Other Change Decision Notice - Council Meeting Decision 132007 2446 05 · 132007.2446.05

of 24

Text shows just the words. Original shows the document exactly as it was published.

                        f.      Indicate the location of any “holding” areas for heavy vehicles;
                        g.      Operating hours and
                        h.      Strategy to protect Council’s existing infrastructures.
                 48.    Any damage caused to any public utility (eg pipelines, drainage pits, pathways, roads
                        etc) during the course of construction shall be repaired to Council’s standards and at no
                        cost to Council.
                 49.    Any alteration of any public utility or other facilities necessitated by the development of
                        the land or associated construction works external to the site shall be at no cost to
                        Council.
                 50.    The transportation of all materials to and from the site shall be undertaken in a manner
                        such that no particle matter escapes onto a public road. All vehicles carrying materials
                        either to or from the site shall be covered to prevent materials including dust being
                        windblown from the vehicle.
                        Refuse
                 51.    The developer must provide waste storage and disposal facilities in accordance with
                        Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
                        and Industrial Premises”, including an external imperviously paved area correctly sized
                        for all refuse and recycling containers and suitably screened from public places and
                        neighbouring properties. A bin wash area is required with a cold-water tap, hose and
                        drain outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to
                        prevent storm water entry to the sewerage system and this can be achieved with a nib
                        wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste
                        area can be roofed, or any other design approved by Council.
                 52.    Refuse containers must be provided in accordance with the requirements of the
                        Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                        Regulation 2000, for the storage and collection of refuse.
                 53.    A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
                        No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”,
                        must be submitted for the day-to-day operation of the development and approved by
                        Council’s Health Section prior to issue of development permit for operational works.
                        It is critical that waste areas are properly planned. A copy of Planning Scheme Policy
                        No. 9 explaining exactly how to predict waste quantities and design waste areas is
                        available from Council and the web. The Plan shall include the following information: -
                        •       The types of waste that will be generated from the activities approved within the
                                development.
                        •       Estimated volumes or tonnage of both recyclables and waste generated.
                        •       Methods to be used for dealing with garden waste.
                        •       Initiatives to minimize waste either by waste prevention, reduction, re-use or
                                recycling.
                        •       Description of procedures for getting all waste to the bins; the storage of bins and
                                the collection of bins by the contractor.
                        •       A description of the design details of waste storage and recycling areas including
                                size, location, elevation and floor plan, methods of bin washing and system to
                                prevent storm water getting into sewer via the bin wash.
                        •       A description of types and volume of waste storage containers to be used.
                        •       The waste and recycling storage area shall include the provision of containers for
                                all waste and recycling materials including putresable matter, non-recycling waste,
                                paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc,
                                and bin washing facilities connected to sewer.


                                                                                                          Page 8 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Used in these records

About this file

File size
254 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Other Change Decision Notice - Council Meeting Decision 132007 2446 05.pdf · 254 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.