Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Traffic Report - responses 11 to 16

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Road Design and Construction Table 9.4.7.3 Criteria for assessable development (part)

                                                                                     Design Response
        Performance outcomes                Acceptable Outcomes
Road Design and Construction
PO10                                    AO10                              Not Applicable
Roads and pathways are planned and Road planning and design is in         There are no publicly available new roads
designed to support the function of the accordance with Council’s         proposed as part of this Application.
road hierarchy and ensure that—         Planning Scheme Policy PSP6
                                        Engineering Design Standards –    Internal roads have been tested by 12.5m
1. design and alignment of roads,
                                        Roads, drainage and earthworks.   and 14.5m buses and are fit-for-purpose.
    intersections and all associated
    works—
   1. convey the primary function of
         each type of street;
   2. provide a safe environment for all
         users;
   3. are adequate for the design
         speed environment;
   4. are adequate for predicted traffic
         volumes;
   5. maintains the safe and efficient
         functioning of the road network
         incorporating roundabouts as a
         preference to T intersections;
6. are compatible with existing
    infrastructure;
   7. are easily maintained by Council
         equipment; and
   8. where appropriate, have the
         ability to accommodate public
         transport services;
2. road pavement surfaces—
   1. are durable enough to carry
         estimated wheel loads of
         travelling and parked vehicles;
   2. provide for the safe passage of
         vehicles, pedestrians, cyclists,
         and discharge of stormwater run-
         off from contributing catchments
         and the preservation of all-
         weather access;
3. kerb and channel—




www.bmctraffic.com.au                                                                                                 35
BMC22089: 59 Kabi Road, Cootharaba
22 March 2023
Log in to download the original file

Traffic Report - responses 11 to 16 .pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.