Original source · versioned page text
Engineering Drawings Part 1 - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
PRELIMINARY PAVEMENT DESIGNS BASE SUB BASE |LOWER SUB BASE TRAFFIC ASSUMED | SURFACING (mm) (mm) (mm) TOTAL ROAD STREET CLASSIFICATION EA's CBR nm) (CBR 60) (CBR 45) (cBR'15) BOX (TYPE 2.2) (TYPE 2.3) (if required) (mm) CARISSA PLACE ACCESS ROAD 5 x 10° 3 30 100 100 150 380 1. ALL ASPHALT TO BE UNDERLAID WITH 10mm PRIMER SEAL OR PRIME AND SEAL ALTERNATIVE js ol NOTES: als Sin 1. PRELIMINARY PAVEMENT DESIGNS HAVE BEEN BASED ON THE ASSUMED SUBGRADE CBR SHOWN. ACTUAL PAVEMENT DESIGNS WILL BE BASED ON ale wi TEST RESULTS TAKEN AFTER STRIPPING HAS BEEN COMPLETED. ol” os 2. EARTHWORK QUANTITIES HAVE BEEN CALCULATED USING THE PAVEMENT DESIGN TO SUB BASE DEPTH ONLY, AS SHOWN ON THE CROSS SECTIONS. = S 3. THE SELECTED FILL QUANTITY, DETERMINED BY TEST RESULTS, SHALL INCLUDE FOR EXCAVATION. El ° 4. WHEN THE TOTAL PAVEMENT DEPTH (AS DETERMINED BY SUBGRADE TESTS) EXCEEDS THE NORMAL DEPTH, THE PAVEMENT GRAVEL SHALL EXTEND S uy UNDER THE KERB AND CHANNEL TO 150mm BEHIND (TYP). wi Ss co 2 E oO rT Ww oO oc wi E = 3 pp z tL = Ll Rs < 3 8 g le z = 2 5 s & & & ja 2 a VC_10.0 VC 30.0 VC 50.0 (R285.7) (R4&89.8) (R891.4) -3.000% 0.500% 6.625% 1.016% DATUM RL 5.0 el elsigigisigiaisisisisia/sisis/ sl asl ag CUT (-) 7 FILL S sessssasssgss3 3 | 83) OSS LHS LIP LEVEL sega agesescsess3 5 2 ® g eelalsisie] a) s 5 ® RHS LIP LEVEL 4 agigelciel el s 3 3 eletssl sled ele all ovis DESIGN SURFACE 3 8 a8 3) 8 a) gis al dulaleleleelelelsiaiciaigle s| e s-| alal EXISTING SURFACE QR se See aR RSs sss 3 si qe) aS 2] Oa eyja a cel sisicieicieje| es as a|&I slelyigisielsigaisisiga|e| 8 33, 38 CHAINAGES s| sa aajssaasyaysjajaieis| &| gS eicl ala g| cjelzlelsieialasisisisjsjeja) e| gg 3 R25.000 R14.000 HORIZONTAL CURVES @® REFER INTERSECTION DETAILS FOR LEVELS FILE: W78-115.dwg DATE: 11-04-2014 TIME: 09:13 Xpefs: X-N13078-TIT X-N13078-ROADS USR: Joshua Beddow sar [ence an] On SORE TETEET TROOP To caer DRAWS TTT AMENOMENT DETAILS DeSiaN cHecK SURVEYOR: RPS a ~~ te A fan te Oh? 2030 _ 40 sd a 1 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES q CONSULT AUSTRALIA CARISSA PLACE ae SONeNTAL Ph (07) 5436 7888 Fax (07) 5493 6630 —_ wD LONGITUDINAL SECTION pic prawn cHeck| 1100 2 1 0 2 4 oa PROJECT No. APPROVED SHAUN PILCHER RPEQ 14583| Brown Consulthg (QLD) Pty Ltd ale LAKE DOONELLA NOOSA : wigs Ea HE wm VERTEAL ©) N13078 (Fee faeans baa STAGE C1 - C6 Smart Conseelting ‘tunis in bin a eats Ca oe Ke N12078-115 aa siF FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD Rinbene Corboun Wilbomrin Aychiny Cagwpone Gemetinecoet Lic 4064 -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.