Original source · versioned page text
2022-08-15 General Committee Meeting Agenda
The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 AUGUST 2022
Front setback
The planning scheme seeks a 6.0 metre setback to the internal loop road. The following image
details where the development intrudes into the front setback. This is primarily located at the south
western corner of the site where the road and site frontage both curve. An arbour is also located
at the front boundary with a 0m setback. The 6.0metre setback is highlighted in yellow in the
following image:
Figure 14: Setback area (yellow) demonstrating extent of setback intrusion
The variations to the 6.0 metre setback are generally minor with the most significant intrusion at
the south-western corner of the site, where a setback of 5.4 metres is proposed to the building
façade and 2.9 metres to the balcony which borders the building. It is noted that maximum height
of the building is at this location. The following image identifies where the building intrudes into the
6.0 metre setback at the south-western corner of the site.
Page 22 of 122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.