If any soil conditions encountered during construction are found to differ from those discussed in this
report, ASI and Tectonic should be notified immediately, and an inspection carried out to determine if
changes to footing design are required.
4.4 Retaining Structures
Retaining structures must be founded as per the recommendations in Section 4.3 above. Retaining
structures greater than 1 m high, or those required to support surcharge loads or sloping backfill, will
require engineer design and certification of construction. Retaining wall design should be carried out in
accordance with AS4678-2002 Earth retaining structures.
The parameters outlined in Table 3 may be adopted for retaining wall design. The values in Table 3
assume that the walls are fully drained, and no allowance is included for hydrostatic pressures,
construction loading, up-slope footing loadings, the effects of sloping ground and backfill compaction
stresses. Any temporary shoring required to support excavations during construction may also be
designed using the parameters in Table 3.
Table 3: Retaining Structure Design Parameters
Lateral earth pressure coefficients
Unit weight Friction angle Ø Ka Ko Kp
Retained material
(kN/m3) (°) (Cantilever wall) (Non-yielding
wall)
Loose Sands 17 28 0.36 0.53 2.77
Medium Dense (or 18 33 0.29 0.46 3.39
Denser) Sands
Future Fill * * * * *
Note: * depends on fill material type and level of compaction
At a minimum, retaining structures must be founded as per the recommendations in Section 4.3 above
with the footings also designed to account for lateral loads imposed by the retaining wall. Detailed
design must include an assessment of internal and global stability, together with required bearing
capacity and founding depth, by the retaining wall design engineer.
4.5 Drainage
Given the sandy nature of the site, rainfall is generally expected to rapidly infiltrate any unsealed surfaces.
If necessary, diversion drainage should be constructed to divert seepage and/or runoff away from the
building area to prevent saturation and erosion.
Permanent site drainage must be installed to ensure that stormwater runoff is directed away from
proposed building walls, footings and retaining walls (e.g. positive gradients and/or channel drains).
Future building and landscaping must be carried out to maintain good drainage.
Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in
filter ‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and
site-specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to
be accounted for in the design of the retaining structure.
20 November 2025
25364-001-Rev0 11 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - Slope Stability Assessment - 51091.3953.02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.