Noosa Shire Council
 2019/20 Capital Budget Review 1 - Capital Submissions                                                                        ATTACHMENT 2
 For the period ending 30 June
  Project Description                                    2019/20   Carryovers      Emergent     Proposed Details
                                                         Original                      Naat     BR1 Total
                                                          Budget                                   Budget

 Orealla Crescent Overpass Refurbishment               1,765,000 -     10,485                              Council successful for increased grant. Scope of work
                                                                                                          being finalised for construction to commence late
                                                                                                          2019/20. Overspend in 2018/19 adjusted as a
                                                                                                           -alryOvel
 Tewantin Doonella Bridge Renewal                      282,000         11,047,     ~==—|_—s 293,047 | Bridge design work ongoing in 2019/20
 Cooran Tablelands Road Bridge Renewal                  100,000                                   900,000
   eee                  remem                      [mee
 Rehabilitation
 Kin Kin Wahpunga Lane Bridge Renewal                  2000007                             ~*~                                            —~—CS
 Bridges Total                                         2,501,000         5600                    500564

 Peregian Beach Boardwalk Renewal North of Tower to     415,000 -       4,069                              Planning and design complete in 2018/19, with
 access                                                                                                   construction to occur in 2019/20. Overspend in
                                                                                                           2018/19 adjusted as a carryover.
 Renewal of revetment wall at O-Boats Gympie Tce   |                   17,707 fF                   17,707  Works delayed in 2018/19 to address site issues.
                                                                                                          Construction to progress in 2019/20.
 Beach Access Shower Renewal Claude Batten Drive                        er                       ee Construction of beach showers delayed with works to
                                                                                                          commence in early 2019/20.
 Coastal Canals and Waterways Total                    415,000 _       iT

 Cooroy Cemetery Plant & Equipment Shed                  60000                                      000
Cemeteries Total                                         60,0000                                  80000

 Rufous Street Stage 3                                 3,420,000 -     47,254                   3,372,746  Planning and design finalised with construction to
                                                                                                          commence in 2019/20. Overspend in 2018/19 adjusted
                                                                                                          as aca    over.
 Commercial Land & Property Total                  3,420,000 -        47,254                    887286

 Sunshine Beach NAC - Renewal Program              — 700000,                                      00000
 Noosaville Wallace House Restumping                     85,0000                               8000
 NAC & NLC Roof Restoration (to Support Solar                                                     228,650  Construction underway with works to be finalised in
Panels)                                                                                                   early 2019/20. Overspend in 2018/19 adjusted as a
                                                                                                          carryover.
 Peregian Beach Surf Club Roof Replacement                                                                 Project delayed to 2019/20 in allow for finalisation of
                                                                                                          site use Expression of Interest in 2018/19.
 Community Facilities Minor Works Brought Forward                     166,418        18,000       184,418  $155k Budget adjustment in BR3 incorrect and did
                                                                                                          not accomdate full proposed cost of replacement PA
                                                                                                          (CWE 7/3/2019)
                                                                                                          $18k additional costs associated with AV system
                                                                                                             (\    [7/2019
 Community Facilities Total                           1,017,500      326,980        18,000,    1,362,480 0

 Tewantin Administration Building Roof                                 81,775                              Roof replacement complete, with subsidiary work on
                                                                                                          air condenser to be finalised in early 2019/20
 Tewantin Admin Building - Security Upgrade                            74,977                      86,606  Construction underway with works to be finalised in
                                                                                                          2019/20. Additional costs identified as part of the
                                                                                                          successful quotation.
 Corporate Buildings Total                                           156,751        19,629       168,380

 Whole of Shire Gravel Resheeting -Annual Program |     410,000)              |                   4000000
 Gravel Road Network Total                              4100000                                   90,000

 Noosa North Shore Campground Redevelopment            2,410,000 | eet                    |           TT Tender awarded in June 2019 with construction works
                                                                                                          underway in early 2019/20.
 Noosaville, Noosa River Holiday Park Large Amenities Pll]                                                 Construction complete, with final invoices to be paid
 Refurbishment                                                                                            early 2019/20.
 Holiday Parks Total                                   2,410,000      51546                      MONS

 Noosaville Library Refurbishment                            3  ,                                          Construction complete, with final invoices to be paid
                                                                                                          early 2019/20.

                                                                                                                                 Page 45 of 68
Log in to download the original file

2019-08-12 General Committee Agenda(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.