Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Decision Notice OPW23 0147

of 8

Page text shows just the words. Original shows the document exactly as it was published.

                           Plan No.        Rev.   Plan/Document Name                         Date

                           -               -      Klobas Landscape Plan                      19 September 2023
                                                  Prepared by Earth Creation Landscapes

                           124-002-200     C      Earthworks Layout Plan                     9 November 2023
                                                  Prepared by BAX Engineering

                           124-002-201     C      Earthworks Sections                        9 November 2023
                                                  Prepared by BAX Engineering

                           124-002-300     C      Roadworks and Drainage Layout Plan – 9 November 2023
                                                  Ground Floor
                                                  Prepared by BAX Engineering

                           124-002-301     C      Roadworks and Drainage Layout Plan – 9 November 2023
                                                  Lower Floor
                                                  Prepared by BAX Engineering

                           124-002-302     C      Roadworks Sections                         9 November 2023
                                                  Prepared by BAX Engineering

                           H02             B      Lower Floor Plan Drainage                  June 2023
                                                  Prepared by BRW Hydraulics

                           H03              B     Ground Floor Plan Drainage                 June 2023
                                                  Prepared by BRW Hydraulics

                           H04             B      Upper Floor Plan Drainage                  June 2023
                                                  Prepared by BRW Hydraulics

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 3 January 2026, unless an application to extend the currency period
                      is approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               3.     All necessary approvals from external service providers (e.g. Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               4.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               5.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               6.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.       Civil engineering works; and



                                                                                                       Page 2 of 8
Document Set ID: 22752816
Version: 3, Version Date: 05/01/2024
Log in to download the original file

Decision Notice OPW23 0147.pdf · 156 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.