Tewantin ReGen Wellbeing and Community Hub Feasability 89,163 Feasibility study currently underway.
Community Facility Maintenance and Renewal SEQCSP (107,311) 569,000 Multi-year Project. SSend ahead of schedule in 2021/22, with v
for continued allocation of grant funds for 2022/23
Noosa Heads Surfboard Lockers/Shelters Feasibility 30,000
Noosa Leisure Centre Needs Assessment 150,000
Noosa Leisure Centre Stadium Floor Refurbishment 50,000
Noosa World Surfing Signage 20,645
The J Audio Visual Equipment 5 Yr Renewal Program 50,000
Sunshine Beach NAC AMP Renewal Program 182,000
Noosa Leisure Centre Bathroom & CCTV Upgrade QRA 695,000 Successful Black Summer Bushfire grant application received for works
Total Community Facilities 1,967,553 989,724 1,264,000 0
Tewantin Administration Building - Masterplan 65,000
Noosa Shire Building CCTV Program 300,000
Depot Building Renewal 100,000
Council Building Upgrades SEQCSP 126,000 (15,790) 57,000 Multi-year Project. Soend ahead of schedule in 2021/22, with v
or continued allocation of gran ndsfo 0
Total Corporate Buildings 591,000 (15,790) 57,000 0
Noosa Heads Maze Carpark Works Inc Lighting SEQCSP (50,368) 155,000 Multi-year Project. Soend ahead of schedule in 2021/22, with v
for continued allocation of grant funds for 2022/23
Stan Topper Park - Carpark and Entrance Reseal 65,000
Total Car Parks 65,000 (50,368) 155,000 0
Trails Master Plan and Implementation Plan QRA 31,494 Masterplan review currently underway
Trail 5 Upgrade QRA 1,100,000 278,633 Multi-year project. Procurement tender phase underway. Wor
dertaken i 0
Total Environmental Assets, Bushland, Tracks and Trails 1,100,000 310,127 0 0
Shire Gravel Resheeting Annual 450,000 221,926 Disaster events and prolonged wet weather season delayed
esheeting. To be delivered in Q
Total Gravel Road Network 450,000 221,926 0 0
Boreen Point Campground Storage Shed Replacement (1,155) 33,000 Emergent worksfor replacement of campground storage she
following recent disaster events
Boreen Point Campground - New Boom Gate 38,500
Boreen Point Campground - Office and Reception Space 92,000
Noosa North Shore Campground Landscaping Bays 6,050
Noosa North Shore Campground - Waste Bin Storage Area 10,925
Page 43 of 122See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.