Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Engineering Drawings Part 1 - OPW14/0197

Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PRELIMINARY PAVEMENT DESIGNS

 

 

 

 

 

 

 

 

 

 

 

 

BASE SUB BASE |LOWER SUB BASE] gta,
TRAFFIC | ASSUMED | SURFACING nm) nm) nm)
ROAD STREET CLASSIFICATION ESA's CBR (mm) (CBR 60) (CBR 45) (CBR 15) BOX
(TYPE 2.2) | (TYPE 2.3) | (if required) (mm)
DODONAEA CLOSE ACCESS STREET 5 x 10° 3 30 100 100 260 490
1. ALL ASPHALT TO BE UNDERLAID WITH 10mm PRIMER SEAL OR PRIME AND SEAL ALTERNATIVE

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

  
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ws on
ols ed
<{s Hl
ae 1 (oo
alx wa) NOTES
ol ae 1. PRELIMINARY PAVEMENT DESIGNS HAVE BEEN BASED ON THE ASSUMED SUBGRADE CBR SHOWN. ACTUAL PAVEMENT DESIGNS WILL BE BASED ON
= 5 TEST RESULTS TAKEN AFTER STRIPPING HAS BEEN COMPLETED.
EI o 2. EARTHWORK QUANTITIES HAVE BEEN CALCULATED USING THE PAVEMENT DESIGN TO SUB BASE DEPTH ONLY, AS SHOWN ON THE CROSS SECTIONS.
g 5 3. THE SELECTED FILL QUANTITY, DETERMINED BY TEST RESULTS, SHALL INCLUDE FOR EXCAVATION.
= Lu 4, WHEN THE TOTAL PAVEMENT DEPTH (AS DETERMINED BY SUBGRADE TESTS) EXCEEDS THE NORMAL DEPTH, THE PAVEMENT GRAVEL SHALL EXTEND
o fe UNDER THE KERB AND CHANNEL TO 150mm BEHIND (TYP).
5 a
ww Oo
n
oc
wi - LOT 174 - 2 2
z - LOT 176 -
A —
ZA I oa
3 \
5 CH 100.000 | DATUM RL_13
s FINISHED RL 15.887
S | «
a o 7 a 6.00m - LOT 176 -
a 2
7)
mm] - LOT 172 - eT
= 1500 x 1200 RBC ——
FAUNA CROSSING gr
I
0
CH 80.000 DATUM RL_12
FINISHED RU 14.455
450g rcp cutvert ~/) 2
~
| fe 2 a
gs a =
a) & = 5
zie z z
s|E z z
=| & = = | DATUM RL 8
Ve 10.0 VC 40.0 VC 30.0 wl FINISHED RL 13.160
(R666.7) (R548.7) (R1075.1) oe 5! =
-3.000% 0.500% 191% 5.000% 8
-1.000%,
DATUM RL -2.0
SPRAY CONCRETE FINISH
glslaialalcloisl alm els slzl ald TO CORRIDOR CROSSING.
CUT (-) 7 FILL Ssle8gi8Sz) s 8 ss gs) Baie 4.2m CONCRETE FOOTPATH TO
WAslasfssjaap S/S) {ls sls} SJs/s LP.W.E.A.Q STD. DRG. R-0065
Sglg= Sq Ssis}s sis ———
LHS LIP LEVEL Ssgsg Sa Baa ss _ ff a
® ®
a asl gl | as
RHS LIP LEVEL q g5 8 @ BR CH 40.000 | DATUM RL_7
= = = = SF | FINISHED RL 12.488
DESIGN SURFACE sie3 Ss ss 8833 ss as a 16.50m ROAD RESERVE a
gas) Ss 9 sss 4 ele ae tam HIGH POOL TYPE FeNce To pe WARIES 5.00m 300m | 3.00m 5.00m VARIES
.2m
lal 6 aul lela al alal vlalelslalal LANDSCAPE ARCHITECTS DETAILS 30mm AC. SURFACING
EXISTING SURFACE 3) 2 Bela} SiS Bs/F 3) Be) sisiqays SPRAY CONCRETE FINISH 2.0% 3.0% 3.0% 2.0% >
asia sala] sf sale) s} aly) clejeisigis TO CORRIDOR CROSSING Ny = _ WG
SK i] V id OX _
VX SS el
ecleisiels| asi esigieie] Sis} sisleaisig SS ee
CHAINAGES sssaSasyss) ss) gees Se) ASS SRA |
galdelseigials| ols seis) se) 85) SS sis fo a
eo SUBSURFACE PAVEMENT DRAIN e!
TO IPWEAG STD DRG R-0140. 5 TYPE ‘Mi" KERB AND CHANNEL
HORIZONTAL CURVES 820.000 | R-200.000 CH 20.000 & TO IPWEAQ STD DRG R-0080. DATUM RL 8
FINISHED RL 12.345
@® REFER INTERSECTION DETAILS FOR LEVELS
FILE: N13078-117.dwq DATE: 11-06-2014 TIME: 10:06
iXref's: X-N13078-TIT X-N13078-ROADS USR: Joshua Beddow
mar Tons awe] Ore SORE METRES T TACROPTENT Ne STENT DRAWN THE
AMENOMENT DETAILS DESIGN cHecx SURVEYOR: RPS
mete Tk fea 1000 —— es — es, 1 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES q coer DODONAEA CLOSE
ie ta000 HORIZONTAL % Ph (07) 5436 7888 Fax (07) 5493 6630 =< er LONGITUDINAL SECTION
c FRORECT
bic DRAWN CHECK] 1100 2 1 0 2 4M PROJECT No. ‘APPROVED SHAUN PILCHER RPEQ 14593| Brown Consulting (QLD) Pty Lt AND CROSS SECTIONS
ale LAKE DOONELLA NOOSA : wigs Ea
ie tam VERTEAL ©) N13078 (Fee faeans baa STAGE C1 - C6 Smart Conseelting ‘tunis in bin a ails Grey [ova women aa
siF FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD - eee Gateer Mo toy awe tivo: Te Bh N13078-117

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

Engineering Drawings Part 1 - OPW14_0197.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.