
hot and additional watering is required notify
superintendent at once. Plant deaths due to
watering will be replaced at the constractors
expense.
11 PC Post Practical Completion - Ongoing Maintenance
Note Practical Completion will be given at the time the Local Authority provides
On Maintenance or Superintendant certifies completion.
11 ]1 TU & PA Ongoing Maintenance after Plant Establishment Fortnightly Mowing and turf edging to all turf Month 9
to areas. Fertilising, pruning of street trees as
Turf & Planting Areas including podium if applicable |required and chemical and physical weed
removal to all garden areas. Rubbish removal as
required
11 |2 RV Ongoing Maintenance after Plant Establishment Fortnightly maintenance as per Specification Months 9
to such as edging to all adjacent turf areas,
Revegetation Areas fertilising, pruning of vegetation as required,
maintenance of stakes & tree guards, and
chemical and physical weed removal to all
rehabilitation areas. Rubbish removal as
required to achieve On & Off Maintenance.
11 1/3 DLP Defects Liability Period - 52 weeks Weeks
APPROVAL ISSUE
NOOSA COUNCIL
GENERALLY IN ACCORDANCE
OPW12/0110.01 18 APR 2018
c OP WORKS 2018-02-23 ME ME WA
B DRAFT OP WORKS 2018-02-06 ME ME WA
A PRELIMINARY 2018-01-15 ME ME WA
ISSUE: DETAILS: DATE: DES: DC: QA:
Sass
:
}
JFOP
PAUAN/ANNPAIND
URBANCONSULTANTS
PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
URBAN DESIGNERS BRISBANE - JFP House
SURVEYORS ~~~—- 76 Ernest Street,
South Brisbane Qld 4101
_—_—SOP'1007 3012 0100 W www. jfp.com.au
LANDSCAPE ARCHITECTS —JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050.414 045
ENGINEERS
LIENT: CLIENT NAME HERE PTY L
COUNTRY CLUB VILLAGES
NOOSA DOMAIN
APARTMENTS
WALTER HAY DRIVE,
NOOSAVILLE.
SCALE:
COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
ee
COVER SHEET
SCHEDULE
PLAN NUMBER: B3730LA1-DA1 LA VM
M1717L_A1 CS02C
Page 3
UNWELL EAM ERE IY EPR EU NIH
LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE
LPOS5 -
INSET A
APPROVAL ISSUE
UNIT TYPE 1_
UNIT TYPE 2
PLANT LISTA
» UNIT TYPE 2
PLANT LIST B
UNIT TYPE 2
(MIRRORED)
PLANT LIST A
~s
. UNIT TYPE 2 «
» UNIT TYPE3
(MIRRORED)
PLANT LIST Bj oe
UNIT TYPE 2
PLANT LIST B
~
IS
UNIT TYPE 3 UNIT TYPE 2
PLANT LISTA
UNIT TYPE 3
&
&
&
~ >
°o
2
=
Refer LPO6 for typical unit planting
UNIT TYPE 2
(MIRRORED)
PLANT LIST B
Vint TYPE 2
Mien Refer LPO6 for typical unit planting
PLANT LISTA
UNIT TYPE 2
(MIRRORED)
PLANT LIST A
UNIT TYPE 2
PLANT LIST A
UNIT TYPE 2
(MIRRORED)
PLANT LIST A
UNIT TYPE 2
PLANT LIST A
v
UNIT TYPE 1
rd
pe
UNIT TYPE 2
