Council archive · source document
Development Proposal Report [As Published] · 132007.2399
(b) Body Corporate Community Management Statement: The by-laws contained in
the community management statement will be similar to the above covenants. In
addition to the vendor, the body corporate will also be required to review and
approve the building designs. Draft by-laws for the proposed development are
provided in Appendix 10 to illustrate the types of building controls that are
planned to be applied.
4.7. Tenure
It is proposed to reconfigure the site. First, create a lot having its perimeter boundary
of the proposed residential development site and the balance of the existing Lot
being part of the golf course etc. Secondly, reconfigure that Lot pursuant to the Body
Corporate and Community Management Act to create twenty seven (27) residential
lots and common property and to create an access easement over part of the
common property. Reconfiguration as a community title scheme is regarded as an
appropriate ownership and management structure for the proposed development.
4.8. Caretaking
Property management and caretaking services will be provided to the body corporate
to maintain the common property landscaped areas in a similar way to the high
standards elsewhere within Noosa Springs.
4.9. Golf Course Improvements
The proposal is to improve the golf course by the realignment of the first part of the
18th hole. Being the last hole played by a golfer, it is desirable for it to have a
memorable character. The realignment of the hole improves it as follows:
(a) Increases the number of golf tees to four (championship, members, social and
ladies). The existing hole has three tees, where members and social players
share a tee.
(b) The golf tees located along the small lake is superior to the existing arrangement.
The golf shot from the championship tee will be across water and the dry native
grass area.
(c) Mounding and bunkering of the hole will improve the aesthetics of the hole.
(d) The small lake is designed to be higher and water will cascade down a rock
waterfall feature to the existing watercourse. Therefore, the outlook from the 9th
Development Proposal Report (Noosa Springs – Precinct J) Page 15 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Proposal Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 371 KB (small file)
- File type
No other editions are linked here.