4.        RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.

4.1       Site Layout and Development Limitations
Should any revisions be made to the proposed extent of the development, as described in Section 1.1,
Tectonic must review these revisions prior to construction to assess if there are any impacts on slope
stability.
To achieve a Low Risk of instability, the following is recommended:
     The proposed development should not exert additional load on the existing structures or footing
      system, unless assessed and approved by a structural RPEQ, who must also confirm the existing
      footings and structural members have sufficient capacity to carry any additional loads imposed by
      the extensions.
     All footings must found below the zone of influence of the existing structures (including retaining
      walls).
     Design and construction of footings shall be undertaken in accordance with Section 4.3.
     All retaining walls exceeding 1 m high and/or subject to surcharge loads must be engineer designed
      and certified by an RPEQ. The design must include an assessment of global and internal stability.
     Formal drainage should be constructed to ensure all stormwater is directed away from the existing
      and proposed structures.

4.2       Earthworks
It is anticipated that substantial earthworks will not be required for the construction of the extensions.
Localised excavations may be required for footings and service trenches. Additional fill must not be
placed on the site during construction unless assessed and approved by Tectonic prior to
commencement.
Any organic rich topsoil must be stripped from construction areas.
Excavations in the soils encountered in the ASI borehole should be achievable using conventional
earthmoving equipment (e.g. excavators with toothed buckets or augers).
Any excavations required adjacent to existing structures will need to be specifically designed to ensure
that the structures are not undermined. This may necessitate the use of shoring and/or underpinning,
which must be designed and certified by a structural RPEQ.
The above recommendations do not supersede any existing safety regulations or legislation applicable to
excavations (e.g. limits on personnel entry into trenches).

4.3       Footing Design
A suitably qualified and experienced structural RPEQ must be consulted to ensure the existing footings
and structural elements of the residence have sufficient capacity to support any additional loads imposed
by the proposed extensions. It is recommended that footing exposures and/or building records searches
be undertaken prior to construction. Alternatively, the proposed extensions could be designed to be
structurally isolated from the existing structures.




20 November 2025
25364-001-Rev0                                                                                       9 of 12

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - Slope Stability Assessment - 51091.3953.02 (As Published).pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.