Traffic Report - responses 11 to 16

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Activity Centres and Community Facilities Table 9.4.7.3 Criteria for assessable development (part)

                                                                                             Design Response
       Performance outcomes                     Acceptable Outcomes
Activity Centres and Community Facilities                                                                     N/A


Environmental Protection Table 9.4.7.3 Criteria for assessable development (part)

                                                                                            Design Response
      Performance outcomes                    Acceptable Outcomes
Environmental Protection                                              To be addressed by Civil / Environmental Engineer


External Works and Infrastructure Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes                    Acceptable Outcomes                         Design Response
External Works and Infrastructure
PO14                                       AO14                                N/A
Development is provided with               Where not already existing, the     The surrounding infrastructure is consistent
external works—                            following infrastructure components with the rural zoning of land, including a
1.   along the full extent of the frontage are provided at the frontage of the sealed carriageway in Kabi Road between
     of the site to an appropriate         site—                               the site access and Cootharaba Road.
     standard having regard to the       1.  full width sealed road;
     specified function of the road; and 2.  concrete kerb and channel where
2.   provided beyond the site’s frontage     appropriate;
     if required.                        3.  forming and grading to footpaths;
                                         4.  vehicular kerb and footpath
                                             crossings;
                                         5. a constructed bikeway;
                                         6. a constructed footpath;
                                         7. a constructed carriageway;
                                         8. required alterations to public
                                             utility mains, services or
                                             installations;
                                         9. construction of any required
                                             alterations to public utility mains,
                                             services or installations;
                                         10. stormwater drainage works; and
                                         11. installation of electrical conduits.




www.bmctraffic.com.au                                                                                                     37
BMC22089: 59 Kabi Road, Cootharaba
22 March 2023
Log in to download the original file

Traffic Report - responses 11 to 16 .pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.