PLANT LIST B
J
UNIT TYPE 2
PLANT LIST B
©
a hs
UNIT TYPE 2
(MIRRORED)
PLANT LIST B
UNIT TYPE 2
PLANT LIST B
UNIT TYPE 2
(MIRRORED)
PLANT LIST B
UNIT TYPE 1
UNIT TYPE 1
Ae ae ae ee a a
nh a nN a 5
| UNIT TYPE 2 UNIT TYPE 2 UNIT TYPE 2 Q UNIT TYPE 2 Wi UNIT TYPE 2
PLANT LIST B (MIRRORED) PLANT LIST B (MIRRORED) PLANT LIST B
PLANT LIST B PLANT LIST B
de
<)) cen A ‘LPOS -
INSET B
a
=LP04 -
Refer LPOG for typical unit planting
. Cc OP WORKS. 2018-02-23 ME ME WA
LPO4 ad ‘ BLUE GUM STREET I NS E I B — B PRELIMINARY OP-WORKS 2018-02-06 ME ME WA
’ A DRAFT FOR COMMENT 2018-01-15 ME ME WA
: 4 ISSUE: DETAILS: DATE: DES: DC: QA:
\ N S ET _ SWALLOW STREET
f\ =
———
|
LLL ge =a
= ——_—___—— cones} AN _— FRAN NEA
|
wall to be re-instated following = wall to be re-instated following === NOTE: Planting above retaining —
earthworks to make good any a Z wall to be re-instated followin, = ==
earthworks to make good an’ 6
—————— damaged during areas damaged during y earthworks to make good any U R B A N Cc O N S U L T A N T S
ee ee areas damaged during CO
LL - construction. PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
7 URBAN DESIGNERS BRISBANE - JFP House
a y SURVEYORS 76 Ernest Street,
ENGINEERS South Brisbane Qld 4101
P07 30120100 W www.jfp.com.au
LANDSCAPE ARCHITECTS JF URBAN CONSULTANTS PTY. LTD. A.C.N. 050.414 045
LIENT: CLIENT NAME HERE PTY LTD
COUNTRY CLUB VILLAGES
(—_» KEY PLAN 0 25 5 75 10 125 (A1) 1:250 25
a Metres
ey, Scale 1:250 @ Al (A3) 1:500
PROJECT TITLE:
LEGEND NOOSA DOMAIN
APARTMENTS
SQUARE SURFACE DRAIN Jens] PAVEMENT TYPE 1 PLANTING AREA UNIT TYPE 1 WALTER HAY DRIVE,
& ee ; REFER ARCHITECT REFER TO SCHEDULE REFER LPO6 NOOSAVI LLE
"7 SUBSOIL DRAINAGE P3 PAVER ON SUB BASE REVEGETATION AREA UNIT TYPE 2
gt)” | REFER TO DETAIL & SCHEDULE LJ | Rerer To SCHEDULE REFER TO SCHEDULE PLANT LIST A
At REFER LPO6
M1 MOWING EDGE F1 FENCE TURF UNIT TYPE 2 - MIRRORED FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WAITTEN CONSENT OF FP URBAN CONSULTANTS OT (7D,
= CONCRETE [> F1. - ACOUSTIC 1800H REFER TO SCHEDULE PLANT LIST A WA
REFER TO SCHEDULE REFER TO SCHEDULE REFER LPO6
M2 MOWING EDGE 5 FENCE 5207 O~] GRAVEL MULCH UNIT TYPE 2 LANDSCAPE PLAN
b-----4 CONCRETE OR TIMBER F2 - 1500 TIMBER PALING DEN S05 REFER TO SCHEDULE PLANT LIST B
REFER TO SCHEDULE REFER TO SCHEDULE avo REFER LPO6 COVER SHEET
FALL AS DIRECTED HR HANDRAIL - RAIL ONLY UNIT TYPE 2 - MIRRORED
—- COMPLIES WITH AS1428 PLANT LIST B
REFER TO SCHEDULE REFER LPO6
HC HOSE COCK B2 REMOVEABLE / FEATURE BOLLARD NOOSA COUNCI L
REFER HYDRAULIC ENGR'S PLANS 8 p | TYPE B2 .
