2019-08-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 47 of 68
Project Description 2019/20 Carryovers Emergent Proposed Details
Original ay BR1 Total
Budget Budget
Sag ememnmaremeases | [ee] ae een
Renewal to commence.
Streetscapes and Road Corridors Total = 14156 AI
Nemes renesronmesoetoree [Sra] saa) 68 rnainemeec
Beckman's Road to separate project
SSS wan | icettnninemeetoe
Beckman's Road to separate project
Castaways Beach, David Low Way Safety and Corridor - 150,067 192,062 Additional construction costs incurred to finalise
Improvement surfacing works on David Low Way. Overspend in
isa cl ed i a
2018/19 adjusted as a carryover.
ag eee Reg
Drainage August 2019.
Noosaville Gympie Terrace Corridor Renewal Stage 2 764,000) 4000
‘Noosa Heads Leslie Drive Koala Pole Renewals | 14,000) 14000
Smears ees cre se ee
&CNLG Grant
Transport and Infrastructure Management Total _——3,578,000 - 3,647 192,062, 3,766,415
caiees mr sceemes | some] eee] | SR Snr arn
Investigation
CaueaonRoom | 0 atom cente
Education Room education centre.
Noosa Heads "The Woods" Bin Storage Enclosure 100,000, C~=<‘éOWOO et s—SS
Seer aos sre |
Gravel Road
Waste Management Total = 55,000 8,020 45,000 5080200
a
Reseal Program A
Whole of Shire, CCTV Drainage Program 800,000 —(“‘C;CC‘COOWOOO s—SSCS
cece Roeeinnesin[Sae | Sa| g S
2019/20
Shire Bridge Annual Level 3 inspections ———SSs110,000,—si—‘“‘“~*s*S*S*é~sNODS s—SSCS
Asset Management Systems Implementation | ——-250,000, SS Si80OD
la dl re aa
Forecasting System disaster resiliance in the shire
Asset Management Total 1,990,000 379,072 95,000 1864072
Penteerenreoen | ane eee ae
awaiting delivery in 2019/20
Fleet-Plant Replacement Total = 1,484,040 33293000 1,816,970
ad
TechnologyOne scope works underway
Information Technology Total == 800,000 1068717, HTT
Noosa River HydraulicModel =| | 84.910, |—__84,910 | Project ongoing with finaliation forecast in 2019/20
Whole of Shire, Climate Change Adaptation Strategy 50,000 202,305, ~——=—=—=—=—=«=S=~=«52,305 Project ongoing with finaliation forecast in 2019/20
Seng nenermirien [aon ie Se patina ain sn
Planning Scheme
Shire Project Team Materials & Services| ~SS«A6,952——————=«=~=—~=—«6,952._ Project ongoing with finaliation forecast in 2019/20
Shire Planning Scheme Consultancy SS SS«86,142——————=«—=—~—«186,442 | Project ongoing with finaliation forecast in 2019/20
Some renee [erat [eseeervenaiie eran em
Assessment
Fr een
Pilot
Planning Scheme Total = S000 88GB AS
Page 47 of 68See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.