Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2015-10-13 Planning & Organisation Committee Agenda

of 110

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                          AGENDA


   Planning & Organisation
     Committee Meeting


             Tuesday, 13 October 2015


                    commencing at 1.30pm
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Joe Jurisevic (Chair), Noel Playford, Tony Wellington, Frank Wilkie




    “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2015-10-13 Planning & Organisation Committee Agenda(PDF, 10MB).pdf · 10.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 75 (of 110)

Section 2

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA           13 OCTOBER 2015


TABLE OF CONTENTS

ITEM                                                                     PAGE

ATTENDANCE & APOLOGIES                                                           -

PRESENTATIONS                                                                    -

PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                                    3

Planning & Environment                                                          3

1      STATE PLANNING REFORM - DRAFT PLANNING BILLS                              3

2      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR A
       DETACHED HOUSE AT 38 PARK CRESCENT, SUNSHINE BEACH - MCU15/0070          21

3      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR A
       SERVICE AND UTILITY TYPE 3 (TOWER) AT DAVIS ROAD, COOTHARABA
       (MCU15/0061)                                                             41

4      DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
       MULTIPLE HOUSING - TYPE 4 CONVENTIONAL FOR 16 UNITS AT 30-32
       DOONELLA STREET, TEWANTIN (MCU15/0053)                                   57

5      PLANNING & ENVIRONMENT COURT APPEAL D128/15 FOR A DEVELOPMENT
       APPLICATION FOR OPERATIONAL WORKS (CLEARING VEGETATION ) IN AN
       ENVIRONMENTAL COVENANT AREA AT 10 SERENITY CLOSE, NOOSA HEADS            84

6      WALLACE PARK FLYING FOX MANAGEMENT PLAN                                  91

7      OYSTER RECRUITMENT ASSESSMENT PROJECT                                    95

CORPORATE SERVICES DEPARTMENT REPORTS                                          100

ICT                                                                            100

8      UPDATE ON NOOSA COUNCIL'S INFORMATION COMMUNICATION
       TECHNOLOGY (ICT)                                                        100

Property and Facilities                                                        104

9      PROPOSED ASSIGNMENT OF SUNRISE NEIGHBOURHOOD SHOP 2 LEASE 2
       GRASSTREE CRT, SUNRISE BEACH                                            104

CLOSED SESSION                                                           106

10      KIN KIN QUARRY BREACH
       ACTION                                                                  106




                                                               Page 2 of 110

Section 3

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                              13 OCTOBER 2015


PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Planning & Development Sections only)

Planning & Environment
1                        STATE PLANNING REFORM - DRAFT PLANNING BILLS
DOCUMENT INFORM AT ION




Author                              Manager, Planning & Environment, Kerri Coyle
                                    Principal Strategic Planner, Rebecca Britton
                                    Infrastructure Assessment Coordinator, Oddbjorn Ludvigsen
                                    Planning & Infrastructure Department

Index                               ECM/Subject/Planning Instruments/State Planning

Attachments                         1.    Comments on Infrastructure Charges Provisions
                                    2.    Table of Feedback Sought on Proposed Options


EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by the Manager, Planning & Environment, Principal Strategic
Planner and Infrastructure Assessment Coordinator to the Planning & Organisation
Committee Meeting dated 13 October 2015 and make a submission to the Department of
Infrastructure, Local Government and Planning on the draft Planning Bills in accordance
with the following:
A.                        The Planning & Development Bill and Planning & Development Regulations are not
                          clear in the decision rules, particularly for those applications which conflict with the
                          planning scheme. It is considered that where an application conflicts with the
                          planning scheme, the onus of proof should be on the applicant to prove the merits of
                          the proposal and justify any inconsistencies. Further, clear grounds and/or reasons
                          should be required to be provided as part of the decision in order to ensure a
                          transparent, accountable development assessment system for the community;
B.                        The definition of material change of use should not be limited to only increases in
                          scale and density of the premises, as there are circumstances where reducing the
                          scale of the development does materially change the site’s use. This is particularly
                          relevant for developments which include an important community use or the like. For
                          example removing the nursing home component from a retirement village may have
                          a significant social impact on an area;
C.                        Case law on the SPA definition of ‘use’ makes it clear that secondary uses forming
                          part of a primary use must not only be incidental, but also necessarily associated
                          such that it would be impossible for the primary use to be carried out in the absence
                          of the incidental use. The definition proposed in the Bill related to ‘use’ fundamentally
                          expands the activities that may be carried out because secondary activities need not
                          be necessarily associated with the primary use to be considered part of that use and
                          as a result, lawful. The regulation and enforcement of activities that were not
                          contemplated as part of a development approval (although ancillary) may prove
                          problematic for councils and undermine local communities’ understanding of the
                          development process;




                                                                                                    Page 3 of 110

Section 4

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


D.     The removal of the requirement to consider whether a person may make a properly
       made submission objecting to change from the minor change test is likely to
       undermine the communities input into development assessment matters, particularly
       where they may be impacted upon by a proposed change;
E.     The Planning Bill maintains and extends the time frame for applicants to be able
       revive a development application where it lapses. This ability is not consistent with
       the principles for the DA Rules of being an applicant driven process, and is likely to
       create administrative problems for councils and lead to significant confusion for the
       community, particularly submitters;
F.     In the absence of demonstrable net benefit, no change is sought to the existing levels
       of assessment or the terms used (i.e. code and impact) in the new legislation;
G.     The proposed extension of Infrastructure Designation to privately owned
       infrastructure is a significant policy shift and would remove due consideration by the
       community, third party appeal rights and the need to comply with the planning
       scheme. Infrastructure charges revenue would be forfeited and would result in a
       considerable cost shift onto councils and their local communities. Statutory
       requirements around community infrastructure should at a minimum enable council to
       have a statutory role similar to a referral agency and allow consideration of local
       planning instruments in the designation process;
H.     Key process matters (including the development assessment process) should not be
       moved from the principal legislation and into subordinate legislation, given the
       potential negative outcomes for Councils and the broader community. The framework
       should be located in one statutory instrument to ensure genuine review processes
       cannot be expedited without due consultation and engagement;
I.     Attachment 1 of this report which includes comment on Draft Planning Bills
       provisions relating to Infrastructure Charges; and
J.     Attachment 2 of this report which includes feedback to the Department of
       Infrastructure, Local Government and Planning on the specific issues the Department
       requested comment on.


REPORT
On 10 September 2015 the Queensland Government released the draft planning bills for
public consultation. The draft bills are available and open for public comment until Friday 23
October 2015 and include:
   The Planning Bill which establishes the planning and development assessment system
   The Planning & Environment Court Bill which defines the establishment and operation
     of the Planning and Environment Court
   The Consequential and other Legislation Amendment Bill which includes numerous
     technical flow-on amendments to other acts that work in with the planning legislation.
While the legislation sets the general framework for planning in Queensland, the day-to-day
operation of the planning system is proposed to be governed by regulation and a set of
mandatory and non-mandatory instruments. The Department of Infrastructure Local
Government and Planning (DILGP) advises that the Department will consult on these
instruments after the Bills have been introduced to Parliament, but in the interim have
provided illustrative drafts. These include:
   Planning Regulation
   Process of making and amending local planning instruments
   Infrastructure Designation Guidelines
   Development Assessment Rules


                                                                               Page 4 of 110

Section 5

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


Notably, officers from DILGP have advised that the Shadow Minister’s three private
member’s Bills are expected to be considered by the Infrastructure, Planning and Natural
Resources Committee at the same time as the Bills proposed by the current Queensland
Government.

1.   Overview of Draft Bills
The Draft Bills do not propose to alter the fundamental way Queensland’s planning system
currently operates, but there are some noteworthy changes proposed. The Draft Bills are
similar to the previous consultation version seen in September 2014 and the version
introduced by the Shadow Minister in June 2015. A brief overview of the proposed changes
is detailed below.

Reducing the number of state planning instruments.
It is proposed that the number of state planning instruments be reduced from four to two.
The State Planning Regulatory Provisions and the Queensland Planning Provisions are to
be rolled into the Planning Regulation 2016, leaving the State Planning Policy and Regional
Plans as the only 'state planning instruments' under the Planning Bill 2015.

Development Assessment Rules
The most significant change proposed by the draft Planning Bill 2015 involves the way in
which a development is assessed.

