Original source · versioned page text
Traffic Report - responses 11 to 16
vegetation
ack
8 ree setb
t
zone vegetation
7 9
8
t
6 ifican
sign es
tre
existing dam
10
pr
ot
ec
te
d
ve
ge
ta expansion of productive
tio
n permaculture area as +12.610
required
vegetation 11 vegetation existing dam
VILLAGE 1
12 vegetation
8
3
zone ck
9 +14.500
etba
g.o.p
trees nt
tree s
14 spaces
fica
+12.780
5
signi
13
pr
op
+14.800 os
ed
9 Hole Golf +16.000 ex
Course retained t
ru end
n ed
ca
19 no
e
+14.000
+19.200 8
Padmount
14
Transformer
RW
15
Communal
16
19 Area VILLAGE 2 9
+15.280
4 +16.700 seale 10
17
d ro
follow adway - fu
16
15
s exis ll
ting g extent 11
ed
18
17
rade
g
ain
rk ting
din
12
ret
loa
14
car exis
e
g.o.p 13 pe xisti
14 spaces div rmac ng pr
pa
"st
14 apl ersifie ulture oduct proposed
es" d iv
- re by a orcha e activity field at
fer ddin rds
15 Re Per g s ~RL 9.000
por ma ite
t cul
tur
roo
e fed
nursery (relocate exp
an kitc ame
existing chicken perm sion of hen nitie
coop structure) 16 acu p
ltu roduc ette s/
requ re area tive
expansion of productive ired as
1 permaculture area as
required 17
chicken
system vege
2
Fire Storage
ame sting
s
Tanks compost
ntitie
system
o
comp
productive
permaculture -
market garden
- refer Permaculture vegetation
vegetation Report for details
vegetation
ne
d zo
g.o.p significant
10 spaces tree
azar
fire h
one
bush
ffer z
vegetation tree setback
existing raised island +16.000 16 proposed
existing shrub in centre of activity field zone
to be flattened so
d bu
roadway to be removed and at ~RL 16.000
buses can drive over existing internal area to be asphalted to
roadways retained
azar
match surrounding roadway
and allow bus maneuvering
fire h
VILLAGE 3 15
bush
Existing
Maintenance
Sheds 14
13
existing maintenace
sheds retained productive
permaculture -
orchards & staples
existing orchards diversified by
adding site "staples" - refer
Permaculture Report
vegetation
bu
sh
fir
e
ha
za
rd
bu
ffe
rz
on
e
Revision Project Architect Stage Project No.
01 Consultant Co-ordination Issue 23/06/2022 CYC Noosa Campsite CG DEVELOPMENT APPROVAL 1302-01 Proposed Development Site Plan
02 Consultant Co-ordination Issue 11/07/2022 48 Kabi Road Cootharaba QLD
A-DA-01.04 04
03 Revised Site Plans 21/07/2022
Client Drawn Status Scale
04 Revised Site Plan 4/08/2022
Christian Youth Council CG/KK PRELIMINARY (NOT FOR CONSTRUCTION) 1:1000 at A1
Revision
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. P:\Data 1\1302-01 CYC Noosa Campsite\5.2 Development Application\5.2.1 ArchiCAD\1302-01_Master DA 24.pln
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.