Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Engineering Drawings Part 1 - OPW14/0197

Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

REFER TO JOIN TO SL
EXISTING PAVEMENT DETAIL

CH 00.000

START OF WORKS

CH 14.000

INTERSECTION SEA EAGLE DRIVE

INTERSECTION CARISSA PLACE

 

 

 

 

 

CH 95.160

 

CH 136.415

INTERSECTION DODONAEA CLOSE

 

(. CH 161.709 RL 11.219

CH 243.446

CENTRE OF CUL-DE-SAC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PRELIMINARY PAVEMENT DESIGNS

 

 

BASE SUB BASE |LOWER SUB BASE
A TOTAL
ROAD STREET CLASSIFICATION TRAFFIC ASSUMED | SURFACING fy ts) BOX
ESA's CBR (mm) :
(TYPE 2.2) | (TYPE 2.3) (if required) (mm)
AGATHIS PLACE ACCESS ROAD 5 x 10° 3 30 100 150 380

 

 

 

 

 

 

 

 

 

 

1, ALL ASPHALT TO BE UNDERLAID WITH 10mm PRIMER SEAL OR PRIME AND SEAL ALTERNATIVE

 

 

NOTES:

 

1, PRELIMINARY PAVEMENT DESIGNS HAVE BEEN BASED ON THE ASSUMED SUBGRADE CBR SHOWN. ACTUAL PAVEMENT DESIGNS WILL BE BASED ON
TEST RESULTS TAKEN AFTER STRIPPING HAS BEEN COMPLETED.

2. EARTHWORK QUANTITIES HAVE BEEN CALCULATED USING THE PAVEMENT DESIGN TO SUB BASE DEPTH ONLY, AS SHOWN ON THE CROSS SECTIONS.
3. THE SELECTED FILL QUANTITY, DETERMINED BY TEST RESULTS, SHALL INCLUDE FOR EXCAVATION.

4. WHEN THE TOTAL PAVEMENT DEPTH (AS DETERMINED BY SUBGRADE TESTS) EXCEEDS THE NORMAL DEPTH, THE PAVEMENT GRAVEL SHALL EXTEND
UNDER THE KERB AND CHANNEL TO 150mm BEHIND (TYP).

 

150 150

| MIN.

 

EXIST. EDGE OF BITUMEN

AC SURFACE \
PAVEMENT AS secceey_/

 

 

EXISTING PAVEMENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

z Fe a JOIN TO EXISTING PAVEMENT DETAIL
= iS a NTS
VC 60.0 VC 30.0
(R751.0} (R481.8)
-albabte -abi6e% 228% 5.000%
DATUM RL -2.0
CUT (-) 7 FILL BRRaee 28 SSS Se5 8 § apasigScese f8 Sse
LHS LIP LEVEL a5 58205 5 2 ages 3
® J Ie ®
RHS LIP LEVEL 3 ag ® 5 5 a 3
EXISTING SURFACE & Bea 8R5 as a a|8 g 88 2 q Za88 a8 aie
HORIZONTAL CURVES R500 R750
@® REFER INTERSECTION DETAILS FOR LEVELS
FILE: N13078-113.dwq DATE: 11-04-2014 TIME: 09:07
iXref's: X-N13078-TIT X-N13078-ROADS USR: Joshua Beddow
Tas [ons [nw] One soon SORE TETEET caer > SAWN TE
~~ te A fan “eewes owe ™ te {2030 a SUNNEVATION PARKWAY, BIRTINYA QM PROPERTIES q CONSULT AUSTRALIA AGATHIS PLACE
tr SORZONTAL Ph (07) 5436 7888 Fax (07) 5493 6630 —_ DT LONGITUDINAL SECTION
B[C Drawn check} 1.100 0 2 A APPROVED SHAUN PILCHER REQ 14593 Browm Consult (QLD) Pty Ltd a]
Hp 200 3 Le ati HL ea 78 LAKE DOONELLA NOOSA i Al Veen ore rie CLD a 75 RAVING NOMBER
if rare war nbulermoeane ant STAGE Ci - C6 Smart Consulting eisaeraiem ems N13078-113

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

Engineering Drawings Part 1 - OPW14_0197.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.