REFER TO SCHEDULE GENERALLY IN ACCORDANCE 7290 @ At
PLAN NUMBER: B3730LA1-DA1 LA VM
JOB #: 0) eee)
M1717L_A1 LP O1C
OPW12/0110.01 18 APR 2018
Page 4
GENERALLY IN ACCORDANCE “ \
OPW12/0110.01 18 APR 2018 ‘ 5 Pusan 3 CALCC
: 1 WAT flo aa CAR aoe
a \¥
ye
: Be, 0 eh
NOOSA COUNCIL
1 EXpalm
Shy p> :
“R CY, 6 PHI xan © “ - a ~
Ly & f Bo Li (a CONCRETE GARDEN
Y
g
2 Bh ary
L fears <7 i
ot, ARD 10 TUL vio SoS — Ou A001 - SEER
3 GRECC
1 ElLAeu
18 CAS Cl J
2 MYOell
3 PHI xan
3 LEP car
25 ZOY ten
5 CAR app.
7 CASCI BAC cit
3 LEP car
1
2 ElAe
9 CAR Ypp 1 ELAeum > EN, cr ie
30 ZOYfen 1 SYZBC 3 GRE cc
8
14 CAS Cl
#
2 CAR app
PAVEMENT SPECIFICATION PAVEMENT SPECIFICATION
e
@ 8 8g
a
7_\ CONCRETE GARDEN EDGE 4 CAS CI a
LDO1 a ~m |
oO
8 ZOYte s
eee a |
a esdea be : et ome te a rr naan bee oF
e & 5 “Bye 1,. COR n ee >i a
NM «
OTE: FALLS TO PIT
ai eee eae TO N EO NOTE: FALLS TO PIT. | 2 . |
A ~ PITS TO BE CONNECTEDTO | » oO)
WATER. LLL A NEO KNO ROOF WATER OR STORM WATER.* O va
~ REFER ARCHITECT PLANS FOR, + ~ REFER ARCHITECT PLANS FOR, |
s-
3 LEP car.
42 ZOYte
1 BAC cit,
~ 3 GREC
CLI min
Chl mi
Refer LP0O6 for typical unit planting
L]
A LEP car
20 CAR app
1 WAT flo
6 LEP PC
8 CASCI
Refer LP06 for typical unit planting
25 CAR app
4 MEL thy
A LEP PC
2 ElAeu
3 SYZHG
28 MYOFl|
1 ELA ret
24 TUL vio
13 PHI xan
IE
2 SYZBC
car
3.L
2 SYZBC
=== . 3 PHI xan
11 CAS Cl
NOTE: FALLS TO PIT
- PITS TO BE CONNECTED TO
NOTE: FALLS TO PIT
~ PITS TO BE CONNECTED TO.
NOTE: FALLS TO PIT
~ PITS TO BE CONNECTED TO
NOTE: FALLS TO PIT
- PITS TO BE CONNECTED TO
ROOF WATER OR STORM ROOF WATER OR STORM
WATER. WATER. ROOF WATER OR STORM ROOF WATER OR STORM ,
- REFER ARCHITECT PLANS FOR ~ REFER ARCHITECT PLANS FO! WAUSR WATER. .
PAVEMENT SPECIFICAT MENT SPECIFICATION ’ Serie ~ REFER ARCHITECT PLANS Ry
PAVEMENT SPECIFICA
5 NOTE: FALLS TO PI
. 6 Dew ee meee
13 CAS Cl
3 MEL6T
op oe eee tee i) are NOTE: FALLS TO ne
«<p:
2 OC eee es eee
0 1 2 3 4 5 (A1) 1:100
TO oN TN NT
LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE
APPROVAL ISSUE
c OP WORKS 2018-02-23 ME ME WA
B PRELIMINARY OP-WORKS 2018-02-06 ME ME WA
A DRAFT FOR COMMENT 2018-01-15 ME ME WA
ISSUE: DETAILS: DATE: DES: DC: QA:
Sass
—a—
}
JFOP
PAUAN/ANNPAIND
URBANCONSULTANTS
PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
URBAN DESIGNERS BRISBANE - JFP House
SuRvevors.~=é«7'6 Ernest Sttreeet,
=——____— South Brisbane Qld 4101
ENGINEERS
_—_—S«P'007 3012 0100 W www. jfp.com.au
LANDSCAPE ARCHITECTS JEP URBAN CONSULTANTS PTY. LTD. A.C.N. 050.414 045
LIENT: CLIENT NAME HERE PTY LTD
COUNTRY CLUB VILLAGES
ease?) 0 Ae =
NOOSA DOMAIN
APARTMENTS
WALTER HAY DRIVE,
NOOSAVILLE.
COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
ee
LANDSCAPE PLAN
1:100 @ Al
PLAN NUMBER: B3730LA1-DA1 LA VM
10
(A3) 1:200
we MI1717L_Al LP O2C
Page 5
| 18 CAS Cl NOOSA COUNCIL
5 TULvio
| 3 MEL thy a GENERALLY IN ACCORDANCE
| - OPW12/0110.01 18 APR 2018
22 CAR app
SO
SS
SO
x
JOINS SHEET LPOS
|
=
SO
&
SS
»
L, 15 CAS Cl |
| 13 CAR app 7_\ CONCRETE GARDEN EDGE 2 PHI xan
ty 1. ELAobo {Dor 3 LEP PC H
3 PHI xan 15 CAR app a |
1 ElAret ]
20 CAS Cl NOTE: FALLS TO PIT, |
50 ZOY ten 7 x0: wares offs Sy
WATER.
~ REFER ARCH
LANS FOR |
PAVEMENT
\TION
3 LEP car
2 RAN fit
25 CAS Cl
1 WAT flo
< 2 PHI xan 5 CORne
1 COR neg 13 TUL vio |
2 PHI xan 6 NEOKN
} ere ose mS
5 LEP PC
20 ZOY ten “15 TUtvio 7 >, |
ELA ret 2 LEP 11 CAS Cl
5RLOY ten “1 1 WAT flo
/ 9 9 TULvio
5 LEP car
4 MELthy
26 CAS Cl
1 ELA obo
7 TULvio
3 LEP car
2 PHI xan
re . 50 ZOY ten 24 CAR app
NOTE: FALLS TO PIT 6 CAR SO 60 ZOY ten
soo WATESONSTON 2 RAN fit A PHI xan
ATER.
~ REFER ARCHITECT PLANS FOR
PAVEMENT SPECIFICATION
6 CAR app
65 ZOY ten
4 L vio
6 TULvio
1 ElAret
50 ZOY ten
3 CALCC
1 SYZBC
7 LEP car
2 SYZHG
16 CAR app.
1 BAC cit
—}13 SyZ BC
If 45 zoy ten
2-SYZ HG
/-3 LEP car 3 LEP PC_NS
18 CAR app 65 ZOYte I ‘, |
y—4 PHI xan
MW
@ 4
A
|
os
(9 ) : ce
3 SYZHG
A PHI xan
3 CALCC
4A CALCC
15 MYO ell 2 ELAeum
33 CAS Cl
6 LEP car
NOTE: FALLS TO PIT
- PITS TO BE CONNECTED TO
ROOF WATER OR STORM
WATER.
~ REFER ARCHITECT PLANS FOR,
ENT SPECIFICATION
NOTE: FALLS TO PIT
- PITS TO BE CONNECTED TO
ROOF WATER OR STORM.
WATER. {
NOTE: FALLS TO PIT
- PITS TO BE CONNECTED TO
6 LEP car
™ ROOF WATER OR STORM. |
Poor
WATER.
