GENERAL COMMITTEE MEETING 12 DECEMBER 2016
Car Parking
14. A minimum of 21 car parking spaces must be provided and marked on the site
and made available and accessible at all times while the use is open for business.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. service vehicle parking, manoeuvring and standing spaces
b. dimensions, crossfalls and gradients in accordance with Australian
Standards AS/NZS2890.1:2004, AS/NZS2890.6:2009 and
AS2890.2:2002.
15. The carparking area must be constructed with either a sealed surface or other
bound material that is suitable for the intended use. Certification of the proposed
surfacing from an RPEQ must be submitted as part of the operational works
application.
16. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
17. Directional signage must be provided to direct visitors and guests to the car
parking spaces provided on site.
Traffic Management
18. A traffic management plan for both the regular operation of the development and
any special events must be submitted as part of the Operational Works
application. The traffic management plan must include but not be limited to:
a. day to day parking of the various vehicle types
b. parking for larger vehicles (buses, deliveries, waste collection etc)
c. overflow parking for special events
d. temporary traffic control measures on McKinnon Drive
e. endorsement by the Department of Transport and Main Roads.
Stormwater Drainage
19. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. collection of runoff from the buildings and hardstand areas
b. collection of runoff from the carparking areas and access aisles
c. certification from an RPEQ that states the development of the site will not
create a worsening for downstream properties in regard to stormwater
quality or quantity.
Earthworks and Retaining Walls
20. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
Page 5 of 11