4.0 CONSTRUCTIONPHASEWATERQUALITYMANAGEMENT
4.1 POLLUTANTS
Typicalpollutantsgeneratedduringtheconstructionphaseofthedevelopmentareshownbelow(GoldCoastCity
Council,2005).
Table7ConstructionPhasePollutants
Pollutant PotentialSource Priority
Paper, construction packaging, food packaging,
Litter High
cementbags,offcuts
Unprotected exposed soils and stockpiles during
Sediment High
earthworksandbuildingworks
Fuel and Oil spills, leaks from construction
Hydrocarbons High
equipmentandtemporarycarparkareas
CementSlurry,asphaltprimer,solvents,cleaning
ToxicMaterials Medium
agents,washwaters(eg.fromtileworks)
Alkalinesubstances Cementslurryandwashwaters High
4.2 POTENTIALIMPACTS
The addition of coarse / fine sediments and other pollutants to stormwater runoff from the development sites
may increase nutrient loads of receiving water, potentially resulting in eutrophication. Impacts on the
surroundingenvironmentwillbeminimisedduringtheconstructionphasewithmeasuresasoutlinedinthisSite
BasedStormwaterManagementPlanandErosionandSedimentControlPlanstobeprovidedattheoperational
worksstage.
4.3 PERFORMANCEOBJECTIVESANDINDICATORS
Theamountofrunoffcrossingandleavingthesiteshouldbekepttoaminimumduringtheconstructionphase.
Thiswillrestrictsoilerosionandmobilisationofsedimentsandpollutantsthroughandoffthesite.
Stormwaterrunoffatdischargepointsduringtheconstructionphaseshallconformtotheperformancecriteriaas
tabulatedbelow(GoldCoastCityCouncil,2005).
SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD 37GibsonRoad,Noosaville Page 8
[OCR of page images]
JF
AU
URBANCONSULTANTS
4.1 POLLUTANTS
Typical pollutants generated during the construction phase of the development are shown below (Gold Coast City
Council, 2005).
Table 7 - Construction Phase Pollutants
Pollutant Potential Source Priority
. Paper, construction packaging, food packaging, |
Litter High
cement bags, off-cuts
. Unprotected exposed soils and stockpiles during .
Sediment a High
earthworks and building works
Fuel and Oil spills, leaks from construction .
Hydrocarbons . High
equipment and temporary carpark areas
. | Cement Slurry, asphalt primer, solvents, cleaning .
Toxic Materials Medium
agents, washwaters (eg. from tile works)
Alkaline substances | Cement slurry and washwaters High
4.2 POTENTIAL IMPACTS
The addition of coarse / fine sediments and other pollutants to stormwater runoff from the development sites
may increase nutrient loads of receiving water, potentially resulting in eutrophication. Impacts on the
surrounding environment will be minimised during the construction phase with measures as outlined in this Site
Based Stormwater Management Plan and Erosion and Sediment Control Plans to be provided at the operational
works stage.
4.3. PERFORMANCE OBJECTIVES AND INDICATORS
The amount of runoff crossing and leaving the site should be kept to a minimum during the construction phase.
This will restrict soil erosion and mobilisation of sediments and pollutants through and off the site.
Stormwater runoff at discharge points during the construction phase shall conform to the performance criteria as
tabulated below (Gold Coast City Council, 2005).
SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.