Original source · versioned page text
Engineering Drawings Part 1 - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Zz @® PROVIDE ‘SPILL THROUGH WEIR’ IN SEDIMENT IN ACCORDANCE WITH SILT FENCE DETAIL WITH GEOTEXTILE FABRIC TO BE WRAPPED AROUND STAR PICKET PLACED HORIZONTALLY APPROX. 400mm ABOVE FINISHED SURFACE FENCE. ‘SPILL THROUGH WEIR’ TO BE GENERALLY FILE: NIBO78-104.dwg DATE: 16-04-20% TIME: 08:19 Pxref's: X-NBOI8-TIT X-N33078-BASE X-NIBO78-ESC X-N13078-CONTOURS USR: nathan taylor REFER DRG N13078- 105_FOR CONTINUATION “ase ere 901 DETENTION BASINS TO BE UTILISED AS SEDIMENT BASINS DURING THE CONSTRUCTION PHASE DETENTION BASINS TO BE UTILISED AS SEDIMENT | BASINS DURING THE CONSTRUCTION PHASE N <-— <— <— <— <— + ¢€— —~/e ~ ~~ ec ec STAGE C1 LEGEND ry KERB INLET PROTECTION CONSTRUCTION PHASE 2 - & _ FIELD INLET PROTECTION ud CONSTRUCTION PHASE 2 - & TURF (2 STRIPS) BEHIND ALL KERB & CHANNEL AND WHERE SHOWN CONSTRUCTION PHASE 4& PROVIDE CLEAN WATER SWALE DRAINS TO DIVERT — > ~~ — UpsTREAM WATER AROUND SITE - REFER DETAIL. SEDIMENT FENCES CONSTRUCTION PHASE 1 - 4 60.0 PROPOSED FINISH SURFACE CONTOURS EXISTING SURFACE CONTOURS CONSTRUCTION ENTRANCE CONSTRUCTION PHASE 1 - 2 SEDIMENT CONTROL NOTES ALL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH “SOIL EROSION & SEDIMENT CONTROL - ENGINEERING GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES” (JUNE 1996). . APPROVED SEDIMENT CONTROL MEASURES MAY BE VARIED AFTER CONSULTATION WITH COUNCIL'S CONSTRUCTION ENGINEER, WHO MAY ALSO GIVE DIRECTION TO FURTHER REQUIREMENTS OF COUNCIL WITH REGARD TO THE EXTENT AND MAINTENANCE OF CONTROL MEASURES. . THE CONTRACTOR MAY BE REQUIRED TO INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES AS DESCRIBED IN QUDM 9.03.5 WHERE DIRECTED TO MINIMISE EROSION & DOWNSTREAM SEDIMENT TRANSPORT. . CONSTRUCTION ACTIVITIES SHALL BE PLANNED TO MINIMISE DISTURBANCE TO NATURAL VEGETATION COVER. . TOPSOILING AND GRASS SEEDING SHALL BE CARRIED OUT AS SOON AS POSSIBLE FOLLOWING FINAL TRIMMING OF ALLOTMENTS AND FOOTPATHS. . ALL SEDIMENT CONTROL STRUCTURES SHALL BE INSPECTED AFTER EACH RAINFALL EVENT FOR STRUCTURAL DAMAGE AND ALL TRAPPED SEDIMENT SHALL BE REMOVED TO A NOMINATED STOCKPILE SITE. - SEDIMENT TRAPS SHALL BE CLEANED OUT ON REACHING 50% STORAGE CAPACITY. RESERVOIR SEDIMENT IS TO BE SPREAD WITHIN THE DISTRUBED AREA OR WHERE DIRECTED. - THE CONTRACTOR SHALL ENSURE THAT EROSION AND SEDIMENT CONTROL MEASURES ARE MAINTAINED DURING THE ENTIRE CONSTRUCTION, MAINTENANCE & GRASS ESTABLISHMENT PERIOD. NOTE: ALL TREES OTHER THAN THOSE MARKED FOR POSSIBLE RETENTION WITHIN ROAD RESERVE AND SEWER EASEMENT TO BE REMOVED POSSIBLE TREE TO BE RETAINED (SUBJECT TO ARBORISTS REPORT). NOT TO BE REMOVED OR DAMAGED PRIOR TO SUPERINTENDENT'S INSTRUCTION TO DO SO. DENOTES TREE TO BE REMOVED AS A RESULT OF N CHANGES TO GROUND LEVELS. NOTE: REFER TO N13078-106 FOR SEDIMENT AND EROSION DETAILS. CONSTRUCTION PHASES PHASE No. DESCRIPTION CLEARING & BULK EARTHWORKS TRENCH EXCAVATION PAVEMENT CONSTRUCTION MAINTENANCE PERIOD OOOO FST 188UE TCALCS [DRAWN] _ DATE an AMENDMENT DETAILS. => @szmzozm: =] Sole] > DESIGN CHECK DRAWN CHECK "SCALE (METRES 7 "MIGROFIUM No, PROJECT No. N13078 SURVEYOR: RPS 1 INNOVATION PARKWAY, BIRTINYA Ph (07) 5436 7888 Fax (07) 5493 6630 "APPROVED. MATHEW HILL RPEQ 11578 “7e BRENT THOMAS RPEQ 7862 FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD SHAUN PILCHER RPE. 14593} ‘CLIENT QM PROPERTIES PROJECT LAKE DOONELLA NOOSA STAGE C1 - C6 BROWN Smart Consulting Eu & SEDIMENT AND EROSION CONTROL PLAN me ouing ey = SHEET 1 OF 3 ie Or ie OB ha Coats ‘DRAWING NUMBER. N13078. 104 Reibare Corburn Mibowe Myciy Shaepon GenntineCoes: = Lic 4064 ~
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.