               NOOSA COUNCIL IDAS Development Application Decision Notice                                                         3




                                                                Noosa Council Conditions
                                                                INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


                        Land Development

               1.       The temporary emergency vehicle access, located on Council land, that runs past the Noosa Heads Police
                        Station to the rear of the St Vincent De Paul site - is permitted to be utilised until the Manager of Land
                        Development advises in writing that “the access is to discontinue”.

                        After which advice, emergency vehicles shall gain access to the south east corner of the site internally in
                        accordance with proposal plan SK-04, Issue C, Job No. 01002, dated 3/4/01, as submitted by Andrew
                        Hillhouse Architects - except as modified herein.

               2.       The proposed alignment of the emergency vehicle access (as shown on proposal plan SK-04, Issue C,
                        Job No. 01002, dated 3/4/01, as submitted by Andrew Hillhouse Architects), shall be realigned to minimise
                        the destruction of existing vegetation. In this regard, the emergency vehicle access shall be at least 3
                        metres from the front boundary and at least 1 metres from the side boundary. The existing vegetation
                        shall be supplemented (where necessary), to ensure the buildings and the emergency vehicle access are
                        visually screened from Cooyar Street.

                        Plans and specifications for these works shall be prepared and submitted to Council for Operational Works
                        approval and the cost of constructing the internal emergency vehicle access shall be at no cost to Council.

               3.       Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties to the
                        reasonable satisfaction of the Manager of Land Development. Details of the stormwater drainage scheme
                        shall be submitted in conjunction with a Development Permit for Operational Works.

               4.       Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on
                        Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the
                        rates applicable at the time of payment. An estimate only of the contribution rates under the current
                        policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index,
                        All Groups Brisbane from September 2005 until the date of payment.
                        Stage 3 – March 2001
                        Water Supply                  $38,712
                        Sewerage                      $19,561
                        TOTAL                         $58,273
                        Stage 4 – September 2005
                        Water Supply                  $63,237
                        Sewerage                      $32,577
                        TOTAL                         $95,814
                        All headworks contributions must be paid prior to the issue of a Development Permit for Operational
                        Works.

                        Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
                        contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
                        In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
                        the contribution or trading bank guarantee will be returned.

               5.       Deleted.

               6.       The new building extensions shall be connected to Council's existing water supply and sewerage
                        reticulation systems in accordance with Council’s standards and requirements and at no cost to Council.




               SEP o:\database\onestop\decision.doc


                                                                                                                    Print Date: 7 April 2021, 3:41 PM
Log in to download the original file

Attachment 9 - Development Approval 21675 DA.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.