ORDINARY MEETING AGENDA 15 JUNE 2017
35. All site stormwater drainage shall be by means of a gravity system.
36. Plans of the entire on-site drainage design must be prepared by a Registered
Professional Civil Engineer and submitted to Council prior to obtaining a Development
Permit for Operational Works.
Electricity and Telecommunication Services
37. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
38. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
39. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
40. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
41. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
42. All earthworks and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
43. Plans and details outlining the extent of earthworks required on site and any trees to
be retained shall be submitted to Council for approval prior to obtaining a Development
Permit for Operational Works.
44. All major excavations (including the basement and driveways) shall be shored to
prevent batters extending into areas and vegetation that are to be retained. All trees
to be retained should be adequately tagged to Council’s satisfaction and enclosed with
a barrier fence to the drip line to prevent damage.
45. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on
site, determine the soil classification, establish whether any measures are required to
protect the stability of adjoining buildings and/or structures and/or land, and make
recommendations on the type of foundation system(s) best suited for the proposed
development. The recommendations of this report shall be incorporated into the design
and construction of the proposed development.
46. Earthworks shall not cause the ponding of water on any adjoining lands or the blockage
of, or interference with, any natural watercourses or overland flow path.
47. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Page 9 of 20