Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Avocet Pde OPW - App C CMP · OPW20/0092

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Table of Contents

1.     Important Note                                                                                                                                             2

2.     Introduction                                                                                                                                               3
       2.1 Purpose                                                                                                                                                3
       2.2 Scope of this Plan                                                                                                                                     3
       2.3 Proposed Works                                                                                                                                         3
       2.4 Site Location                                                                                                                                          3
       2.5 Contact Details                                                                                                                                       4

3.     Construction Management                                                                                                                                    5
       3.1 Approach                                                                                                                                               5
       3.2 Approvals                                                                                                                                              5
       3.3 Site Security                                                                                                                                          5
       3.4 Public / Worker Safety                                                                                                                                 5
       3.5 Traffic Management Plan                                                                                                                                6
       3.6 Worker Carparking                                                                                                                                      6
       3.7 Communications Protocol / Complaints Procedure                                                                                                         6
       3.8 Existing Infrastructure                                                                                                                                7
       3.9 Fencing                                                                                                                                                7

4.     Construction Methodology                                                                                                                                  8
       4.1 Demolition and Excavation                                                                                                                             8
       4.2 Construction Sequence and Planning                                                                                                                    8
       4.3 Rubbish Removal                                                                                                                                       8

5.     Environmental                                                                                                                                              9
       5.1 General                                                                                                                                                9
       5.2 Noise and Vibration Management                                                                                                                         9
       5.3 Air Quality / Dust Management                                                                                                                          9
       5.4 Stormwater and Sediment Control                                                                                                                      10
       5.5 Waste Management Plan                                                                                                                                10




List of Figures
Figure 1: Site Location Map ...................................................................................................................................... 4



List of Attachments
Attachment A - Erosion and Sediment Control Plan by TOD’s Engineering




RG Strategic                                                      Construction Management Plan                                                                     1

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Avocet Pde OPW - App C CMP.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.