The following concepts will be introduced under the proposed legislative framework:
   Exemption certificates may state that a development approval is not required for such
     assessable development. However, they may only be used under defined
     circumstances.
   The ability for applicants to choose to opt-out of an information request and therefore
     Council’s/state referral agencies may not make an information request.
   The ability for applicants to decide when to publicly notify a development application in
     the process such as before the information request or after a response is given to an
     information request.
   Introduce the ability for Councils to keep a list of persons (private consultants) who are
     appropriately qualified to be the assessment manager for development applications.
     The private consultant would then process and decide the application as the
     assessment manager.
   Introduce a ‘variation request’ as a development application for a preliminary approval
     that seeks to vary the effect of a planning scheme for a premise. This is likely to be
     typically used for larger scale developments and the approval would specify the codes
     that apply and the assessment type for the ‘downstream’ application.
   The ability for applicants to ‘stop-the-clock’ at any time once a development application
     is properly made as many times as required for a cumulative period of up to 6 months
     or further if agreed by the assessment manager. For example the applicant may stop
     the clock during the decision period to change the proposed development to respond
     to submitter’s issues or provide a flood study that was requested in Council’s
     information request.
   The ability for applicants to revive their development application which would have
     otherwise lapsed (grace period extended from 5 business days under the Sustainable
     Planning Act 2009 to 20 business days under the draft Development Assessment
     Rules)



                                                                                Page 5 of 110

Section 6

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


   Assessment benchmarks being new terminology for matters that a development will be
     assessed against such as planning scheme code.
   Categorising instrument being new terminology for regulations and planning schemes
     which identify the development category such as accepted, assessable or prohibited
     and include a Regulation or a Planning Scheme.
Further, the draft Planning Bill proposes the introduction of three categories of assessment:
1.     Accepted: includes all developments other than assessable or prohibited
       developments. The accepted category is effectively a combination of the exempt and
       self-assessable categories under the Sustainable Planning Act 2009.
2.     Assessable: applies to developments which can only be carried out with a
       development approval. Additionally, subject to the feedback in the public submission
       period, the code/impact assessment categories may be changed to standard/merit
       assessment.
3.     Prohibited: is a development where no application can be made.
The time frames throughout the proposed development assessment process have been
generally moved to the Development Assessment Rules and are reduced, with the exception
of public notification including:
   The assessment manager will have 20 business days to assess a code assessable
     application and give the decision notice and 30 business days for an impact
     assessable application.
   Change to the decision time frame for extension applications from 30 business days to
     20 business days to decide the application, with an additional 5 days to provide the
     decision notice to the relevant parties.
   A public notification period of at least 30 business days for development applications
     that seek to vary a planning scheme and at least 15 business days for all other
     development applications that require public notification.
Notably the current draft Regulation proposes the standard requirements for giving public
notice to include giving notice to adjoining owners of land, placing notice on the land, giving
notice to the Council who must keep a register of all development applications requiring
public notification.

Longer Currency Periods but No More ‘Roll Forward’
The currency periods for development approvals are proposed to be extended:
   Material Change of Use Development Approval: is extended from four to six years.
    Reconfiguring a Lot Development Approval (without works): is extended from two to
      four years.
Together with these changes it is also proposed to remove the rolling currency period
provisions for related approvals where the relevant period would have been taken to have
started on the last day the latest related approval took effect. The removal of the ‘roll
forward’ provisions is an improvement on the current SPA provisions which could in theory
enable a development approval to remain current for 20 years and are overly complex in
tracking and advising on the lapsing date of an approval.

Removal of the term 'permissible change' and amendment to minor change test
Under the Draft Bills the term 'minor change' now applies to both changes to development
applications and development approvals. However the term takes on a slightly different
meaning depending on the circumstances. The Draft Bills also provide scope for approvals
to be changed if the change is not minor.


                                                                                Page 6 of 110

Section 7

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           13 OCTOBER 2015


The test for a minor change to a development approval has also been amended to remove
the requirement to consider whether a person may make a properly made submission
objecting to the change. Instead the test will be mainly limited to whether the proposed
change is for a substantially different development. This undesirably limits the ability for
communities to have input into development matters.

Establishment of the Development Tribunal

The Building and Development Dispute Resolution Committee is to be replaced by the
Development Tribunal. The Draft Bills establish the jurisdiction of the Development Tribunal
and Planning and Environment Court and sets out how appeals are commenced in each.
Under the draft Bill the number of matters a Development Tribunal may hear an appeal for
have expanded to now include:
    conditions of a development approval for a building classified under the Building Code
      as a class 2 building (multiple dwellings) and the premise is not more than 3 storey
      and 60 sole occupancy units.

Restricting the discretionary factors relevant to the awarding of costs in the Planning
and Environment Court.

The current discretionary cost provisions of the Sustainable Planning Act 2009 are to be
restricted and it is proposed that the concept of each party bearing their own costs in
Planning and Environment Court litigation be reintroduced. Parties will be liable for costs
where the proceedings have been initiated for an improper purpose or are considered to be
vexatious or frivolous.

Compensation provisions for planning scheme changes for managing natural hazard
risks

The compensation provisions for managing risks associated with natural hazards have been
removed in place of changes that provide for compensation to be based upon certain criteria
being met before a council would be liable.

Provisions relating to Infrastructure Charges

A number of matters have been identified by the Infrastructure Assessment Coordinator
relating to the Draft Bills provisions relating to Infrastructure Charges. These are outlined in
Attachment 1.

2.    Feedback Sought on Proposed Options

There are number of areas highlighted in the Planning Bill which the Government is seeking
feedback on, either comments or identification of a preferred option. These areas include:
    the advancing of the Draft Bills' purpose;
    local government compensation arrangements in relation to natural hazards;
    the terms to be used when classifying development;
    the decision rules related to standard/code assessment;
    a possible additional infrastructure provision; and
    transitional provisions.

These have been summarised in Attachment 2. It is suggested that Council’s submission
also address these areas broadly in line with the comments included in Attachment 2.




                                                                                 Page 7 of 110

Section 8

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   13 OCTOBER 2015


3.    Council’s Previous Submission

The table below details whether the current Bills have addressed the issues previously
raised in Council’s submission.

Council’s Previous Submission                            Comment

A. The Planning & Development Bill and Planning          The draft Bill has not carried forward the
& Development Regulations are not clear in the           existing statutory rules of SPA that preclude
decision rules, particularly for those applications      approval of a development application where it
which conflict with the planning scheme. It is           would conflict with a relevant State or Local
considered that where an application conflicts with      Planning Instrument, in the absence of
the planning scheme, the onus of proof should be         sufficient grounds. There is no requirement to
on the applicant to prove the merits of the proposal     articulate the reasons an application is
and justify any inconsistencies;                         approved contrary to planning scheme
                                                         provisions.

B. The Planning & Development Bill includes a            The draft Bill has been amended to allow the
clause that allows a regulation to prescribe the         use of alternate assessment managers to be
assessment manager for a development                     solely at a local government’s discretion. This
application as any person from a class of persons        is important to ensure that the new planning
who have stated qualifications or characteristics. It    legislative framework continues to empower
is unclear whether this will result in an additional     local government as the responsible entity
class of private entities (chosen by the Minister)       immediately responsible for integrated land use
being identified as assessment managers in place         planning, management and development
of councils for particular applications. This is of      assessment.
significant concern as experience has
demonstrated that private building certification has
not always been successful in implementing
planning scheme requirements. This is particularly
important for any operational works applications
that include works which are to become a public
asset and be maintained at ratepayers expense;

C. The Planning & Environment Court Bill                 The draft Bill has been amended to return to
maintains the specific criteria for making a costs       the former costs provisions of SPA, with parties
order introduced with the Sustainable Planning and       only liable for costs where the proceedings
other Legislation Amendment Bill 2012. These             have been initiated for an improper purpose or
rules do not serve the public interest of enabling       are considered to be vexatious or frivolous.
the community, submitters, local governments and
developers to dispute planning decisions due to the
risk and uncertainty of the Court awarding costs
against them. The previous Court powers to award
costs in circumstances where cases were frivolous
or vexatious or instituted primarily to delay or
obstruct are considered sufficient protections from
abuse of the system;

D. The definition of material change of use should       The draft Bill has not amended the definition of
not be limited to only increases in scale and density    material change of use and is limited to only
of the premises, as there are circumstances where        increases in scale and density of the premises.
reducing the scale of the development does
materially change the site’s use. This is particularly
relevant for developments which include an
important community use or the like. For example
removing the nursing home component from a
retirement village may have a significant social
impact on an area;



                                                                                          Page 8 of 110

Section 9

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    13 OCTOBER 2015



Council’s Previous Submission                            Comment

E. The Planning & Development Bill maintains and         The draft Bill maintains the revival provisions,
extends the time frame for applicants to be able         with the draft Development Assessment Rules
revive a development application where it lapses.        indicating that applicants will be able to revive
This ability is not consistent with the principles for   their application for a period of up to 20
the DA Rules of being an applicant driven process,       business days.
and is likely to create administrative problems for
Councils and lead to significant confusion for the
community, particularly submitters

F. As Noosa Council values community                     The draft Bill has been amended slightly to
engagement in its planning and development               require applications that seek to vary a planning
decisions, we have concerns regarding changes            scheme to be advertised for a minimum of 30
that may serve to inhibit, obstruct or minimise          business days and 15 business days for all
resident input. Reductions in public notification        other applications that require public
periods and removal of existing requirements for         notification.
notices to be placed in local newspapers are thus
                                                         Currently under SPA applications are required
not supported and there should be a minimum
                                                         to be advertised for 15 business days and 30
notification period for applications of 20 business
                                                         business days for those applications that have
days. We also have concerns about the proposal
                                                         3 or more state referral agencies or if a
that an applicant may choose to publicly notify a
                                                         preliminary approval is sought overriding the
development application as early as 5 days after
                                                         planning scheme.
the development application is properly made. We
believe submitters are better served under the           The draft Decision Rules requires applicants to
current arrangement where public notification is         publicly notify their application by placement of
able to occur following the information request          a sign on the property and letters to adjoining
period                                                   owners, but Council’s may also require public
                                                         notice in a newspaper.




