Skip to the record
Every meeting, every word.

Original source · versioned page text

Traffic Report - responses 11 to 16

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                     Design Response
      Performance outcomes                   Acceptable Outcomes
                                     AO9.4
                                     Pathways have ramps at all kerbs                   Alternate Solution
                                     designed for wheelchair and pram                   See above.
                                     access across roads.
                                     AO9.5                                              Alternate Solution
                                     Development has convenient and                     See above.
                                     prominent pedestrian entrances that:
                                     1.   are orientated towards the street; and
                                     2. cater for universal access.
                                     AO9.6                                Alternate Solution
                                     Pathways are adequately lit and have
                                                                          See above.
                                     navigational signs.
                                     AO9.7                                              Alternate Solution
                                     Pedestrian and cycle pathways are                  See above.
                                     designed and constructed to:
                                     1.   provide a stable, smooth surface,
                                          including across driveways, sections and
                                          joins;
                                     2.   be easily maintained;
                                     3.   have a width and longitudinal gradient to
                                          cater for projected usage;
                                     4.   provide clear sight-lines for safe use; and
                                     5.   be free of any obstructions such as
                                          fences, signage and bollards
                                     AO9.8                                  Not Applicable
                                     Pedestrian routes border the frontages
                                     of residential land, public parks and
                                     business uses with routes through
                                     parking lots or at the rear of lots
                                     avoided.




www.bmctraffic.com.au                                                                                                  34
BMC22089: 59 Kabi Road, Cootharaba
22 March 2023
Log in to download the original file

Traffic Report - responses 11 to 16 .pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.