Original source · versioned page text
2022-08-15 General Committee Meeting Agenda
The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 AUGUST 2022
(*Refer to Advisory Notes).
37. Limit soil exposure on the site to a distance of no more than 2m beyond the extent of
earthworks shown on the approved plans except where the exposed soil is effectively
stabilised without delay and prior to rainfall occurring.
ENGINEERING/TRAFFIC
External Works
38. Hoffman Drive and the internal service road must be upgraded for the length of its frontage
to the subject site. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. Rectification of any damage to existing kerb and channelling; and
b. Construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice.
Site Access and Driveways
39. A sealed access driveway must be provided from the internal service road to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawing RS-051 and
respective addendum; and
b. suitable safety measures, including warning signage, to improve driver awareness of
pedestrians and enhance pedestrian safety. Warning signage must be provided near
the exit ramp from the underground parking area to warn motorists of pedestrian
movement along the frontage street.
Car Parking
40. Provision of amended plans incorporating the tandem carparking arrangement, together with
the SRV and ambulance bay shown on plans SK01, SK02 and SK03 prepared by SLR and
dated 13/07/22, (with the wheel stop deleted from the ambulance bay and the ground level
carparking plan modified for compatibility with the provision of that modified service vehicle
arrangement).
41. The parking layout is to be in accordance with the requirements of AS/NZS 2890.1-2004
42. Provision of vandal resistant public lighting with intensities to satisfy the requirements of
Australian Standard AS1158: Public Lighting Code;
43. Provision of 109 parking spaces on the site, plus the SRV loading bay and ambulance bay.
44. Implementation of signs and line marking as shown on Figure 3 of the SLR advice dated 20
May 2022.
45. Each tandem parking space arrangement (i.e. 2 spaces) is to be allocated to a single tenant.
46. Signage is to be installed and maintained at all times identifying the allocation of the tandem
spaces. The use of the tandem spaces is to be by staff only.
47. A management plan is to be prepared documenting in detail options for how use and
operation of the tandem parking spaces is to be managed by individual tenants to ensure
that both spaces of each tandem space are effectively utilised.
48. That management plan is prepared to the satisfaction of Council, and prior to the
commencement of use on the site is to be incorporated into the requirements and procedures
of the body corporate.
49. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Page 9 of 122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.