Original source · versioned page text
Engineering Drawings Part 1 - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
PRELIMINARY PAVEMENT DESIGNS BASE SUB BASE |LOWER SUB BASE TRAFFIC ASSUMED | SURFACING (mm) (mm) (mm) TOTAL ROAD STREET CLASSIFICATION FSA's cer ‘mm (CBR 60) (CBR 45) (CBR 5) BOX (TYPE 2.2) | (TYPE 2.3) (if required) (mm) MORINDA CIRCUIT ACCESS STREET 5 x 10 3 30 100 100 350 580 1. ALL ASPHALT TO BE UNDERLAID WITH 10mm PRIMER SEAL OR PRIME AND SEAL ALTERNATIVE NOTE 1. Ss: PRELIMINARY PAVEMENT DESIGNS HAVE BEEN BASED ON THE ASSUMED SUBGRADE CBR SHOWN. ACTUAL PAVEMENT DESIGNS WILL BE BASED ON TEST RESULTS TAKEN AFTER STRIPPING HAS BEEN COMPLETED. EARTHWORK QUANTITIES HAVE BEEN CALCULATED USING THE PAVEMENT DESIGN TO SUB BASE DEPTH ONLY, AS SHOWN ON THE CROSS SECTIONS. ale wie 3. THE SELECTED FILL QUANTITY, DETERMINED BY TEST RESULTS, SHALL INCLUDE FOR EXCAVATION. xe == 4. WHEN THE TOTAL PAVEMENT DEPTH (AS DETERMINED BY SUBGRADE TESTS) EXCEEDS THE NORMAL DEPTH, THE PAVEMENT GRAVEL SHALL EXTEND of als UNDER THE KERB AND CHANNEL TO 150mm BEHIND (TYP). = wu w/o er o = bE ° a co z Z| = 2g E = 2 n 3 S 2 3 i a z AC SURFACE BI 150, 150 \ x | MIN. EXISTING PAVEMENT [fr WA PAVEMENT AS SPECIFIED REFER TO JOIN TO JOIN TO EXISTING PAVEMENT DETAIL EXISTING PAVEMENT DETAIL ss NTS aS ae 22 33 sos a | VG_ 30.0 Vc 10.0 wo | ~ LOT 75 - (R518.8) (RI58.2) * a 11137% 2.0R083% ! - LOT 119 - DATUM RL 6.0 os ! CUT (-) 7 FILL See sggeagess CH _1480.000 | DATUM RL 16 aaa] s sass ae | FINISHED RL 17.471 2 lal] oleleol ||| Z| a\giS) |S s/alala © Oy e LHS LIP LEVEL age] ssa a 16.50m ROAD RESERVE a - LOT 73 - |. ® VARIES, 4.50m 3.00 | 3.00m 450m . VARIES cy | 1 &\al\S| 2 0.501 30mm_AC. SURFACING RHS LIP LEVEL ees 8 - LoT 119 - | : | Le a 2% 3% 3% 2% Blals) 38 a) fl S|\9 1 IN & (MAX) TYPE ‘M1’ KERB AND CHANNEL DESIGN SURFACE gigel de adele CH 1460.000 f | TO IPWEAQ STD DRG R-0080. DATUM RL _16 2.0m CONCRETE FOOTPATH TO a! SUBSURFACE PAVEMENT DRAIN FINISHED RL 17.244 melal we clelelmia LP.W.E.A.Q STD. DRG. R-0065 el TO IPWEAG STD DRG R-0140. EXISTING SURFACE gigis} 35 ala R55 Z| Sse) ee 22) 2) ee oa Bae Sejessisiss CHAINAGES ssis) Seisisigjslsiais 3]3/3) S]3/3)3/S)3/3)3)/2 R-20.000 R-20.000 HORIZONTAL CURVES *24, @® REFER INTERSECTION DETAILS FOR LEVELS FILE: N13078-118.dwq DATE: 11-06-2014 TIME: 10:22 iXref's: X-N13078-TIT X-N13078-ROADS USR: Joshua Beddow mar Tons awe] Ore SORE METRES T TACROPTENT Ne STENT DRAWN THE AMENOMENT DETAILS DESIGN cHecx SURVEYOR: RPS mete Tk fea oon —— 1 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES q coer MORINDA CIRCUIT tn HORIZONTAL Ph (07) 5436 7888 Fax (07) 5493 6630 moe wD LONGITUDINAL SECTION pic prawn cHecx| 1100 2 0 2 4 oa PROJECT No. APPROVED SHAUN PILCHER RPE. 14583 Brown Consulthg (QLD) Pty Ltd ale LAKE DOONELLA NOOSA : wigs Ea HE wm VERTEAL ©) N13078 (Fee faeans baa STAGE C1 - C6 Smart Conseelting ‘tunis in bin a ails Grey [ova women 1078-118 aa siF FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD Rinbene Corboun Wilbomrin Aychiny Cagwpone Gemetinecoet Lic 4064 ~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.