Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Ee 3 Public Open Space Management Plan TABLE 6 VEGETATION MANAGEMENT ACTIONS AND DESIRED OUTCOMES Actions Adoption of the Site Rehabilitation Plan and Vegetation | « Management Plan for the subject site (JWA 2007). Where necessary, reinforcement plantings and/or understorey thinning shall be undertaken in 0S2, OS3, OS4 & OS6 to restart the stalled regenerative processes and | « facilitate ecological sustainability. Any reinforcement plantings and/or understorey thinning should be completed in accordance with the Site Rehabilitation Plan (JWA 2007). The design and construction of adjacent roads, drainage and other works shall not adversely impact on existing native vegetation. e All vegetation which is to be retained within Open Space areas is to be protected during operational works. The interface between the development footprint and Open Space is to be fenced using temporary fencing (orange webbing or other suitable fencing) during operational works to reduce damage to Open Space. Vehicle access trails and fire breaks are to be managed to minimise incidents of erosion and environmental weed establishment along the entire length of tracks. All trees with a dbh of 300 mm or greater, located along the interface of Open Space and the development footprint, are to be retained where possible and where they do not present a safety hazard to proposed buildings or infrastructure. The vegetation is to be maintained in accordance with the recommended actions contained in the Fire Management Plan (JWA 2007). Desired outcomes | Adoption of the Site | Rehabilitation Plan and Vegetation Management Plan ' (JWA 2007). ' All vegetation within areas | designated for Environmental or Environmental Drainage uses are managed for conservation and water quality values. | All trees with a dbh of 300 mm or greater are retained within the interface between | Open Space and the development footprint. i 4.3.2 Fauna & Habitat The following provides information regarding the Management of Fauna and Habitat within areas designated as Open Space. TABLE 7 FAUNA HABITAT ACTIONS AND DESIRED OUTCOMES Actions . Desired outcomes ] l e Adoption of the Fauna Management Plan for the subject site; « Adoption of the Fauna (JWA 2007). Management Plan for the All significant fauna species occurring on the subject site are to be managed in accordance with the actions recommended | « within the Fauna Management Plans (JWA 2007). All habitats within Open Space should be maintained as much as practicable at or near their current state, particularly within OS2 and 0$4 designated areas. . Runoff into the existing drainage line shall be monitored to ensure the water quality is maintained at current or higher standards. Stormwater shall be managed according to the Stormwater Management Plan (BGA 2006) to minimise subject site (JWA 2007). All. significant fauna species within Open Space to be protected from significant disturbance. All habitats within Open Space are protected during and after operational works. Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.