G. Noosa Council has long enjoyed a locally              Concerns still stand but will best be resolved
popular planning scheme that is in part premised         through the review process for the SEQ
on studies and deliberations concerning the ideal        regional plan.
carrying capacity for our shire. We have concerns
that the Queensland Planning Reform Process may
herald arbitrary enlargements of the Urban
Footprints within the Noosa Shire area

H. Noosa Council does not support proposed               The Bill proposes to extend Infrastructure
changes relating to Community Infrastructure             Designations to private-owned infrastructure
designation that will remove local government            (eg aged care, education and sports facilities)
powers to designate infrastructure. Nor do we            where currently restricted to public-owned
support the proposal for the State Planning Minister     infrastructure. This is a significant policy shift
to be the sole designating Minister for Infrastructure   and would remove due consideration by the
Designation in Queensland and to thus choose             community, third party appeal rights and the
what developments can proceed, be they public or         need to comply with the planning scheme.
private infrastructure, and have them exempt from        Infrastructure charges revenue would be
planning scheme requirements and from                    forfeited and would result in a considerable cost
infrastructure charges; and                              shift onto councils and their local communities.
                                                         Statutory requirements around community
                                                         infrastructure should at a minimum enable
                                                         council to have a statutory role similar to a
                                                         referral agency and allow consideration of local
                                                         planning instruments in the designation
                                                         process.




                                                                                           Page 9 of 110

Section 10

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  13 OCTOBER 2015



Council’s Previous Submission                           Comment

I. The maximum infrastructure charges prescribed        Has not been addressed.
by legislation remain unchanged since being
introduced in 2011. Infrastructure charges have
dropped in real terms due to indexation not being
applied. This prohibits councils from making
charges that reflect the actual current costs of
building infrastructure. Thus the proportional costs
of public infrastructure related to new development
are being met by the community. Meanwhile the
State Government adds 3.5% annual indexation to
its own fees and charges. Noosa Council thus
requests that annual automatic indexation of the
current maximum capped charges be introduced to
reflect increasing costs of providing infrastructure.


Previous Council Consideration
Council first considered the proposed Planning & Development Bill and Planning &
Environment Court Bill 2014 in September 2014 (prior to them being introduced to
Parliament) and requested the Chief Executive Officer make a submission to the draft Bills.
Then, at its meeting of 15 January 2015 Council considered a report on Queensland
planning reform including the Planning and Development Bill.
Ordinary Meeting 15 January, 2015, Item 1, Page 3
That Council note the report by the Principal Strategic Planner and the Manager, Planning &
Environment to the General Committee dated 12 January 2015 and request the Chief
Executive Officer to make a submission to the Dept of State Development, Infrastructure and
Planning regarding the following points:
A.    The Planning & Development Bill and Planning & Development Regulations are not
      clear in the decision rules, particularly for those applications which conflict with the
      planning scheme. It is considered that where an application conflicts with the planning
      scheme, the onus of proof should be on the applicant to prove the merits of the
      proposal and justify any inconsistencies;
B.    The Planning & Development Bill includes a clause that allows a regulation to
      prescribe the assessment manager for a development application as any person from
      a class of persons who have stated qualifications or characteristics. It is unclear
      whether this will result in an additional class of private entities (chosen by the Minister)
      being identified as assessment managers in place of councils for particular
      applications. This is of significant concern as experience has demonstrated that private
      building certification has not always been successful in implementing planning scheme
      requirements. This is particularly important for any operational works applications that
      include works which are to become a public asset and be maintained at ratepayers
      expense;
C.    The Planning & Environment Court Bill maintains the specific criteria for making a
      costs order introduced with the Sustainable Planning and other Legislation
      Amendment Bill 2012. These rules do not serve the public interest of enabling the
      community, submitters, local governments and developers to dispute planning
      decisions due to the risk and uncertainty of the Court awarding costs against them.
      The previous Court powers to award costs in circumstances where cases were
      frivolous or vexatious or instituted primarily to delay or obstruct are considered
      sufficient protections from abuse of the system;



                                                                                     Page 10 of 110

Section 11

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           13 OCTOBER 2015


D.   The definition of material change of use should not be limited to only increases in scale
     and density of the premises, as there are circumstances where reducing the scale of
     the development does materially change the site’s use. This is particularly relevant for
     developments which include an important community use or the like. For example
     removing the nursing home component from a retirement village may have a
     significant social impact on an area;
E.   The Planning & Development Bill maintains and extends the time frame for applicants
     to be able revive a development application where it lapses. This ability is not
     consistent with the principles for the DA Rules of being an applicant driven process,
     and is likely to create administrative problems for Councils and lead to significant
     confusion for the community, particularly submitters.
F.   As Noosa Council values community engagement in its planning and development
     decisions, we have concerns regarding changes that may serve to inhibit, obstruct or
     minimise resident input. Reductions in public notification periods and removal of
     existing requirements for notices to be placed in local newspapers are thus not
     supported and there should be a minimum notification period for applications of 20
     business days. We also have concerns about the proposal that an applicant may
     choose to publicly notify a development application as early as 5 days after the
     development application is properly made. We believe submitters are better served
     under the current arrangement where public notification is able to occur following the
     information request period;
G.   Noosa Council has long enjoyed a locally popular planning scheme that is in part
     premised on studies and deliberations concerning the ideal carrying capacity for our
     shire. We have concerns that the Queensland Planning Reform Process may herald
     arbitrary enlargements of the Urban Footprints within the Noosa Shire area;
H.   Noosa Council does not support proposed changes relating to Community
     Infrastructure designation that will remove local government powers to designate
     infrastructure. Nor do we support the proposal for the State Planning Minister to be the
     sole designating Minister for Infrastructure Designation in Queensland and to thus
     choose what developments can proceed, be they public or private infrastructure, and
     have them exempt from planning scheme requirements and from infrastructure
     charges; and
I.   The maximum infrastructure charges prescribed by legislation remain unchanged
     since being introduced in 2011. Infrastructure charges have dropped in real terms due
     to indexation not being applied. This prohibits councils from making charges that
     reflect the actual current costs of building infrastructure. Thus the proportional costs of
     public infrastructure related to new development are being met by the community.
     Meanwhile the State Government adds 3.5% annual indexation to its own fees and
     charges. Noosa Council thus requests that annual automatic indexation of the current
     maximum capped charges be introduced to reflect increasing costs of providing
     infrastructure.

Ordinary Meeting 2 July 2015, Item 2, Page 10
That Council note the report by the Principal Strategic Planner to the General Committee
Meeting dated 29 June 2015 and authorise the Chief Executive Officer to:
A.   Make a submission to the Infrastructure, Planning and Natural Resources
     Parliamentary Committee on:
     1.    the Planning and Development (Planning for Prosperity) Bill 2015;
     2.    the Planning and Development (Planning for Prosperity - Consequential
           Amendments) and Other Legislation Amendment Bill 2015; and


                                                                                Page 11 of 110

Section 12

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  13 OCTOBER 2015


        3.     the Planning and Development (Planning Court) Bill 2015;
        with that submission to be based on Council’s previous submission in January 2015 on
        the earlier versions of those Bills; and
B.      Make a submission to the Department of Infrastructure, Local Government and
        Planning in response to the Better Planning for Queensland Directions Paper in
        accordance with the issues outlined in Attachment 2 of this report.

Finance & Risk

Nil

Consultation

External Consultation - Community & Stakeholder

The Manager, Planning & Environment, Principal Strategic Planners, Infrastructure
Assessment Coordinator and Development Officers have attended a Departmental
workshop on the draft Planning Bills. Officers will also participate in LGAQ workshops.

