Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-08-12 General Committee Agenda

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 46 of 68

Project Description                             2019/20 Carryovers   Emergent    Proposed Details
                                                   Original                  Items   BR1 Total
                                                    Budget                             Budget
   Cooroy Butter Factory Louvre Replacement       1,000)                                 000
   Libraries & Galleries Total =               SSi15,000,-S    90,000;                5000                                       s—~S
    Noosa Hinterland Priority Playground           300,000      21,527                321,527 | Planning and design work ongoing to be progressed
                                                                                              in 2019/20 with sucessful grant application
    Botanic Garden Shade House                     380,000 -    12,398                367,602 Works underway with works to be finalised in early
                                                                                              2019/20. Overspend in 2018/19 adjusted as a
                                                                                              carryover.
   Noosaville, Gympie Terrace Park Furniture Renewals | 150,000)                      150000
   Cooran Pioneer Park Upgrade                5000000
cpr             onsnectisoeremies                 (ee)                                Ba     ainotinsiobiscnasnsom
    Design
    a
    Renewal
   Lake Macdonald Botanic Garden Signage Renewal   25.608                                 0B
   Noosa Heads Alex Dan Park Playground Renewal    67.427)                              AR
  seer              eens ere              |
    Renewal
   ‘Shire BBQ Renewal Program FY19/20 075000)                                            000
   Shire Park Furniture Renewal ProgramFY19/20 |   50000,      )s~<“‘*~*~sésWOO                                         S—~—SSCSCS
   Shire Park Shelter Renewal ProgramFY19/20 | —45000, Ss) sS~=“‘*é‘“*ésSWOOS—~—SSSC‘S
   Parks &Playgrounds Total =                     1,275,365,  28,08                 1,208,988
   Teena                Sor Sra                                                             enorme
                                                                                              August 2019.
    Wallace Park Pathway Stage 5 & 6                            14,609                 14,609 Construction near complete, with an additional
                                                                                              section to be undertaken with remaining funds in
                                                                                              2019/20 to complete the works
   Shire Pathway Renewal Program FY19/20     |    100,000                             100,000
 Spring rezone toner                        | emf                                    ren
    Upgrades
   Pathways &Boardwalks Total =s=Ss74000,-                     32,683;                0868S                                   s—CSSCS
   Pena SofSenioeromies                         rea)                                                   nee
                                                                                              underway in early 2019/20.
   Public Amenities Total                         877000017215                         84
    Program  aa dd
   Public Transport Infrastructure Total =        500,000,                   =       8000000                              —CSsC
  Whole of Shire Reseal & Rehabilitation Program | 3.600.000,     - |              8600000,
    al llc
    Reconstruction
     aces eerste                              SS ee
    and Reef Street                                                                           2019/20.
  Rina) vemmeCwenResmapen                     m
    FY19/20
   Tewah StGravelRoad Seal —SS—=«dS=Ci‘éi OOOO                                 SCdC“(‘é zz           FFFFFFFFOO™~™OCS
   Heotor Street Road Widening and Kerb & Channel | 97.000,                    ssC(‘é mz‘    |FFFFFOC~S
   Pomona, Ambulance Street Sealing of Gravel Section | 200.000, |             —s—<“C*é‘ WOOO                               s—SSCSsS
    tne
   Sealed Roads Network Total                    5,537,000     54,7470               584A
   Renewal of various stormwater structures  |    150,000)                            50,0000
    eg ee
                                                                                              due early 2019/20.
    Gympie Terrace Stormwater                     1,200,000 -   15,169               1,184,831 | Scope of work being finalised for construction to
                                                                                              commence late 2019/20. Overspend in 2018/19
                                                                                              adjusted as a carryover.
 eee                                                                                           ton           me mninacenen nee
                                                                                              2019/20.
   Shire Bioretention Basin Renewals ProgramFY1920 | 60000,                 s—~<“<~*~sé~‘—S*~s~s—ésWOOD                     S—~—SS
   Scemageae           eons
    Easement Upgrade
   Stormwater Drainage Total                      1,680,000    19,8381        |       99881
   ‘Streetscapes and Road Corridors

                                                                                                                 Page 46 of 68
Log in to download the original file

2019-08-12 General Committee Agenda(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.