Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Traffic Report - responses 11 to 16

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                   Design Response
         Performance outcomes                Acceptable Outcomes
    1. controls vehicle movement by
       delineating the carriageway for all
       users;
   2. conveys road pavement run-off to
       stormwater drainage in a manner
       that allows the road to be
       trafficable in 1%AEP local rainfall
       events; and
4. verges and footpaths provide—
   1. safe access for pedestrians and
       cyclists clear of obstructions;
   2. an access area for vehicles onto
       properties;
   3. a corridor allocated for services
       and utilities; and
   4. additional amenity for minor
       roads.




www.bmctraffic.com.au                                                                36
BMC22089: 59 Kabi Road, Cootharaba
22 March 2023
Log in to download the original file

Traffic Report - responses 11 to 16 .pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.