2019-08-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 46 of 68
Project Description 2019/20 Carryovers Emergent Proposed Details
Original Items BR1 Total
Budget Budget
Cooroy Butter Factory Louvre Replacement 1,000) 000
Libraries & Galleries Total = SSi15,000,-S 90,000; 5000 s—~S
Noosa Hinterland Priority Playground 300,000 21,527 321,527 | Planning and design work ongoing to be progressed
in 2019/20 with sucessful grant application
Botanic Garden Shade House 380,000 - 12,398 367,602 Works underway with works to be finalised in early
2019/20. Overspend in 2018/19 adjusted as a
carryover.
Noosaville, Gympie Terrace Park Furniture Renewals | 150,000) 150000
Cooran Pioneer Park Upgrade 5000000
cpr onsnectisoeremies (ee) Ba ainotinsiobiscnasnsom
Design
a
Renewal
Lake Macdonald Botanic Garden Signage Renewal 25.608 0B
Noosa Heads Alex Dan Park Playground Renewal 67.427) AR
seer eens ere |
Renewal
‘Shire BBQ Renewal Program FY19/20 075000) 000
Shire Park Furniture Renewal ProgramFY19/20 | 50000, )s~<“‘*~*~sésWOO S—~—SSCSCS
Shire Park Shelter Renewal ProgramFY19/20 | —45000, Ss) sS~=“‘*é‘“*ésSWOOS—~—SSSC‘S
Parks &Playgrounds Total = 1,275,365, 28,08 1,208,988
Teena Sor Sra enorme
August 2019.
Wallace Park Pathway Stage 5 & 6 14,609 14,609 Construction near complete, with an additional
section to be undertaken with remaining funds in
2019/20 to complete the works
Shire Pathway Renewal Program FY19/20 | 100,000 100,000
Spring rezone toner | emf ren
Upgrades
Pathways &Boardwalks Total =s=Ss74000,- 32,683; 0868S s—CSSCS
Pena SofSenioeromies rea) nee
underway in early 2019/20.
Public Amenities Total 877000017215 84
Program aa dd
Public Transport Infrastructure Total = 500,000, = 8000000 —CSsC
Whole of Shire Reseal & Rehabilitation Program | 3.600.000, - | 8600000,
al llc
Reconstruction
aces eerste SS ee
and Reef Street 2019/20.
Rina) vemmeCwenResmapen m
FY19/20
Tewah StGravelRoad Seal —SS—=«dS=Ci‘éi OOOO SCdC“(‘é zz FFFFFFFFOO™~™OCS
Heotor Street Road Widening and Kerb & Channel | 97.000, ssC(‘é mz‘ |FFFFFOC~S
Pomona, Ambulance Street Sealing of Gravel Section | 200.000, | —s—<“C*é‘ WOOO s—SSCSsS
tne
Sealed Roads Network Total 5,537,000 54,7470 584A
Renewal of various stormwater structures | 150,000) 50,0000
eg ee
due early 2019/20.
Gympie Terrace Stormwater 1,200,000 - 15,169 1,184,831 | Scope of work being finalised for construction to
commence late 2019/20. Overspend in 2018/19
adjusted as a carryover.
eee ton me mninacenen nee
2019/20.
Shire Bioretention Basin Renewals ProgramFY1920 | 60000, s—~<“<~*~sé~‘—S*~s~s—ésWOOD S—~—SS
Scemageae eons
Easement Upgrade
Stormwater Drainage Total 1,680,000 19,8381 | 99881
‘Streetscapes and Road Corridors
Page 46 of 68See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.