~ REFER ARCHITECT PLANS FO}
MENT SPECIFICATION
~ REFER ARCHITECT PLANS FO}
MENT SPECIFICATION
NOTE: FALLS TO PI
De eee eee Se eemee Be NOTE: FALLS TO PI
— 2A) te ee Qs peers 0
& NOTE: FALLS TO PI
.. cl eae
Beesd
H+
0 1 2 3 4 5 (A1) 1:100
(A3) 4:200
AVN ATAV NENT TAY CAEP AV CO
PNP Sea Gen ael el eenseekocy are) OU MU a
APPROVAL ISSUE
c OP WORKS 2018-02-23 ME ME WA
B PRELIMINARY OP-WORKS 2018-02-06 ME ME WA
A DRAFT FOR COMMENT 2018-01-15 ME ME WA
ISSUE: DETAILS: DATE: DES: DC: QA:
|
}
JFOP
PAUAN/ANNPAIND
URBANCONSULTANTS
PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
URBAN DESIGNERS BRISBANE - JFP House
SuRvevors.~=é«7'6 Ernest Sttreeet,
=——____— South Brisbane Qld 4101
ENGINEERS
_—_—S«P'007 3012 0100 W www. jfp.com.au
LANDSCAPE ARCHITECTS JEP URBAN CONSULTANTS PTY. LTD. A.C.N. 050.414 045
LIENT: CLIENT NAME HERE PTY LTD
COUNTRY CLUB VILLAGES
ease?) 0 Ae =
NOOSA DOMAIN
APARTMENTS
WALTER HAY DRIVE,
NOOSAVILLE.
COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
ee
LANDSCAPE PLAN
1:100 @ Al
PLAN NUMBER: B3730LA1-DA1 LA VM
we MI1717L_A1 LP O3C
Page 6
JOINS SHEET LPO2
BLUE GUM STREET
=|
|
JOINS SHEET VM
earthworks to make good any
areas damaged during
construction.
NOTE: Planting above retaining TT
wall to be re-instated following = ee
earthworks to make good any i
areas damaged during
construction.
TVM
S SHEE
|
I
|
|
|
[o
=
NOTE: Planting above retaining
wall to be re-instated following
/ earthworks to make good any
7 areas damaged during
construction.
SS 7 —
4 TO BE CONNECTED TO - Dr ~ a a a
i WATER OF 2 2 wo
we R STORM, a L — 7 TUL vio-
SER ARCHITECT PLANS FO} . -Y a xa Gn
EMENT SPECIFICATION ‘ ai. A ——a PHIxan -
foes peveroeernae ese renee > <— J MYOell
Jk
<4 ELA ret < =
LEP car
z 15 Bas cl 2 = |
PN
ty
_JOINS SHEET LPO3
- a,
JOINS SHEET LPOS
SWALLOW STREET <
NOOSA COUNCIL
GENERALLY IN ACCORDANCE
OPW12/0110.01 18 APR 2018
0 1 2 3 4 5 (A1) 1:100
(A3) 1:200
LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE
Eee ee
APPROVAL ISSUE
Cc OP WORKS 2018-02-23. ME ME WA
B PRELIMINARY OP-WORKS 2018-02-06 ME ME WA
A DRAFT FOR COMMENT 2018-01-15 ME ME WA
ISSUE: DETAILS: DATE: DES: DC: QA:
wii SS —
PAUAN/ANNPAIND
URBANCONSULTANTS
PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
URBAN DESIGNERS, BRISBANE - JFP House
SURvevors ~~~: 76 Ernest Street,
South Brisbane Qld 4101
_—_—S«P'007 3012 0100 W www. jfp.com.au
LANDSCAPE ARCHITECTS JEP URBAN CONSULTANTS PTY. LTD. A.C.N. 050.414 045
ENGINEERS
LIENT: CLIENT NAME HERE PTY LTD
COUNTRY CLUB VILLAGES
NOOSA DOMAIN
APARTMENTS
WALTER HAY DRIVE,
NOOSAVILLE.
