Original source · versioned page text
2017-06-15 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 15 JUNE 2017
24. The internal driveway (or any other form of hard pavement for that matter) within the
drip zone of any trees on site to be retained shall be designed to allow the flow of water
through the pavement or be designed to direct stormwater runoff to the trees root
system. To this extent the uncovered visitor spaces towards the frontage of the
development may be able to incorporate pervious paving that allows water penetration.
25. All pavements shall be constructed so as not to damage the root system of any trees
to be retained and in this regard temporary fencing shall be provided around the trees
during construction to help protect them.
26. Plans shall be submitted to the Council for approval that clearly show the type and
extent of pavements proposed, how they comply with the above conditions and also
illustrating any temporary fencing to protect the trees prior to obtaining a Development
Permit for Operational Works.
Fauna Management
27. Vegetation must only be removed or disturbed in accordance with a Fauna
Management Plan (or part thereof) prepared by a qualified person* and endorsed
through an Operational Works approval. The Fauna Management Plan must include a
plan showing all trees in developable site in relation to the approved development.
*(Refer to Advisory Note)
Bushfire Information Kit
28. A Bushfire Information Kit must be submitted for approval and endorsed through an
operational works approval. The kit must provide clear and practical instructions
regarding the bushfire management requirements of the covenant area. These
instructions are to be in plain English, logical format, provide concise direction for the
management of the covenant area in accordance with the approved Bushfire
Management Plan.
Frontage Works
29. Footpath improvements such as topsoiling, grassing, and tree planting are required to
the Serenity Close frontage of the site (if not already provided) in accordance with
Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. Grass shall be
couch, free of weeds.
30. A new 1.5 metre wide concrete path shall be constructed along the Serenity Close
frontage of the site (if not already provided) in accordance with Council’s design
standards and to an alignment that protects any significant vegetation or any
underground services.
31. All paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.
Stormwater Drainage
32. All stormwater drainage shall be collected on site and discharged so there is no net
increase in stormwater runoff from the site.
33. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
The works must be undertaken in accordance with an Operational Works approval and
must include in particular a drainage system generally in accordance with the approved
Environmental Management Plan for the Settlers Cove development.
34. On site swale drains will be required to capture and direct any overland stormwater
runoff to the Infiltration Pits proposed on site. These swales shall be sized to carry a
3-month storm event and plans detailing their capacity, location, length, width and
grades shall be submitted to Council for approval.
Page 8 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.