A review of the group fitness program was undertaken, and subsequent changes made,
including adding two new classes at popular time. Changes have been well received and
attended by patrons.
NLC, Noosa Community Support and the Community Development team continue to
collaborate for the Ageing Well Noosa Program. With now four dedicated low cost, gentle-
exercise classes for the over 65’s at Noosa Leisure Centre, classes are well attended by
the public and plans are underway to collaborate further on additional offerings for this
program at NLC.
Wayfinding signage for the Wallace Park precinct was added to the pathway between the
NLC and Noosaville Library to assist the community in finding relevant sites within the
precinct.
An upgrade of the front garden beds at the entrance and exit of the facility, where
replanting and mulching has occurred to improve the aesthetic of the facility.
6. FUTURE DIRECTION
As part of the staffing and structural review, undertake the planning and development of
a LAWA for the NLC.
Continue to work with key user groups, our sport and recreation team along with the
community on rebuilding the centre’s customer and revenue base.
Continue to monitor and review attendance numbers for NLC programs to ensure
programs continue to represent a viable ongoing offering.
Complete condition assessment work for the facility, to highlight the current state of the
buildings overall state. This information will help feed into more strategic thinking around
the long-term development of the centre.
Undertake the Needs Assessment and Options Analysis on the future of the NLC with a
view to present findings to council for consideration.
Continued enhancements to the centre’s aesthetics, inclusive of exploring capital works
upgrades to outdoor café roof, painting of exterior and interior areas, group fitness flooring
upgrades, safety railing improvements in current grandstand area and review of
emergency exit doors.
Upgrade of current Links centre management software to allow for enhanced online
offerings, as well as a more reliable in-house experience for staff.
A review of the current usage arrangements with long-term hirers, and continuation of the
provision of rock-climbing wall within the centre.
Previous Council Consideration
Nil
Finance
Refer to Section 1 of this report.
Risks & Opportunities
The Community facilities branch and the NLC also are facing some challenges and the need for
change in the future, these being brought about by the following:
1. The over reliance on the use of casual positions to undertake core duties and roles within
the facility is a significant potential risk. The planned restructuring of the staffing profile
will position the facility to better manage its daily and future operations.
2. Utilization of the facility has reached it capacity in the ‘peak’ hours of operation, this will
provide challenges in being able to support further growth of sport and active recreation
offerings at the facility.
3. Aging infrastructure, both in the facility and within the carpark and greater precinct will
require future investment to keep it fit for purpose and compliant into the future
Page 65 of 75
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.