Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242

of 112

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Public Open Space Management Plan

 

5 SUMMARY

James Warren & Associates have been engaged by Ken Hicks & Associates to
prepare a Public Open Space Management Plan (POSMP) for a proposed
development at Eenie Creek Road, Noosaville. The subject site is part of land
envisaged to be developed as the Noosa Shire Business Centre (NSBC).

Development within the NSBC is to be undertaken according to the Noosa Business
Centre Masterplan - Stage 2 (MP2). MP2 details areas of Open Space within the
subject site and the intents for each Open Space unit. Public access within Open
Space areas will be discouraged.

The intent of Open Space (Conservation and Waterway Protection) is for the
retention and conservation of the significant ecological values within this area. The
intent of Open Space (Environmental Drainage and Conservation) is for the
retention and conservation of the significant ecological values of this area and to
provide secondary stormwater treatment of runoff from allotments. The intent of
Open Space (Preservation of Visual Amenity) is to provide a screen and landscaping
within the developed areas of the subject site.

Proposed infrastructure requirements for these areas are covered in Section 2.2.
Section 2.3 and 2.4 discuss the role of Open Space and the values of Open Space
respectively.

Threats to the values of Open Space are discussed in Section 3, and management
programs to mitigate these threats are proposed in Section 4.4. In addition,
management in terms of general management (Section 4.2) and Environmental
Management (Section 4.3) are also proposed.

All works are to be undertaken on land to be maintained as Open Space at no cost
to Council before the commencement of the “maintenance period”. The timing of
works pre and post this period is contained within Section 4 of this report.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 17

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.