COPYRIGHT © 2017 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JEP URBAN CONSULTANTS PTY LTD.
ee
LANDSCAPE PLAN
1:100 @ A1
PLAN NUMBER: B3730LA1-DA1 LA VM
JOB #: SCOPE: SHEET: Es
mM 1717L_Al LP O4C
Page 7
\X
Q
Ae ES
WA
20 CAS Cl
4 GRECC
1 WAT flo
2 SYZBC
3 ElAret
4 CALCC
1 SYZBC
PLANT SCHEDULE
CODE BOTANICAL NAME POT SIZE HEIGHT SPREAD |QUANTITY
TREES
ELA eum Elaeocarpus eumundii 45L 1800mm 1200mm 15
ELA obo Elaeocarpus obovatus 45L 1800mm 1200mm 5
ELA ret Elaeocarpus reticulatus 45L 1800mm 1200mm 12
RAN fit Randia fitzalanii 45L 1800mm 1200mm 4
RHA exc Raphis excelsa 45L 1800mm 1200mm 2
WAT flo Waterhousia floribunda 45L 1800mm 1200mm 6
SHRUBS
BAC cit Backhousia citriodora 25L 1200mm 600mm 3
CAL CC Callistemon ‘Captain Cook’ 300mm 1200mm 600mm 17
COR neg Cordyline negra 300mm 1200mm 600mm 13
LEP car Leptospermum cardwell 300mm 1200mm 600mm 59
LEP PC Leptospermum 'Pink Cascade’ 300mm 1200mm 600mm 26
NEO KNO Neoregelia ‘Knockout’ 200mm 1200mm 600mm 24
MEL CT Melaleuca ‘Claret Tops' 300mm 1200mm 600mm 17
MEL thy Melaleuca thymefolia 300mm 1200mm 600mm 23
PHI xan Philodendron Xanadu 300mm 1200mm 600mm 81
SYZ BC Syzygium ‘Bush Chijristmas' 300mm 1200mm 600mm 18
SYZHG Syzygium ‘Hinterland Gold' 300mm 1200mm 600mm 11
GROUNDCOVERS
CAR app Carex appressa 140mm 500mm 300mm 350
CAS Cl Casuarina ‘Cousin It' 140mm 500mm 300mm 321
CLI min Clivia miniata 200mm 500mm 300mm 16
GRE CC Grevillea 'Cooroora Cascade’ 300mm 1200mm 600mm 13
MYO ell Myoporum ellipticum 140mm 500mm 300mm 112
TUL vio Tulbaghia violacea 140mm 500mm 300mm 116
ZOY ten Zoysia tenuifolia 140mm 500mm 300mm 703
TOTAL PLANTS 1967
OPW12/0110.01 18 APR 2018
NOOSA COUNCIL
GENERALLY IN ACCORDANCE
TO NN NTT
LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE
| APPROVAL ISSUE |
a
OP WORKS 2018-02-23 ME ME WA
PRELIMINARY OP-WORKS 2018-02-06 ME ME WA
DRAFT FOR COMMENT 2018-01-15 ME ME WA
> o
ISSUE: DETAILS: DATE: DES: DC: QA:
a VFOP
PAUAN/ANNPAIND
URBANCONSULTANTS
PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
BRISBANE - JFP House
|
SURVEYORS
76 Ernest Street,
South Brisbane Qld 4101
ENGINEERS P07 30120100 W www.jfp.com.au
RCHITECTS JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050414 045
LIENT: CLIENT NAME HERE PTY LTD
COUNTRY CLUB VILLAGES
ease?) 0 Ae =
NOOSA DOMAIN
APARTMENTS
WALTER HAY DRIVE,
NOOSAVILLE.
NSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY
i a mt
FORM LE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
ee
LANDSCAPE PLAN
1:100 @ Al t
PLAN NUMBER: B3730LA1-DA1 LA VM
M1717L_A1 LP OSC
Page 8
TO NN NTT
NOOSA COUNCIL
GENERALLY IN ACCORDANCE Tree tobe planted 100mm aren inal one thir large APPROVAL ISSUE
above finished or natura RR. a nominal onet irc arger
OPWHZIONIO.OT 18 APR 2018 Sem ean
immediately following planting. — ~ Ls yg heavy clay soils.
