Noosa Iconic Panel                                                    Decision Notice - Development Permit
                                                                    Material change of use - detached house
                                                                               6 Allambi Rise, Noosa Heads
                                                                                             28 August 2009

18.    All stormwater drainage (including roof water overflow from the rainwater storage system) shall
       be collected and discharged so there is no net increase in stormwater runoff from the site.
       Stormwater drainage permitted to drain from the site shall be as follows:
19.    Drainage of the driveway and basement area shall be undertaken generally in accordance with
       Drawing no. 781-02 issue C by Spice Consulting dated 1 July 2009. Building Works Approval
       must not be granted unless the final drainage design is accompanied by certification by a
       Registered Professional Civil Engineer that the drainage will not cause ponding to
       neighbouring properties and will not affect the foundations of the subject building.
20.   All balance drainage (i.e drainage from areas other than the driveway and basement area)
      shall drain to Council's kerb & channel street drainage system in Allambi Rise. Plans of the
      drainage design shall be prepared by a Registered Professional Civil Engineer and submitted
      prior to obtaining a Building Works Approval. The maximum discharge of stormwater drainage
      allowable to Council's kerb & channel street drainage system at any one location is 25 litres
      /second.
21.   All site stormwater drainage shall be by means of a gravity system.
Earthworks
22.   Earthworks required on site shall be carried out in accordance with Council's Planning Scheme
      Policy PSP5 Engineering Design Standards, so as not to cause the additional ponding of water
      on any adjoining lands or concentrate or direct overland flow on to an adjoining property.
23.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. In this regard a condition survey of all
      buildings or structures that border the site must be undertaken prior to commencement of
      excavation works.
Site Stability
24.   A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
      determine the soil classification, establish whether any measures are required to protect the
      stability of adjoining buildings and/or structures and/or land, and make recommendations on
      the excavation methodology best suited for the proposed development. The recommendations
      of this report shall be incorporated into the design and construction of the proposed
      development.
Erosion and Sediment Control
25.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary during construction.
      In this regard, plans detailing the methods of controlling erosion and sediment in accordance
      with the Healthy Waterways document and fact sheet series titled "Controlling Stormwater
      Pollution on your Building Site dated 2006" are required to be submitted with the application for
      a Building Works Permit.
Engineering - General
26.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council's standards and at no cost to Council.
27.   Any alteration of any public utility or other facilities necessitated by the development of the land
      or associated construction works external to the site shall be at no cost to Council
28.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.




                                                                                         Page 4 of 7

Used in these records

About this file

File size
4.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Change to an Existing Approval-132009.325.01.pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.