Internal Consultation

Nil

Departments/Sections Consulted:

      Community Services                      x   Planning & Infrastructure
      Disaster Management & Public Order          Building & Plumbing Services
      Waste & Environmental Health            x   DA Planning
      Community Facilities                    x   Strategic Land Use Planning
      Cultural Facilities                         Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

      Executive Office                            Corporate Services
      Community Engagement                        Finance
      Customer Service                            ICT
      Executive Support                           Procurement & Fleet
      Governance                                  Property & Facilities
      Human Resources                             Revenue Services




                                                                                     Page 12 of 110

Section 13

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         13 OCTOBER 2015


                                                                      ATTACHMENT 1

Review of Draft Planning Bill 2015_Chapter 4 Infrastructure
Part 2 Provisions for local governments
Clause 110 Regulation prescribing charges: Item (2)&(3): and
Clause 112 Contents—general: Item (4)(b)(ii) & (5)
  Indexation is an ongoing issue since the Minister has not changed the maximum amount
  since its introduction in June 2011 yet costs for providing infrastructure have continually
  increased and offsets for trunk infrastructure are subjected to actual costs.
  Also, the proposal should a change to the charge ever occur, is convoluted and over
  complicated. The maximum charges per the SPRP or new Regulation should simply be
  applied from a base date and then simply indexed by an appropriate ABS QLD index
  such as CPI or Road & Bridge index from the base date to the date of issue and to the
  date payment is made.
  Normal indexation of contributions/charges has been standard practice in the past for
  many years both in government & in private industry contracts.
  This issue has been raised to the State on many previous occasions with no rectification
  to date (i.e. the Community is further subsidising development in this regard).
Clause 111 Adopting charges by resolution
  Item (3)(a) – Concern is raised on potential legal implications in changing from: “land” to
  “premises”.
  Item (3)(c) - Appears to be simply changing the legislation location where charges don’t
  apply to designated land i.e. SPA 205 however, the wording could have additional
  consequences where charges may now not apply as it could possibly be also designating
  a department rather just relating to the land?
Clause 117 When charge may be levied and recovered
  Item (3)(b) - Should change 10 days to 20 days so as to match (c) & (d) & (8)(b)for
  consistency.
  Item (12)(b) – A charge is often not paid by an applicant who may be just acting for a
  client and having no further involvement in the development from when an approval may
  be given. Also for recovery, a charge is a Rate whereby payment is ultimately obtained
  from the owner of the land. This has the potential to cause additional difficulty should
  recovery action have to be taken.
  Suggest change to: is payable by a payer with the ultimate responsibility for payment
  lying with the land owner. (refer to definition of payer in Schedule 1).
  Item (12)(c) – Concern is raised on potential legal implications in changing from: attaches
  to the “land” to “premises”;
  i.e. per section 142 (1) A levied charge is, for the purpose of its recovery, taken to be
  rates of the local government that levied the charge. Where a Rate is a charge against
  the Land & not a premises refer Local Government Act 2009 clause 93.




                                                                             Page 13 of 110

Section 14

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             13 OCTOBER 2015


Clause 118 Limitation of levied charge
  Item (3)(a) – A previous use that is no longer taking place may not have previously paid
  or contributed to all the current networks that now apply today i.e. typically for all transport
  or stormwater networks. This should be changed so that that a previous use that no
  longer exists, will only be credited for those networks to which they have previously
  contributed to.
  Item (3)(b)(i)&(ii) - Concern is raised on potential legal implications in changing from:
  “land” to “premises”.
Clause 119 Requirements for infrastructure charges notice
  Item (1)(c) Concern is raised on potential legal implications in changing from: “land” to
  “premises”.
  Item (2) – Could be difficult to know when or when not to apply this. An applicant won’t
  know whether trunk infrastructure will be conditioned in the original approval so will still
  cause difficulties in the first instance. How offsets & refunds are to be applied should all
  be stated in resolutions.
  Suggest changing (1)(f) & delete (2) to:
  (f) whether an offset or refund under this part applies and, if so, information about the
  offset or refund, including when the refund will be given may follow once details have
  been fully determined.
  Item (3) – Changing the term from an “information” to “decision” notice is inappropriate as
  this term relates specifically to the development approval itself. Should therefore remain
  as an “information” notice as that is what it actually is in order to avoid any confusion.
Clause 123 Representations about infrastructure charges
  Item (6) – Should change 5 days to 10 days for consistency with (3) & other sections for
  consistency.
Clause 126 Necessary infrastructure conditions
  Item (2)(b) - The issue remains in that any necessary infrastructure condition is
  automatically considered as “trunk” and thereby is fully off-settable under clause 127
  even though it may be primarily required for the development itself.
Clause 127 Offset or refund requirements
  Refer also to comment to Clause 126 item (2)(b)
  There are situations where necessary conditions are primarily required for the
  development itself & therefore such offsets should just apply that amount that can be
  apportioned to other users and not the full cost. It is not equitable or fair & reasonable
  that Local Governments (i.e. the community) should have to bear full costs to facilitate
  individual development’s needs.
  Item (4) –the latest time proposed is simply not workable & also may not be equitable to
  either Development or Local Government depending on the specific scenario that arises.
  Also LGIP provision dates may be stated over a period (i.e. 2011–2016).rather than a
  specific date so then which date should it be? (i.e. 2011 or 2016?)
  Possible Scenario 1:
  The LGIP infrastructure proposed date is say 2016 and the construction start date &
  completion by the developer is later say 2025. Then under this proposal, the refund would
  need to be given immediately before the infrastructure is even provided. This is totally
  unacceptable & unequitable for Local Gov’t.



                                                                                 Page 14 of 110

Section 15

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            13 OCTOBER 2015


  Possible Scenario 2 (reverse of 1):
  The LGIP infrastructure proposed date is say 2025 and the construction start &
  completion date by the developer is earlier say 2016. Then under this proposal, the
  refund would only need to be given by 2025 some 9 years after provision & would be
  unequitable for the developer.
  The timing of refunds should be left to individual LG resolutions to cater for their particular
  circumstances and ability.
Clause 132 Refund if development in PIA
  Item (2)(a) - Why should any refund apply if the development exceeds the scale of
  development from that assumed in the LGIP per clause 130 (2)(b). This is inequitable to
  Local Government where the development is not complying with Planning Schemes,
  LGIP’s & the integrity of the infrastructure planning statutory guidelines.
  Item (2)(b) – How can this be the subject of a charge when the charge is not directly
  linked to the cost of infrastructure & cannot change the maximum allowable charge to
  include this cost?
Clause 136 Application of this subdivision
  Still disagree with concept of Conversion applications as PIP’s/LGIP’s approved by State
  details all that is Trunk for the period in question & any development outside should
  provide additional infrastructure that is specifically required for it to proceed should be
  fully undertaken by the development at its cost & not subsidised by the community.
Clause 137 Application to convert infrastructure to trunk infrastructure
  Item (2) – whilst the time for making such applications is proposed to be limited to 1 year,
  it still creates bureaucratic duplication of additional work for Local Government at a later
  time. All this should be undertaken through representations during the normal negotiation
  stage process.
Clause 138 Deciding conversion application
  As per clause 137 comment


Clause 139 Notice of decision
  Item 139 (1) – As for comment to 119 Item (3) – Changing the term from a “notice ” to
  “decision” notice is inappropriate as this term relates specifically to the development
  approval itself. The wording should therefore remain simply as a “notice” to avoid any
  confusion.
Clause 140 Effect of and action after conversion
  As per clause137 comment
  Item (5) – Incorrect cross-reference to 248 that has no relevance to this section (i.e.
  refers to Enforcement notices in Part 4 Appeals to P&E Court)


Part 4 Infrastructure agreements
Clause 150 Content of infrastructure agreement; and
Clause 153 When infrastructure agreement binds successors in title
  Concern is raised on potential legal implications in changing from: “land” to “premises”.




                                                                                Page 15 of 110

Section 16

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         13 OCTOBER 2015


Chapter 6 Dispute resolution
Part 3 Appeals to tribunal, Item 242 Conversion applications; and
Part 4 Appeals to P&E Court, Item 253 Conversion applications:
  Item (1) – The conversion application has already undergone the assessment process
  under Local Government resolutions as governed by State regulation. A decision under
  this process should therefore be binding and not subject to further appeal. Furthermore,
  the clause provides an open ended avenue of appeal as there are no grounds provided
  on the basis for making such an appeal against the refusal that has already followed due
  process.


Chapter 8 Transitional provisions and repeal
Clause 320 Infrastructure charges notices
  Item (2) – The statement “before or after” is confusing & unclear.
  •   if a notice relates to an approval that is changed or extended before the old act is
      repealed then surely it has already been finalised under the old Act & should
      continue to apply under 320 Item (1) & Item 321.
  •   Only “after” should apply to Item (2)
Clause 321 Levied charges
  Item (2) – Ok but should change “after 3 July 2014” to “from 4 July 2014” for simplicity &
  consistency in referencing the stated legislative date.
Clause 323 Infrastructure charges resolutions
  Item (1) appears a bit confusing as a PIP is also taken to be a LGIP under the old act.
  Item (4)(b) - The date for having a LGIP has been automatically extended to 1 July 2018
  without the need for an application to the Minister to extend.
  Suggest proposed amendment to SPA in “Local Government and Other Legislation
  Amendment Bill” is also changed to match this bill for consistency & simplicity.
Clause 326 Infrastructure conditions—change or extension approval
  Item (5) – The statement “ before or after” is confusing & unclear.
  •   if a notice relates to an approval that is changed or extended before the old act is
      repealed then surely it has already been finalised under the old Act & should
      continue to apply under 320 Item (1) & Item 321.
  •   Only “after” should apply to Item (5)




                                                                             Page 16 of 110

Section 17

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    13 OCTOBER 2015
                                                                                  ATTACHMENT 2
Government Seeks Feedback on the following                  Comment
options
Purpose of the Act                                          Support the inclusion of concepts relating to
                                                            inter-generational equity, precautionary
The following is an extract from the Draft Bill of the      principle and sustainable use of resources.
proposed purpose of the Act:-                               The alternative purpose here provides a more
(1)      The purpose of this Act is to facilitate           encompassing and balanced approach to
         ecologically sustainable development that          defining the acts purpose and is supported
         balances—                                          over the Draft Bill’s purpose.
         (a) the protection of ecological processes
         and natural systems at local, regional, State,
         and wider levels; and
         (b) economic growth; and
         (c) the maintenance of the cultural,
         economic, physical and social wellbeing of
         people and communities.
(2)      The purpose is to be achieved through an
         efficient, effective, transparent, integrated
         and accountable system for—
         (a) land use planning (planning); and
         (b) development assessment.
(3)      The system for achieving the purpose of this
Act includes—
         (a) State planning policies (including
         temporary ones) setting out planning and
         development assessment policies about
         matters of State interest; and …