LANDSCAPE ARCHITECTURE - ECOLOGY - ARBORICULTURE
Embed hardwood stakes to
600mm depth and clear of
rootball. Secure with .
Form mounding to the base of each hessian ties in a figure eight &
OPTIONS: NB: All plantholes are to be a ;_—_ Plant to form a shallow watering loop. Refer to plant 3
Single Stake nominal one third larger than the ring around the perimeter of each schedule for number/size of | x|5
Tubstock tie rootball size, and to have plant hole. Keep base of plant clear stakes per tree. | 5 5
NB: All plantholes are x of cultivated edges in heavy clay / of narticularly in roscoe ond | is 2
to be a nominal one ol Form mounding to the base L 3 groundcovers. Place mulch to rest 3/8
third larger than the of each plant to forma —— OYE of planting zone. Form mounding to base of | | clo
football se, ang ° PLAN shallow watering ring around | v~ VY l| plant to form a shallow | | E = Imported soil blend
. ave roughened edges L the perimeter of each plant i i o| a i i
Cultivated Subgrade - Refer in heavy clay soils. f | hole. Keep base of plant Pear LY varimneter af plant hole ae with ate itive aed
to Finishes Schedule Lt of mulch to avoid crown rot- | | ;— Imported soil blend with water Keep base of trunk clear of ” fertiliser. Fertiliser
Mulch blend - Refer to Tubstock stake ——_> _/° I particularly in grasses and | | retention additive and fertiliser. mulch. Place mulch to rest ig not to be in contact
Finishes Schedule Imported soil blend— | - : > groundcovers. Place mulch \ | Fertiliser not to be in contact of planting zone. 5 with tree roots.
—Soil blend - Refer to with water \ to rest of planting zone. with tree roots.
Finishes Schedule retention additive | AY
POPPPPPPPPPPPYY errs
OLYYYYYYY YY YY YY LYYYYV YY VY YS m
!
per native tube peerage 10g Agriform
Min. 2-per plant
(N-tube) |
> ertiliser 10g Agriform ‘
Cultivate-plant-hole 3 3 333 53 Min. 2 per plant Roughen base of-plant
orriptine to-a 2 22 hole-to a-minimum
minimum depth of Roughen base of plant hol depth of 100mm ifin
100mm in heavy clay toa minimum depth of heavy clay soils.
soils. ifinh | ils.
subgrade 100mm if'in heavy clay soils | |
(41 \ TYPICAL SOIL PROFILE (2. \ TUBESTOCK/RIPLINE PLANTING DETAIL (3\ GENERAL PLANTING DETAIL (4 \\ ADVANCED TREE PLANTING - 45 TO 200L BAGS
YK) Scale 1:10 ay, Scale 1:10 Y /) Scale 1:10 XK Scale 1:10
1000 NOTES
7 — 1. All plantholes are to be a nominal OPTIONS
one third larger than the rootball size, Mowine Ed 3 op WoRKS 5018.02.23 ME ME WA
/ \olz and to have cultivated edges in heavy owing Edge L] A DRAFT OP WORKS 2018-02-06 ME ME WA
| |Slé clay soils. Refer Specification Tree to be planted 150mm NB: All plantholes are to be ISSUE. DETAULS: DATE. DES: DC: OA:
\! : I] |/ als 2. Tree to be planted 100mm above Water pipe LJ above finished or natural ~) a nominal one third larger
oe finished levels to allow for slumping. . ground level (NGL) to allow for ~~ \ than the rootball size, and ee
— Root B + | ——
S| © Water rootball immediately following 900 Deep 3m Long later slumping.Water rootball \ I 57 — | tohave cultivated edges in
PLAN antings ~ >“ immediately following planting. ILA heavy clay soils.
