Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ce Public Open Space Management Plan TABLE 14 INFORMAL ACCESS/EDGE MANAGEMENT ACTIONS & DESIRED OUTCOMES | ' Pre-development to completion of site works: The edge of the Open Space is clearly identified and the | « Actions interface between the development footprint and the Open Space is to be fenced with temporary fencing. All environmental weeds along the edge of the Open Space | e are to be removed and controlled. The edge is to be assessed bi-monthly to determine if new environmental weed species have been introduced to the disturbed area along the Open Space interface. Where practicable, no vegetation is to be pushed into or deposited along the edge of the Open Space areas. ° Public access to Eenie Creek will not be encouraged. Desired outcomes ] The edge of the public and | private Open Space is defined by temporary fencing | The edge of the public and | private Open Space is clearly identified and protected with | a 5 metre grassy buffer during | all site works — including | operational works. All unnecessary existing tracks | and trails will be closed off and rehabilitated —in | accordance with the Site | Rehabilitation Plan (JWA 2007). | Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.