Both IPA and SPA include similar sections (s1.2.2 in
IPA and s 4 in SPA) describing how the Act’s
purposes are to be advanced. Feedback is sought
on the proposed purpose and whether the following
kind of provisions should be also included to build on
this purpose.
(a)      following decision-making processes that—
         (i)      are accountable, transparent,
                  coordinated, effective and efficient;
                  and
         (ii)     take account of short and long-term
         environmental effects of development at
         local, regional, State and wider levels; and
         (iii)    apply the precautionary principle,
                  namely that the lack of full scientific
                  certainty is not a reason for delaying
                  taking a measure to prevent
                  degradation of the environment if
                  there are threats of serious or
                  irreversible environmental damage;
                  and
         (iv)     seek to provide for equity between
         present and future generations; and
(b)      providing opportunities for the community to
         be involved in making decisions; and
(c)      considering the sustainable use of
         renewable and non-renewable natural
         resources, including biological, energy,
         extractive, land and water resources that
         contribute to economic development through
         employment creation and wealth generation;



                                                                                         Page 17 of 110

Section 18

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  13 OCTOBER 2015


           and
(d)        considering housing choice and diversity,
           and economic diversity; and
(e)        considering supplying infrastructure in a
           coordinated, efficient and orderly way; and
(f)        considering amenity, conservation, energy
           use, health and safety in the built
           environment in ways that are cost-effective
           and of public benefit;
(g)        considering ways of minimising the adverse
           environmental effects of development (like
           climate change, urban congestion and
           declining human health).

Compensation Arrangements                                It is agreed that compensation provisions
                                                         should be removed where planning schemes
Under the draft Bill, compensation to land owners        are made or amended to manage risks
due to changes in planning schemes relating to           associated with natural hazards, including
reducing risks to persons or property form natural       flood, bushfire, landslide, storm tide
events would not be payable. However, such               inundation and coastal erosion. The new
changes would require Council’s to first prepare a       legislation should make it clear that
report assessing the matter including feasible           compensation rights should only be preserved
alternatives for reducing the risk.                      where an applicant can prove they have
                                                         suffered an immediate and demonstrable loss
An alternative approach is one similar to the current    relating to the continuing use of land for
arrangement under the Sustainable Planning Act           existing lawful purposes and not the
2009 where Council’s are open to compensation for        speculative possibility of future development
all changes to planning scheme which reduces the         for some other purpose. The superseded
value of interest in land. Under the current             planning scheme provisions are considered
arrangements Council’s either agree to pay               adequate for proponents to act on a
compensation or seek to reduce the risk through          development proposal in accordance with the
conditions imposed on future development                 planning scheme that was in affect prior to the
approvals.                                               change. Thus it is considered onerous to
                                                         require councils to prepare risk assessment
                                                         reports that assess feasibility alternatives for
                                                         reducing risk as part of imposing conditions on
                                                         development approvals.

                                                         Ideally, the planning scheme should deal with
                                                         natural hazard risks upfront at the planning
                                                         stage and it should then be for the applicant to
                                                         demonstrate how the natural hazard risks can
                                                         be appropriately managed as part of the
                                                         development application in accordance with
                                                         the scheme provisions.

Terms Used for Classifying Development                   There is no perceived value in changing the
                                                         names of assessment categories from code
There are currently two categories proposed for          and impact to standard and merit. There is no
assessable development (development for which a          legal obligation to change the name of the
development approval is required) including:-            categories just because the new legislation
                                                         treats and defines the categories somewhat
         Standard/Code                                 differently. The practical intent of the
         Merit/Impact                                  categories remains largely unchanged and
                                                         therefore the names should remain
Feedback is sought on the names of assessment            unchanged. This would avoid unnecessary
categories that should be used (i.e. either Standard     effort and expense that would arise to correct
or Code)                                                 planning scheme and supporting DA
                                                         information.




                                                                                       Page 18 of 110

Section 19

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    13 OCTOBER 2015


Decision rules for Standard/Code Applications             There is no clear preference for the decision
                                                          rules for standard/code applications and it is
Feedback is sought on the decision rules for              considered that both options require reworking
Standard/Code Assessable Applications.                    to be satisfactory. Notably, option 2 as
                                                          proposed most closely aligns with the current
Option 1                                                  SPA provisions.
‘(2)    To the extent [standard/code?] assessment
        is required for the development, after            For standard/code assessment applications
        carrying out the assessment, the                  assessment of development proposals should
        assessment manager—                               be ‘bounded’ and only undertaken against
        (a)      must decide to approve the               applicable planning requirements rather than
                 application to the extent the            the whole of the planning scheme. It is also
                 development complies with the            appropriate that there is a presumption for
                 assessment benchmarks for the            code assessable development to be in favour
                 development; and                         of approval. This is consistent with the
        (b)      may impose development conditions        drafting of The Noosa Plan, with only
                 on any approval; and                     particular codes identified as relevant for code
        (c)      may, to the extent the development       assessable applications. Development which
                 does not comply with the                 is identified as consistent with the zoning
                 assessment benchmarks, decide to         intent is also only code assessable. However,
                 refuse the application only if           for any development that is not consistent with
                 compliance can not be achieved by        the planning scheme, clear grounds should be
                 imposing development conditions.         required to be articulated.
‘(3)    Nothing stops the assessment manager
        approving a development application that
        does not comply with some or all of the
        assessment benchmarks for the
        development.

Option 2
‘(2)    To the extent [standard/code?] assessment
        is required for the development, after
        carrying out the assessment, the
        assessment manager must decide—
        (a)      to approve all or part of the
        application; or
        (b)      to approve all or part of the
                 application, but impose development
                 conditions on the approval; or
        (c)      refuse the application.


Infrastructure                                            The latest time proposed is simply not
                                                          workable & also may not be equitable to either
Feedback is sought on whether the following               Development or Local Government depending
provision should be included.                             on the specific scenario that arises. Also
                                                          LGIP provision dates may be stated over a
(4)     If the LGIP identifies the infrastructure, the    period (i.e. 2011–2016).rather than a specific
        local government must pay the refund under        date so then which date should it be?? (i.e.
        subsection (3)(b) no later than the               2011 or 2016??)
        construction date for the infrastructure stated
        in the LGIP.                                      Possible Scenario 1:
                                                          The LGIP infrastructure proposed date is say
                                                          2016 and the construction start date &
                                                          completion by the developer is later say 2025.
                                                          Then under this proposal, the refund would
                                                          need to be given immediately before the
                                                          infrastructure is even provided. This is totally
                                                          unacceptable & unequitable for Local Gov’t.
                                                          Possible Scenario 2 (reverse of 1):



                                                                                         Page 19 of 110

Section 20

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    13 OCTOBER 2015


                                                          The LGIP infrastructure proposed date is say
                                                          2025 and the construction start & completion
                                                          date by the developer is later say 2016. Then
                                                          under this proposal, the refund would only
                                                          need to be given by 2025 some 9 years after
                                                          provision & would be unequitable for the
                                                          developer.

                                                          The timing of refunds should be left to
                                                          individual LG resolutions to cater for their
                                                          particular circumstances and ability.

Arrangements for Transitioning                            Generally The Noosa Plan is currently drafted
                                                          in a manner that should allow easy transition
Feedback is sought about the arrangements for             under the proposed Bill’s assessment and
transitioning assessments by local governments            decision rules.
using local planning instruments from the
Sustainable Planning Act 2009 to the Bill. These
assessments would include all assessments for
development made assessable under local planning
instruments, and assessments carried out by local
governments for development made assessable
under the regulation (such as for reconfiguring a lot).

Merit assessment rules and processes under the Bill
are very similar to impact assessment rules and
processes under the old Act. So, a transition from
impact assessment to merit/impact assessment
under this section should be relatively
straightforward.

Section 56 includes options for decision rules for
standard/code assessment. These options are
intended to provide for some flexibility to balance
competing or conflicting assessment benchmarks, or
conflicts between referral responses and
assessment benchmarks, but unlike merit
assessment do not provide for assessment against,
or having regard to, matters not prescribed under a
regulation.

Feedback is sought on whether all code
assessments under the old Act are suitable to
transition immediately to standard/code
assessments under this section, or whether
transitional arrangements such as interim
assessment and decision rules would be desirable.