(| Embed hardwood stakes to ZESS | pp
_ 600mm depth and clear of embed hard dstak | |
rootball. Secure with hessian ties mbed hardwood stakes to | |
in a figure eight loop. Refer to 600mm depth and clear of —— | | 4 OPTIONS: CUNY ANI
LI plant schedule for number of rootball. Secure with XK] 5 Guy Ropes URBANCONSULTANTS
|| X stakes per tree. hessian ties in a figure eight | y vio Duekbl anchors or approves
loop. Refer to plant gyo PLANNERS BRISBANE - SUNSHINE COAST - CENTRAL QLD
-__Form mounding to base of plant to schedule for number/size of | 5 6 a ie emest sect
form a shallow watering basin stakes per tree. | s/o ENGINEERS py 3012 0100 Wwwnurjfp.comau
| around perimeter of plant hole. | CG 5 LANDSCAPE ARCHITECTS —jFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050414 045
Keep base of trunk clear of mulch. NOTES EDGING SIZE: 2°
| oo . : w 5
Place 100mm depth mulch to rest of 1. Ensure edging is flush with the — . | E|.2 A Se ay
NOTES: PIPE DIAMETER top of adjacent d 110 x75 L] Form mounding to base of plant Q\2 COUNTRY CLUB VILLAGES
| planting zone as shown on plans, ae OP OF adjacent mowed Brass or to form a shallow watering basin mo
Imported soil blend 1. Ensure all sub-soil drainage (SSD) lines fall to 65mm [| other surface treatment. 150 x 150 d : fol er als
| —— with water retention stormwater connection points at 1:100 grades. 100mm 2. Add construction joints where 230 x 230 [| Rana ee ot truck clean oe ore. | | ° Imported soil blend with
| 600 additive and fertiliser. 2. Where SSD lines are beneath areas requiring a movement stresses are likely to 150 x 150 C] ich Ich f [3 water retention additive
| Fertiliser not to be in compacted sub-base (with a standard compaction of 150mm L] occur. with M12 re-inforcement ola ‘i - Place mulch to rest o S and fertiliser. Fertiliser
ui contact 95% Dry Density), use pipe with a minimum 3mm ° . . planing zone. not to be in contact with
/ | S with tree roots. wall thickness. Lay in 100mm bedding sand surround Prepared Concrete edging with
Tita AK ee =| _ Fertiliser 10g Agriform instead of gravel. planting rounded edges NOOSA DOMAIN
x Min. 2 per plant. Finished surface area Turf: agppermost
“| *< , Position in bottom treatment. hei ht APARTM ENTS
corner of hole se ° <— Topsoil as specified a fly WALTER HAY DRIVE,
——_+ root ba on
5 Geotextile fabric to 2 Fertiliser 10g Agrifor NOOSAVILLE.
Surround and line Min. 2 per plant SCALE: .
Roughen base of planttrote J rene = AS SHOWN @ Al
P 3 l to a minimum depth of + 20mm drainage Tf FORM! O8 BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENTOF ITB URBAN CONSULTANTS TY
3 100mm if in heavy clay Te Tate aggregate as per Roughen base of plant—____$5-S%
Soils. specification. Minimum Crepdcted llberadle 3) holeto a-minimum
100mm depth of cover ba depth of 100mm if in LANDSCAPE DETAIL
I .
C) sn oS over agricultural pipe. | heavy-clay soils. SC S
|
Corrugated slotted ae - SO FTS CAP E
V Vv Polyethelene pipe
wrapped in filter cloth
to AS2439.1 cloth. Filter
cloth is to be non-woven
(5_\ TYPICAL STREET TREE PLANTING (6_ SUBSOIL DRAINAGE needle-punched fabric. “7 CONCRETE GARDEN EDGING (8 ADVANCED TREE PLANTING - 400L TO EXGROUND SIZE
- Scale 1:10 - Scale 1:10 - Scale 1:10 - Scale 1:10
SS 4 SY SY M1717L_A1 LD 01B