3.5 RAINFALLINTENSITIES
TherainfallintensitiesforthePreandPostDevelopmentScenariosweredeterminedfromtheIFDchartforthe
NoosaRegioncalculatedfromAR&R,1987.
Table4RainfallIntensities
TimeofConcentration 1yearARI 2yearARI 5yearARI 10yearARI 20yearARI 50yearARI 100yearARI
(mins) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr)
5.33 126.20 159.47 196.90 217.61 246.74 285.14 314.27
5.42 125.46 158.55 195.78 216.39 245.36 283.56 312.53
3.6 FLOWS(UNMITIGATED)
TheflowcalculatedforthePreandPostDevelopmentScenariosforarangeofstormeventsistabulatedbelow.
Table5Flows(Unmitigated)
Q1 Q2 Q5 Q10 Q20 Q50 Q100
Scenario 3 3 3 3 3 3 3
(m /s) (m /s) (m /s) (m /s) (m /s) (m /s) (m /s)
PreDevelopment 0.095 0.128 0.177 0.205 0.243 0.306 0.337
PostDevelopment 0.094 0.128 0.176 0.204 0.242 0.304 0.335
3.7 COMPARISONOFFLOWS
Thereisnonetincreaseinflowduetotheproposeddevelopmentastabulatedbelow.
Table6ComparisonofFlows
Q1 Q2 Q5 Q10 Q20 Q50 3
Scenario 3 3 3 3 3 3 Q100(m /s)
(m /s) (m /s) (m /s) (m /s) (m /s) (m /s)
PreDevelopment 0.095 0.128 0.177 0.205 0.243 0.306 0.337
PostDevelopment 0.094 0.128 0.176 0.204 0.242 0.304 0.335
ToBeDetained 0.001 0.000 0.001 0.001 0.001 0.002 0.002
A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be
requiredtoensurenonetincreaseinpostdevelopmentdischargetothestreetdrainagenetworkwithinGibson
RoadandSkipperPlace.
SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD 37GibsonRoad,Noosaville Page 7
[OCR of page images]
————4
URBANCONSULTANTS
3.5 RAINFALL INTENSITIES
The rainfall intensities for the Pre and Post Development Scenarios were determined from the IFD chart for the
Noosa Region calculated from AR&R, 1987.
Table 4 - Rainfall Intensities
Time of Concentration 1 year ARI 2 year ARI 5 year ARI 10 year ARI 20 year ARI 50 year ARI 100 year ARI
(mins) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr)
5.33 126.20 159.47 196.90 217.61 246.74 285.14 314.27
5.42 125.46 158.55 195.78 216.39 245.36 283.56 312.53
3.6 FLOWS (UNMITIGATED)
The flow calculated for the Pre and Post Development Scenarios for a range of storm events is tabulated below.
Table 5 - Flows (Unmitigated)
a Qi Q2 Qs aio Q20 Q50 Q100
(m*/s) (m*/s) (m*/s) (m*/s) (m*/s) (m*/s) (m*/s)
Pre Development 0.095 0.128 0.177 0.205 0.243 0.306 0.337
Post Development 0.094 0.128
0.176 0.204 0.242 0.304 0.335
3.7. COMPARISON OF FLOWS
There is no net increase in flow due to the proposed development as tabulated below.
Table 6 - Comparison of Flows
Scenario oe or oF
cfs) | (ms) | mls) | tls) | (mls) | (mifay | 200078)
Pre Development 0.095 0.128 0.177 0.205 0.243 0.306 0.337
Post Development 0.094 0.128 0.176 0.204 0.242 0.304 0.335
To Be Detained -0.001 0.000
-0.001 | -0.001 | -0.001 | -0.002 -0.002
A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be
required to ensure no net increase in post development discharge to the street drainage network within Gibson
Road and Skipper Place.
SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.