                                                                                         Page 20 of 110

Section 21

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     13 OCTOBER 2015


2                        DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR A
                         DETACHED HOUSE AT 38 PARK CRESCENT, SUNSHINE BEACH - MCU15/0070
DOCUMENT INFORM AT ION




Author                           Development Planner, Glen Conforti
                                 Planning & Infrastructure Department

Index                            ECM / Application / MCU15/0070

Attachments                      1.   Proposal Plans



         APPLICATION DETAILS

         Applicant                          JE Jamieson, NE Jamieson

         Proposal                           Development Permit for Material Change of Use of Premises -
                                            Detached House

         Properly Made Date                 30 July 2015

         Information Request Date           14 August 2015

         Information Response               9 September 2015
         Date

         Decision Due Date                  22 October 2015

         PROPERTY DETAILS

         Property Address                   38 Park Crescent Sunshine Beach Qld 4567

         RP Description                     Lot 598 RP 48112

         Land Area                          532m²

         Existing Use of Land               Vacant land (dwelling demolished)

         STATUTORY DETAILS

         SEQRP Designation                  Urban Footprint

         Locality                           Eastern Beaches

         Zone                               Attached Housing zone

         Overlays                           Natural Hazards Overlay – Low Potential Acid Sulfate Soils
                                            Natural Hazards Overlay – Landslide Hazard
                                            Natural Hazards Overlay – Medium Bushfire Hazard
                                            Natural Resources Overlay – Coastal Protection

         Assessment Type                    Code



                                                                                          Page 21 of 110

Section 22

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              13 OCTOBER 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 13 October 2015 regarding Application No. MCU15/0070 for a
Development Permit for Material Change of Use (detached house) situated at 38 Park
Crescent, Sunshine Beach and issue a Preliminary Approval in accordance with the
following conditions:
     PLANNING
     Preliminary Approval
1.   Prior to the issue of a Development Permit, the Site Cover of the detached house must
     be reduced to a maximum of 35%.
     When Conditions must be Complied With
2.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
     prior to the use commencing, and then compliance maintained at all times while the
     use continues.
     Approved Plans
3.   Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The plans must be amended to comply with
     Condition 1 of this Decision Notice prior to the plans becoming approved plans. The
     plans to be amended are listed in the following table unless otherwise amended by
     these conditions.

      Plan No.   Rev.   Plan/Document Name                                         Date

      DD 1.2     B      Site plan, prepared by Sparks Architects                   01.09.15

      DD 1.3     B      Roof Plan, prepared by Sparks Architects                   01.09.15

      DD 1.4     B      Bedroom Mezzanine, prepared by Sparks Architects           01.09.15

      DD 1.5     B      Ground Floor Plan, prepared by Sparks Architects           01.09.15

      DD 1.6     B      Lower Ground Floor, prepared by Sparks Architects          01.09.15

      DD 1.7     B      Pool Terrace Floor Plan, prepared by Sparks Architects     01.09.15

      DD 2.1     B      North West Elevation, prepared by Sparks Architects        01.09.15
      DD 2.2     B      North East Elevation, prepared by Sparks Architects        01.09.15

      DD 2.3     B      South East Elevation, prepared by Sparks Architects        01.09.15

      DD 2.4     B      South West Elevation, prepared by Sparks Architects        01.09.15
      DD 3.1     B      Section A, prepared by Sparks Architects                   01.09.15

      DD 3.2     B      Section B, prepared by Sparks Architects                   01.09.15

      DD 3.3     B      Section C, prepared by Sparks Architects                   01.09.15
      DD 3.4     B      Section D, prepared by Sparks Architects                   01.09.15

     Building Height
4.   The maximum height of the development must not exceed 12 metres above the
     finished ground level and the natural ground surface and 3 storeys.




                                                                                 Page 22 of 110

Section 23

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         13 OCTOBER 2015


5.    Certification must be submitted to Council from a Licensed Surveyor which certifies
      that the building does not exceed the maximum height requirement of this Decision
      Notice.
      Performance Bond
6.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
      must be submitted to Council, to secure performance of all conditions of this approval,
      prior to the issue of a Development Permit for Building Works. The cash bond or
      trading bank guarantee will be returned on performance of the conditions of approval
      less any costs incurred by Council in respect of enforcing performance of this permit.
      Council reserves the right to call upon the bond or guaranteed sum to effect
      compliance with conditions.
      Privacy
7.    A screening device must be erected for the full length of the southern side of the
      Ground Floor Deck. The screening device must be of a height to maintain
      neighbouring residents’ amenity.
      Landscaping
8.    The retaining wall and associated screening fence/wall (faced with hardwood timber)
      located near the southern boundary must be:
      a.   setback 1.5m up to 4.5m in height
      b.   setback 2m between 4.5m – 7.5m in height.
9.    A minimum of 20% of the site must be retained as soft landscaping.
10.   Screening vegetation must be planted for the full length of both side boundaries in
      accordance with Council’s Planning Scheme Policy PSP3 Landscaping Plants and
      Guidelines. The planted vegetation must have a minimum pot size of 200mm and
      consist of native, endemic species with a mature height of not less than 8 metres and
      a maximum spacing of 2 metre centres.
11.   A mix of native landscaping including ground covers, shrubs and trees must be
      provided for minimum width of 5m from the rear boundary (adjoining the pathway). In
      this regard landscaping must also be provided between the swimming pool and the
      rear boundary. Landscaping must be in accordance with Council’s Planning Scheme
      Policy PSP3 Landscaping Plants and Guidelines.
      Coastal Protection
12.   External colours and finishes of the building must comprise muted/environmental tones
      that blend with the natural environment.
      ENGINEERING
      Property Access and Driveways
13.   A sealed access driveway must be provided from Park Crescent to the proposed
      carparking. The driveway must be designed and constructed in accordance with
      Council’s standards drawing SEQ R-050 and to grades that prevent vehicles from
      scraping and/or bottoming whilst also allowing pedestrians movements along the
      footpath without any step or level difference. Should any driveways be constructed to
      grades that do not comply with Council’s standard drawing SEQ R-050 and AS/NZS
      2890.1-2004, Council will require that the driveway be removed and reconstructed to
      levels that do comply.




                                                                             Page 23 of 110

Section 24

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         13 OCTOBER 2015


      Stormwater Drainage
14.   Stormwater runoff from the development must be either discharged to Council’s
      existing kerb and channel in Park Crescent and/or disposed of on-site without causing
      scour or damage to the subject site or any adjoining property.
      Geotechnical Stability
15.   All works must be carried out in accordance with the recommendations contained in
      the submitted Geotechnical Investigation prepared by Soil Surveys, Project No.115-
      17158 dated April 2015.
16.   Certification must be submitted to Council which certifies that the development has
      been constructed in accordance with the recommendations contained in the submitted
      Geotechnical Investigation prepared by Soil Surveys Project No.115-17158 dated April
      2015 and that the development has a minimum factor of safety against landslip of 1.5
      in the long term. All certification must be prepared by a Geotechnical Engineer and
      must be addressed to Noosa Council. Where a member of an engineering company,
      certification must be by the engineering company or an appropriate officer or employee
      of the engineering company on behalf of the company
      Earthworks and Retaining Walls
17.   Earthworks required on site must be carried out in accordance with Council’s Planning
      Scheme Policy PSP5 – Engineering Design Standards so as not to cause the
      additional ponding of water on any adjoining lands or the blockage of, or interference
      with, any natural watercourses.
18.   The use of vibratory equipment of any kind is not permitted to be used (including
      vibrating rollers and the use of vibrating installation techniques for sheet piling and
      other construction vibrations caused by excavating, earthmoving or demolition
      machinery or other similar construction techniques) unless approved and supervised
      by a Certified Geotechnical Engineer. Under such circumstances the operator of such
      equipment must at all times comply with the directions of the Geotechnical Engineer.
19.   The excavation of the site and the construction of the proposed works must not have
      any adverse effects on the stability of adjoining buildings and/or structures and/or
      services and/or lands. In this respect, a Registered Professional Engineer Queensland
      must supervise the excavation of the site and the construction of the new works to
      determine whether any additional measures are required to protect the stability of
      adjoining buildings and/or structures and/or services and/or lands.
      Damage to Services and Assets
20.   Any damage caused to existing services and assets as a result of the development
      works must be repaired at no cost to the asset owner at the following times:
      a.   where the damage would cause a hazard to pedestrian or vehicle safety,
           immediately; or
      b.   where otherwise, upon completion of the works associated with the
           development.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.
Advisory Notes
      PLANNING
      Development Compliance Inspection
21.   Prior to the commencement of the use, please contact Council's DA Planning Section
      to arrange a Development Compliance Inspection.


                                                                             Page 24 of 110

Section 25

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           13 OCTOBER 2015


      Qualified Person
22.   For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
      stability for the development, a qualified person is considered to be a person who:
      a.   is a Registered Professional Engineer of Queensland (RPEQ); and
      b.   has a degree in civil engineering or engineering geology; and
      c.   has a minimum of 5 years’ experience in the field of geotechnical engineering or
           engineering geology.


REPORT
1.    PROPOSAL
The application seeks approval for a detached house that exceeds building height in metres
and storeys in the Attached Housing zone and seeks front and side setback relaxations.
The proposal is for a 3 storey, 12 metre high detached house. The proposal consists of a
master bedroom on the upper most floor (mezzanine level), kitchen and living areas and a
large balcony on the ground floor level (street level). Bedrooms and bathrooms are located
on the lower ground floor and a semi open undercroft area and pool deck on the lowest floor
overlooking a swimming pool. The vehicle accommodation is located near the front
boundary.
An architectural rendering of the proposed detached house is shown in Figure 1 below.




