2022-08-15 General Committee Meeting Agenda

of 122

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                       15 AUGUST 2022


      Performance Bond
16.   Security in the form of a cash bond or trading bank guarantee to the sum of $25,000 must
      be submitted to Council, to secure performance of all conditions of this approval, prior to pre-
      start meeting. The cash bond or trading bank guarantee will be returned on performance of
      the conditions of approval less any costs incurred by Council in respect of enforcing
      performance of this permit. Council reserves the right to call upon the bond or guaranteed
      sum to effect compliance with conditions.
      Street Identification
17.   The street address of the development must be clearly visible and discernible from the
      primary frontage of the site by the provision of a street number and, where appropriate, the
      building name.
      Water & Sewer Connections
18.   An underground connection to reticulated water and sewerage must be provided to the
      development site in accordance with the standards and requirements of Northern SEQ
      Distributor–Retailer Authority (Unitywater).
19.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
      must be submitted to Council that certifies an underground connection to reticulated water
      and sewerage has been provided to the development site.
      Public Safety
20.   All ground floor shopfront glazing must be protected against vandalism by the use of a form
      of safety glass such as toughened or laminated glass.
21.   During operating hours, all parking areas, pedestrian areas and entrances/exits to all
      stairwells, lifts, foyers and public toilets must be well lit with vandal resistant lighting and with
      intensities to satisfy the requirements of Australian Standard AS1158 “Public Lighting Code”.
      Lighting must be designed to reduce the contrast between shadows and well lit areas. In
      particular, appropriate security lighting must be provided in the location of the bicycle/ scooter
      parking and bin storage area.
22.   After hours access to loading docks, storage areas and the basement carpark (including the
      vehicle ramp and all stairwells) must be restricted by a security gate, lockable doors and/or
      other suitably appropriate means. The basement carpark must be kept closed and locked at
      all times while the use is not operating.
      Community Management Statement
23.   Any proposed Community Management Statement required for the development pursuant to
      the Body Corporate and Community Management Act 1997 must be submitted to Council for
      endorsement at the same time as submission of the Building Format Plan (or similar) to
      Council for compliance assessment.
24.   All clauses and by-laws of the proposed Community Management Statement must accord
      with the requirements of this Decision Notice.
      Landscaping
25.   The site must be landscaped generally in accordance with an Operational Works permit.
26.   Any landscaping in the road reserve must be in accordance with an Operational Works
      approval.
27.   The development site must be landscaped. The works must be undertaken in accordance
      with an Operational Works approval and the Noosa Plan for that specific area and Planning
      Scheme Policy (PSP2) - Landscaping and must include in particular:
      a.    the works shown on the Approved Plans;
      b.    the feature trees (Angophora costata) must have a minimum pot size of 100 litres;

                                                                                           Page 7 of 122
Log in to download the original file

2022-08-15 General Committee Meeting Agenda(PDF, 20MB).pdf · 21.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.