Change to an Existing Approval-132009.325.01
Noosa Iconic Panel Decision Notice - Development Permit
Material change of use - detached house
6 Allambi Rise, Noosa Heads
28 August 2009
4 CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and as
may be amended by these conditions.
Plan No. Rev. Plan Name - Prepared by Date
1 of 9 E Site Plan & Perspective Views - MRA Design 1July 2009
2 of 9 E Floor Plans - MRA Design 1July 2009
6 of 9 E Elevations & Roof Framing- MRA Design 1July 2009
7 of 9 E Sections A-A, B-B & C-C - MRA Design 1July 2009
8 of 9 E Sections D-D, E-E, G-G & F-F - MRA Design 1July 2009
Roof Overhang Diagram - MRA Design
Pool fence plan & Elevation- MRA Design
and as may be amended by these conditions.
Security Bond
2. Security in the form of a cash bond or trading bank guarantee to the sum of $3,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the issue
of a Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
General
3. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
4. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
5. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) shall
not be constructed under overhead electricity transmission lines, or within any easements.
6. External colours and finishes of the building shall comprise of muted/environmental tones that
blend with the natural environment.
Relevant Period
7. The Development Permit for a material change of use lapses if the use has not happened by
28 August 2013, unless an application to extend the currency is approved by Council.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to an Existing Approval-132009.325.01Related documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.