Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Engineering Drawings Part 1 - OPW14/0197

Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

w
© 2
a a
- LOT 155 -
- INTERSECTION DODONAEA CLOSE -
CH 140.000 \ DATUM RL_9
| FINISHED RL 12.154
I
- LOT 156 -
6.00m, 400m 1 3.00m | 3.00m 450m, |
F 0.90 | 301 Ac. SURFACING
90m mm AC.
GRADE vy, cr re ge
~ : ~ . J
T Max Z
2
a
i © 2
CH 120.000 : DATUM _RL11 - LOT 149 -
FINISHED RL 13.877 ~ LOT 154 -
I
CH 220.000 DATUM RL_15
. FINISHED RL 16.009
- LOT 156 - *
- INTERSECTION CARISSA PLACE -
2 2
- LOT 148 -
- LOT 155 -
CH 200.000
CH_100.000 DATUM RL FNERED Rt 150
FINISHED RL 15.600 :
ws ws
5 - LOT 155 - © e
e 5 2 = LOT 162 - a
REFER N13078-109 FOR
RETAINING WALL NS | - BASIN ACCESS -
i
T cE
- LOT 156 - \
CH 180.000 \ DATUM RL_8
CH 80.000 \ DATUM RL13 | FINISHED RL 11.883
FINISHED RL 17.306
I
I
© © ~ LOT 161 - - LOT 155 -
— LOT 157 - a a ROTATE CROSS FALL
TO -2%, 3.0m EITHER SIDE
OF CHAINAGE 162.000
o i
Ne ay
CH 60.000 | DATUM _RL16 TYPE ‘B1’ KERB AND CHANNEL
I FINISHED RL 18.624 ' TO IPWEAG STD DRG R-0080.
| CH 160.000 | DATUM RL 8
& 16.50m ROAD RESERVE a 3, FINISHED RL 11.225
&
VARIES 3.75m | 3.75m 1 4.50m VARIES 3|
- LOT 158 - 30mm AC. ‘SURFACING | S
he)
LING ta awe
aa 3% | 3% 2%
1.2m CONCRETE FOOTPATH TO L B
CH 40 000 |.P.W.E.A.Q STD. DRG. R-0065 DATUM RL18
al TYPE ‘M1’ KERB AND CHANNEL FINISHED RL 19.407
g TO IPWEAQ STD DRG R-0080.
5 SUBSURFACE PAVEMENT DRAIN
S| TO IPWEAQ STD DRG R-0140,
FILE: N13078-114.dwg DATE: 11-04-2014 TIME: 09:11
iXref's: X-N13078-TIT X-N13078-ROADS USR: Joshua Beddow
Tear [CAs ean] ONT SORE TEREST TACROPTN Coen DRAWN TTT
AMENOMENT DETAILS Desion cnecK SURVEYOR: RPS
aa 1 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES \ AGATHIS PLACE
ie 100 10 23 4 os Ph (07) 5436 7888 Fax (07) 5493 6630 moe CROSS SECTIONS
8 C prawn cncx| 12°? 8 PROJECT Wo APPROVED SHAUN PILCHER REQ 14593 LAKE DOONELLA NOOSA Pry at
. Ze . yl .
ile N13078 i bvET TDS 40 Td TAGE Ci Smart Conseelting ‘tunis in bin a eats Ca oe Ke aa
sir FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD S GE C1 - C6 ‘Aha Capron Bantireoee —L1c 4084 N13078-114

 

 

 

 
Log in to download the original file

Engineering Drawings Part 1 - OPW14_0197.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.