                Figure 1 – Architectural rendering from the north and south


                                                                              Page 25 of 110

Section 26

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         13 OCTOBER 2015


The proposal is before Council because it is a 3 storey detached house and does not comply
with the relevant setbacks for a detached house in the Attached Housing zone.
2.   SITE DETAILS
2.1. Site Description
The site slopes from the west (street frontage) to the eastern or rear boundary which adjoins
a walkway to the beach. The site slopes steeply from the road frontage for approximately
half to three quarters of the length of the site then generally levels off to meet the rear
boundary. (Refer to Figure 2 below)




                          Figure 2 – Subject Site outlined in purple


                                                                             Page 26 of 110

Section 27

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


2.2. Surrounding Land Uses
Immediately adjoining the site to the north and south are detached houses and to the rear a
walkway to the beach. Opposite the site are a variety of 3 storey unit complexes which are
characteristic of development along Park Crescent and the nearby Crank Street, except for 9
detached housing lots to the south of the site which directly adjoin the dunes. Figure 3 below
shows the subject site outlined in green, the Attached Housing zone (unit complex zone) in
red and Detached Housing zone in light pink.




Figure 3 – Zone map showing the zoning surrounding the site. Attached Housing zone is
depicted in red where the majority is developed as unit complexes and Detached Housing in
light pink where detached houses exist.

3.   ASSESSMENT
3.1. State and Other Statutory Instruments
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.




                                                                              Page 27 of 110

Section 28

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  13 OCTOBER 2015


3.2. Statutory Instruments – Planning Scheme
The subject site is located in the Eastern Beaches Locality and is zoned Attached Housing.
The proposed detached house is identified as a consistent use within the zone and is self -
assessable when complying with the Acceptable Solutions of the Detached House Code.
The proposal is subject to the Detached House Code. The Probable Solutions of the
Detached House Code require houses to not exceed a building height of 2 storeys and 8m.
The Code also requires setbacks for a detached house to be in accordance with those
outlined in Schedule 1 setbacks for the appropriate zoning. The proposal is located in the
Attached Housing zone where various Planning Scheme provisions exist for the different
residential development. Table 1 below outlines building height, setback, site cover and
gross floor area provisions for residential uses in the Attached Housing zone.
Table 1 – Planning Scheme Requirements

Planning Scheme requirements for residential uses in the Attached Housing zone (Sunshine Beach)

                  Detached House      Duplex                    Units (3 or         Proposal
                                                                more)

Building height   8m                  12m                       12m                 12m
in metres
                                                                                    (complies with
                                                                                    duplex and units)

Building height   2 storeys           3 storeys                 3 storeys           3 storeys
in storeys                                                                          (complies with
                                                                                    duplex and units)

Setbacks          6m front and rear   1.5m up to 4.5m in        6m front and        7m front boundary
                  boundaries          height                    rear boundaries     (carport is approx.
                                                                                    1m).
                  Half the building   2m up to 7.5m in height   Half the
                  height for side                               building height     7.2m rear
                                      2m plus 0.5m for every
                  boundaries –                                  for side
                                      3m above 7.5m                                 3.15m side
                  5/6m                                          boundaries –
                                                                5/6m                (complies with
                                                                                    duplex provisions)

Site Cover        40%                 35%                       35%                 40%

Gross Floor       Not Applicable      0.6:1                     0.6:1               0.62:1
Area (GFA)

The proposal does not comply with building height and setbacks for a detached house in the
Attached Housing zone. On the other hand the proposal does comply with building height
and setbacks if it were a duplex.
The proposal is subject to the Detached House Code and is assessed against the relevant
provisions for setbacks and building height and is set out below.
Setbacks
Specific Outcome O1
O1    Buildings and other structures are appropriately designed and sited to—
      a)     provide amenity for users of the premises as well as preserve the visual and acoustic
             privacy of adjoining and nearby land uses;
      b)     preserve any existing vegetation that will buffer the proposed building from adjoining
             uses;


                                                                                     Page 28 of 110

Section 29

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             13 OCTOBER 2015


      c)    allow for landscaping to be provided between buildings;
      d)    maintain the visual continuity and pattern of buildings and landscape elements within
            the street;
      e)    for class 10a structures, do not visually dominate the street;
      f)    avoid any significant adverse impacts on the natural values of waterways and their
            foreshores, including those of the Noosa River and its lakes; and
      g)    do not interrupt the natural cycles of erosion and accretion of waterways and foreshore
            areas.
Main building
The main building (excluding the carport) meets the required 6m front and rear setback
provision but the house requires half its building height for the side setbacks. This equates to
a 5-6m setback to the side boundaries.
The proposed main building has a 7m front setback, a 7.2m rear setbacks and 3.15m to
each side boundary.
Although a 5m to 6m setback is required to the side boundaries by the Code, the proposed
3.15m side setback provides sufficient area for separation to neighbouring properties and
adequate space for landscaping to provide a buffer between the neighbouring uses. Directly
opposite the site and the surrounding area are large bulky 3 storey/12m high unit complexes
which have setbacks similar to or less than that proposed. It is considered the proposal
maintains the visual continuity and pattern of established building setbacks on the beach
side of Park Crescent and the existing unit complexes in the Attached Housing zone that
surround the site.
The rear deck on the ground floor level has the potential to overlook neighbouring properties.
A condition could be imposed to ensure a screening device is erected and plantings are
provided along southern side boundary to provide privacy to the residents and neighbours.
Carport
Most lots on the seaward side of Park Crescent are steeply sloping with the majority of
garages having front and side setbacks similar to the proposed carport. The proposal allows
for landscaping along the majority of the carports length to screen and soften any impacts.
The carport maintains the visual continuity and established character for vehicle
accommodation along the seaward side of Park Crescent.
Retaining wall - front yard
A retaining wall and feature hardwood wall for the entry courtyard is proposed to be setback
1m from the southern boundary. The retaining wall varies in height from ground level to
approximately 2.6m high but the associated screening hardwood wall will increase the height
to approximately 4m or greater above the natural ground level. Although landscaping is
proposed to screen the wall, it is considered it should be setback to comply with the relevant
setback requirements. A condition could be imposed to ensure the structure complies with
the setback provisions.
Building height in storeys and metres
Detached houses in the Attached Housing zone are required to have a maximum building
height of 2 storeys and 8m. The proposal is 3 storeys and 12m and therefore is subject to
Specific Outcome O8 of the Detached House Code which is shown below:
Height
O8 Buildings and other structures—
      a)    are low rise and present a building height consistent with structures on adjoining and
            surrounding land;




                                                                                  Page 29 of 110

Section 30

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               13 OCTOBER 2015


     b)    have a maximum building height of—
           i) for Visitor Mixed Use Zone— 3 storeys; or
           ii) if in the Noosa Heads Locality Attached Housing Zone—
                   • Lot 4 on SP100064 in Serenity Close Noosa Heads— 4 storeys
                   • Otherwise— 3 storeys
           iii)    if in the Noosaville Locality and the Attached Housing Zone with frontage to the
                   following streets: - Russell St, William St and Howard St, or Weyba Rd, James St
                   and Albert St north of their intersections with Elizabeth St (as well as properties
                   fronting Gympie Terrace or Noosa Parade between Weyba Road and Russell
                   Street)— 3 storeys;
           iv) otherwise– 2 storeys;
     c)    do not visually dominate the street, surrounding spaces or the existing skyline;
     d)    preserve the amenity of surrounding land including privacy, views and access to
           sunlight;
     e)    respect the scale of surrounding vegetation; and
     f)    respond to the topography of the site by stepping down the slope or sitting above the
           ground level on stumps, for sloping sites.
A small portion of the proposed roof is approximately the same height (varies from equal
height to 1.3m lower) as the northern neighbour’s roof, but is higher than the southern
neighbour’s roof (approx. 4m higher). Notably, these two 2 storey detached houses on
adjoining sites have development potential of 3 storeys and 12m for a duplex or unit
complex. Given the extent of 3 storey and 12m development in the surrounding area and 1
of the neighbouring properties is a similar height; the proposal presents a building height
consistent with structures in the surrounding area.
However, the proposed site cover (building footprint) of 40% exceeds that of other 3 storey,
12m high development in the surrounding area where site cover is only 35%. In Sunshine
Beach, The Noosa Plan and previous planning schemes required a reduced building
footprint in lieu of additional building height. For example, a 2 storey, 8m high development
is permitted 40% site cover, whereas a 3 storey, 12m high development is permitted only
35% site cover.
Although the proposal is well designed, it is considered the proposed building height
combined with 40% site cover results in a scale of development that has the potential to
dominate the seaward side of Park Crescent. Notably the adjoining properties have
development potential for a duplex or units which are subject to 35% site cover. In terms of
development potential for the subject site the proposal would generally comply with the
provisions for a duplex on site if the site cover was reduced to 35%.
Substantial excavation is required near Park Crescent for the subsurface portion of the
house. There are some built form elements which respond to the site’s topography, such as
the stepped roof form, the upper level mezzanine and the ground floor is split level. The
proposal’s habitable spaces sit above an open undercroft area supported by masonry walls.
Generally, the proposal has been designed to maximise views and generally responds to the
sites topography. Figure 4 below depicts the proposed development, the sites topography
and the 12m height limit.




