Avocet Pde OPW - App C CMP · OPW20/0092
Table of Contents
1. Important Note 2
2. Introduction 3
2.1 Purpose 3
2.2 Scope of this Plan 3
2.3 Proposed Works 3
2.4 Site Location 3
2.5 Contact Details 4
3. Construction Management 5
3.1 Approach 5
3.2 Approvals 5
3.3 Site Security 5
3.4 Public / Worker Safety 5
3.5 Traffic Management Plan 6
3.6 Worker Carparking 6
3.7 Communications Protocol / Complaints Procedure 6
3.8 Existing Infrastructure 7
3.9 Fencing 7
4. Construction Methodology 8
4.1 Demolition and Excavation 8
4.2 Construction Sequence and Planning 8
4.3 Rubbish Removal 8
5. Environmental 9
5.1 General 9
5.2 Noise and Vibration Management 9
5.3 Air Quality / Dust Management 9
5.4 Stormwater and Sediment Control 10
5.5 Waste Management Plan 10
List of Figures
Figure 1: Site Location Map ...................................................................................................................................... 4
List of Attachments
Attachment A - Erosion and Sediment Control Plan by TOD’s Engineering
RG Strategic Construction Management Plan 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Avocet Pde OPW - App C CMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.