Original source · versioned page text
Engineering Drawings Part 1 - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
PRELIMINARY PAVEMENT DESIGNS BASE SUB BASE |LOWER SUB BASE TRAFFIC ASSUMED | SURFACING (mm) (mm) (mm) TOTAL ROAD STREET CLASSIFICATION ESA's CAR ‘mm) (CBR 60) (cBR'4S) (CBR 5) BOX (TYPE 2.2) (TYPE 2.3) (if required) (mm) wis oR MULBERRY CLOSE ACCESS STREET 5 x 10° 3 30 100 100 260 490 S a ms Os 1. ALL ASPHALT TO BE UNDERLAID WITH 10mm PRIMER SEAL OR PRIME AND SEAL ALTERNATIVE wi als a = = 5 w oO S 5 NOTES: = w 1. PRELIMINARY PAVEMENT DESIGNS HAVE BEEN BASED ON THE ASSUMED SUBGRADE CBR SHOWN. ACTUAL PAVEMENT DESIGNS WILL BE BASED ON ° fe TEST RESULTS TAKEN AFTER STRIPPING HAS BEEN COMPLETED. 2 Zz 2. EARTHWORK QUANTITIES HAVE BEEN CALCULATED USING THE PAVEMENT DESIGN TO SUB BASE DEPTH ONLY, AS SHOWN ON THE CROSS SECTIONS. wi oO 3. THE SELECTED FILL QUANTITY, DETERMINED BY TEST RESULTS, SHALL INCLUDE FOR EXCAVATION. Zz & 4. WHEN THE TOTAL PAVEMENT DEPTH (AS DETERMINED BY SUBGRADE TESTS) EXCEEDS THE NORMAL DEPTH, THE PAVEMENT GRAVEL SHALL EXTEND a UNDER THE KERB AND CHANNEL TO 150mm BEHIND (TYP). z = & a 7 + ee | Z 7 | - LOT 127 - 2 ' 2 - LOT 132 - | E eg & z Rog Ps CH 60.000 DATUM RL 14 z z 1 FINISHED RL 16.129 a 8 g o | o G ES a - 16.00m ROAD RESERVE “ - LOT 126 - 5 5 Ss ‘ 6.00m 5.00m 300m | 300m 5.00m VARIES. a a. Eo - LOT 133 - ‘ | ; 090m wee ¢ 10.0 VC 40.0 VARIES ; | | | 5 ye 7919) (R380.4) Si 2% 3% 3% 2% pe ute tI | ul 1.2m CONCRETE FOOTPATH TO 30% 2m DATUM RL -2.0 rr CH 40.000 LP.W.E.A.Q_STD. DRG._R-0065 DATUM RL_13 : . FINISHED RL 14.618 viol wlgiolelsls|elelaiaislulvisl el CUT (-) 7 FILL as) SRST RSs zagss s : TT] SSNS STS TT SSS SS] S| 5 a yy gzecisiisielsl LHS LIP LEVEL RAS SSS SSSI | - LOT 125 - ® “FEE @H - LOT 134 - 2 \ 2 slaisiaiclsiaisisis RHS LIP LEVEL RASTER a SSS "| | eo ~ Ty 7 ah T i DESIGN SURFACE 88 SSSR FFs ssgggeg gs CH 20.000 | DATUM RL_11 as} sidisigisidsiaisialsiss) 3 a CTYPE ‘M1’ KERB AND CHANNEL FINISHED RL 12.406 Ae 7" ee &! TO IPWEAQ STD DRG R-0080. nleal elulv|4|o| ol nlal ell o al Z| SUBSURFACE PAVEMENT DRAIN EXISTING SURFACE Be Sere assRssiss) & Ss TO IPWEAQ STD DRG R-0140. als) 4)4) 4/4) 4) 4 slululul |<) 6) 5) eleieiclelaisicizieizieiwicl CHAINAGES ga Res sseqyessgas & a3) s]=/4/2 ajsjesiajgieis| s R60.000 HORIZONTAL CURVES @® REFER INTERSECTION DETAILS FOR LEVELS FILE: N13078-119.dwq DATE: 11-06-2014 TIME: 10:24 iXref's: X-N13078-TIT X-N13078-ROADS USR: Joshua Beddow mar Tons awe] Ore SORE METRES T TACROPTENT Ne STENT DRAWN THE AMENDMENT DETAILS DESIGN cHecx SURVEYOR: RPS mete Tk fea ae 1 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES q coer MULBERRY CLOSE a MORIZONTAL Ph (07) 5436 7888 Fax (07) 5493 6630 moe er LONGITUDINAL SECTION 5 pd bic DRAWN CHECK] 1100 2 1 0 2 4M PROJECT No. ‘APPROVED SHAUN PILCHER RPEQ 14593| Brown Consulting (QLD) Pty Lt AND CROSS SECTIONS MD a LAKE DOONELLA NOOSA i aus Ee HE wm VERTEAL ©) N13078 7 (Fee faeans baa STAGE C1 - C6 Smart Conseelting ‘tunis in bin a ails Grey [ova women 19078-119 aa siF FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD Rinbene Corboun Wilbomrin Aychiny Cagwpone Gemetinecoet Lic 4064 ~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.