Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
BE se Public Open Space Management Plan Actions impacts on fauna species which utilise this resource within the drainage line and wetland areas. All drainage lines within Open Space areas are to be protected from sedimentation and physical disturbance during on site works to protect micro-habitats, as outlined in the Vegetation Management Plan (JWA 2007) and Stormwater Management Plan (BGA 2006). 4.3.3 Ecological Corridors The following provides information regarding the general ecological corridors contained with Open Space. TABLE 8 Desired outcomes ECOLOGICAL CORRIDORS ACTIONS AND DESIRED OUTCOMES Desired outcomes Actions The Eenie Creek ecological corridor in the southern portion of the subject site is to be retained. In addition, corridors | « along drainage lines in Open Space areas are to be retained. Appropriate erosion and sediment control measures shall be in place in accordance with Schedule 2 of The Noosa Plan (Erosion and Sediment Control Assessment) and the Stormwater Management Plan (BGA 2006). Control measures | « shall be in place to reduce and minimise disturbance to riparian habitats and corridor values. The ecological corridors within Open Space are to be protected with minimal disturbance during operational works. Fencing and signage excluding the public from areas identified for environmental protection may be erected, if required. 4.4 Management of Threats to Open Space Values 4.4.1 introduction This section proposes management strategies to mitigate threats to the values of Open Space as outtined in SECTION 3.2 and 3.3. 4.4.2 Environmental Threats 4.4.2.1. Weeds and Environmental Rehabilitation The ecological management of corridors J through and around the Open Space are protected maintained during and after on site development. Public to be excluded from Open Space. The following provides information regarding the management of weeds and areas to be rehabilitated within Open Space. Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 12 and :
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.