Original source · versioned page text
Engineering Drawings Part 1 - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
REFER DRG _N13078-106 FOR CONTINUATION
NOTE:
REFER TO N13078-104 FOR SEDIMENT
AND EROSION NOTES AND LEGEND.
a
NOTE:
REFER TO N13078-106 FOR
N SEDIMENT AND EROSION DETAILS.
DETENTION BASINS TO BE
UTILISED AS SEDIMENT
BASINS DURING THE
CONSTRUCTION PHASE
Y /
)
| /
: l / 901
pa ACNTTOCHT AMBIT: ASE XABOTECESC XNDUTECONTOURS USR:Jstua Beddow REFER DRG N13078- 104 FOR CONTINUATION
Tar [ens [nw] One SORE METRES T TAROT We crew DRAWS TTT
AMENOMENT DETAILS DESIGN CHECK SURVEYOR: RPS a
~~ te A fan 1 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES q CONSULT AUSTRALIA SEDIMENT AND EROSION
ala Ph (07) 5436 7888 Fax (07) 5493 6630 wD CONTROL PLAN
ile DRAWN GHEGK| oe ——— ‘ PROJECT Wo ‘APOROVED SHAUN PILCHER REQ 14583 vl AKE DOONELLA NOOSA Brown Consuting (QLD) Pty Lid at SHEET 2 OF 3
Do >
NE N13078 jf orev non 0 Tt TAGE Ci Smart Consulting ‘wasn't ta = wa
SF FOR-& ON BEHALE OF BROWN CONSULTING fQLO) PTY LTO STAGE C1 - C6 Tate tee tows fey ane Bat N13078-105
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.