Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2022-08-15 General Committee Meeting Agenda

of 122

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                  15 AUGUST 2022


      c.   protection of vegetation within the 10-metre wide Environmental and Conservation
           Zone;
      d.   vegetation installed for landscaping adjacent to the 10-metre-wide vegetation strip
           protected by the Environmental and Conservation Zone must only include Noosa native
           species and not include any of the undesirable species as detailed within the Noosa
           Plan 2020 - Scheme Policy 3 Landscaping;
      e.   vegetated screening of any electrical transformers, bin storage areas and the like from
           the road frontage;
      f.   control of all weed species listed in the following standards and legislation:
           i.    declared plants under the Land Protection (Biodiversity Act 2014 and sub-
                 ordinate Regulation 2016).
           ii.   Noosa Local Government Area Pest Management Plan 2015-2019.
28.   All entry statements, fences, batters, retaining walls and buffer/screen plantings must be
      located entirely within private land and not within the public road reserve.
29.   All landscape works must be established and maintained in accordance with the approved
      design for the life of the development, and in a manner that ensures healthy, sustained and
      vigorous plant growth. All plant material must be allowed to grow to full form and be
      refurbished when its life expectancy is reached.
30.   All landscape works must be maintained generally in accordance with the approved design
      for the life of the development.
      Retention of Existing Vegetation
31.   A Tree Management Plan in accordance with AS4970-2009 detailing vegetation in the
      covenant to the north of the site (Cov. I SP182845). The TMP will demonstrate the Tree
      Protection Zones and Structural Root Zones of vegetation in the covenant are protected, to
      ensure the health and longevity of vegetation in the covenant. If impacts are proposed, offset
      planting may be required for any impacted vegetation.
32.   The report must be resubmitted to Council incorporating the above amendments prior to the
      issue of any Development Permit for Operational Works.
33.   Prior to the prestart meeting, a bank guarantee or a bond of $30,000 must be lodged as
      security for the protection of the tree/s identified for retention in the conditions of this
      approval. The bond:
      a.   may be drawn upon by Council in its entirety if any one tree identified for retention is
           damaged to the point where the tree cannot be saved (as confirmed by the project
           arborist and agreed in writing by Council)
      b.   will be returned upon practical completion of all the operational works relating to this
           development.
34.   The tree/s identified for retention in the conditions of this approval must be maintained in
      good health for the life of the tree.
      Environment
35.   Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
      not be released from the site or to waters within the site, or be likely to be released should
      rainfall occur, unless all reasonable and practicable measures are taken to prevent or
      minimise the release and concentration of contamination.
36.   Erosion and sediment control measures must be installed and maintained to minimise
      erosion on the site and to minimise the export of sediment and associated pollutants from
      the site. The erosion and sediment control measures must be designed, installed and
      maintained in accordance with current best practice standards

                                                                                     Page 8 of 122
Log in to download the original file

2022-08-15 General Committee Meeting Agenda(PDF, 20MB).pdf · 21.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.