                                                                                    Page 30 of 110

Section 31

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015




Figure 4 – Proposal showing the undercroft design and a 12m height blanket which reflects
                                 the sites topogarphy.
Overlay Provisions
The following overlay codes are applicable to this application:
Natural Resources Overlay Code

The site is affected by the Natural Resources Overlay being an identified Coastal Protection
Area. The Coastal Protection Overlay provisions include a 5m wide landscaped area
consisting of a mix of native plant species that protect the dune system and the character of
the beachfront. A 6m setback from the seaward boundary is required for buildings and
structures on properties that adjoin the beachfront or a reserve fronting the beachfront.

The site is approximately 40m along a pathway from the existing coastal dune and the pool
is proposed to be setback 4.59m from the rear boundary. Technically, the property does not
adjoin the beachfront or a reserve adjoining the beachfront. Notwithstanding the above, the
building is setback 7.2m which meets the required 6m setback and the proposed 4.59m
setback for the pool is sufficient to provide landscaping to protect the character of the area
and the dune, meeting the intent of the Code.




                                                                              Page 31 of 110

Section 32

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                13 OCTOBER 2015


4.     CONSULTATION
4.1. Other Referrals
The application was forwarded to Unitywater and the following internal Council specialists:
     Development Engineer
5.     CONCLUSION
Building height and setbacks of the proposed 3 storey, 12m high detached house do not
comply with the Probable Solutions of the Detached House Code. The proposed setbacks
and the physical building height are consistent with buildings and structures in the
surrounding area. However, the proposed building height combined with 40% site cover
results in a development of a scale not consistent with other 3 storey 12m high development
in the surrounding area where a site cover of only 35% exists. The proposal in its current
form has the potential to dominate the seaward side of Park Crescent and is not
recommended to be supported. When site cover is reduced to 35%, the proposal would be
commensurate with other 3 storey, 12m high development in the area and is considered to
meet the relevant Specific Outcomes of The Noosa Plan. Therefore a Preliminary Approval
is recommended only with a condition to reduce the site cover to 35%.

Departments/Sections Consulted:

     Community Services                     X   Planning & Infrastructure
     Disaster Management & Public Order         Building & Plumbing Services
     Waste & Environmental Health               DA Planning
     Community Facilities                       Strategic Land Use Planning
     Cultural Facilities                        Asset Design & Investigations
                                                Asset Planning
                                                Civil Operations
                                                Environment

     Executive Office                           Corporate Services
     Community Engagement                       Finance
     Customer Service                           ICT
     Executive Support                          Procurement & Fleet
     Governance                                 Property & Facilities
     Human Resources                            Revenue Services




                                                                                   Page 32 of 110

Section 33

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 33 of 110

ATTACHMENT 1
                                                                                                                                                                                                    Jate     i   4     detail
\                                                                                                                                                                                        |B [01.09.15 |       PO | Development Approval
                            A                                                            B)                                                      c                                 D                          (E)                                                                             (F
                             T                                                                                                                    T                                 T                           T                                                                               ~
                             |                                                              °                                                     |                                 |                                                                ¢
                             |                                                                                                                    |                                 |
                             |                                                                                                                    |                                 |
                             |                                                                                                                    |                                 |                                                                                                                                                     Zz                 :
                             |                                                                                                                    |                                 |                                        Toor                                                                                       custom folded eaves gutter-          /              -
  3                 Stet                              FE                   aE           aa                                                        Tr                                         Ze                                      :                          Cte                                                                        fe
       ek         F        \               [     ri NIL                       E>                                                                  |                                 |        ]                                              3        Se a5                                    a                7           Dips btcte                    <S   pice
                            \                 a               aC                   se                                                                                                                                    |                     BS          IN Nese                                                    f         ey    &     4)                      |
                   {wt                                                                                                                                                                                                   \                           \                                                                           sts            hig
                             \                               |                           fe                                                                             sd iH)      |                 Sh                 |                   '                                                                                     8             /               :  t    ‘
                    i        |                               |                                                                                .                     AN)                 ao                                             ch                                                                         4                          cot             fy
(1)                                                          }             }      a                                               t           1                                                                on        |                  3f&            | et                                                      :       .
  Y                                                          |                  ee                                                                i                                                           fii ei               sn        Ee       Si                                                fe   eas            -        ;           PAF
          &)                                                                              we            |                                  I      kt                                                                                                                                                                                                              &
                                                                               \                 ag                                                                                                              I
             :                               decom bet                         ;          Fey
                                                                                               a                                                                                                                  Ee                                                                            i                                                                 —
                      |                                                        1                     -4                                 7,        |                                 |                            |                                                                                                                                 é
                                                                                          Y                                              |                                                                                                                                                                                                                          |
                      |                                                        Peau)                                          Eu                                                    |                                   |                                                                                                                       i
                      !                                                        |                         |                     mol                                                  !                            |                                                                                                                              !                   |
                                                                               |                        }                                         |                                 {                            |                                                                                                                           :        :
                                           a                  Sia           =!                                                                                                                                                                                                                                                                 :
(2)                  Ses          A pe       E                = “Ee                     |                  |_FFL 29420 |                   I      |                                 }        a >                 |                                      deck below                                 1.           J      i                               1            |
                    i Ai         Vea                                Bol        |                                                           !      |                                 |                            —                                                                                                                                                  |
                   el                    a                                                                              —                                                           3                                 |                                                                                                                                             i
                         ‘2a      eal                                      LeUEP                                                                                                                                 ;
                      {      she                                               }  A                        st                   robe            |                                                                                                                                                                                                                   |
                         oP                   entry    cou                        ar                                                           1!                                   |                            |
                      Wife                                                {|   }                     |                  |                                                           2                                                                                                                                                                               |
                                              !                                1) root                          ens?                |)          I                                                                ;                                                                                                                                                   R
                               |                                           |   }letow Pl                          ae                              |                                                                                                                                                                                                         a
                      |        i        |                                      }          1  lee)             FFL 2 420                         \                                                                     |                                                                                                                                             |
  ~                              | I                                          Ls                }         ve | —{ve                 +}                                              t                            t
     \                               1  pape          8   et      tl        A              =                           =          -               =]                                                            ;                                                                                        aia                a
                                            ie                                              -                                                     |                     Ai                    Ko                                                             b
                      |                      t               A                             on                                                                           +s
                      1       iss           cs               ‘|            |                 A                                                       Lo                                  Sans                    4                                         Z                                                                     on
                      Y\ |  as              te           c             UU                                                                     tn                       >            LN              SF                                  :                      =         SS                                                     legend
                      Dk                SRT              oe      ee            ee         BY          |                                             WWD        7     i              ia      S        A]              ss                PA       bs                   c                          yt                                                                      |
                           SAS                  =   b         ie              te    eI        aR                       me           ede Ak                          f                   V           VS                                                 Wig"                   S        5                                        CONC.EA    Concrete exposed aggrega
                         (—                                   =                                        at               iL         NT     SSS                                          A             S                                                   .       =                                                              Bt          balustrade type 1
                            Rae          NZ                32    e             BS   oe    ee                           Sea                                                              (7       IX                            ¢          Dig                    ORS                                      -                             ar
                      LM              ZI               Sehr      an |  BS     TRE ea              Sales     AF bog               RT)                     SALMON                                       2                I    SWAY POST                                              eae,               LOO                     bp      _ someee_
                    28.0 |   |            25.0                     240                23.0                22.0               210             D   aoe                    0           |      180                  17.0                  16.0       SS               B                       15.05           °                     5                aia
                                                                                                                                                     re                                                                                       i        S             <                                                wink                  shot edge decking
                                                                                                                                                                                                                                                    \                                                                                        shower
                             |                                                                                                                    |                                 |                                                               .                                                                                       Serato
                             |                                                                                                                    |                                 |                                                                                                                                           His        tongue and groove
                                                                                                                                                                                                                                                                                                                                           vanity basin
                             |                                                                                                                    |                                 |                                                                                                                                           refer to schedules for details          |
                             |                                                                                                                    |                                 |                                                                                                                                           NOTE: all structural elements; inctuding all |
                                                                                                                                                                                                                                                                                                                                slabs, columns, beams, footings and
                                                                                                                                                                                                                                                                                                                                framing: o be in accordance with engineer's
                                                                                                                                                                                                                                                                                                                                design and detail
                             |                                                                                                                    |                                 |                                                                                                                                           NOTE: all landscaping elements and
                                                                                                                                                                                                                                                        4                                                                       planting types and description to be in
                                                                                                                                                  |                                                                                                  &                                                                               aoa                Architects
                                                                     -              aeenee              ,                              Jamieson Residence                                                                                                                         Scale 1:100            nun.              rc                                     ~~
,    spar ks           architects                                                           .                                          38 Park Crescent Sunshine Beach                                   John and Ngaio Jamieson                        083        PO             Bedroom Mezzanine Plan                                        0D 1.4        |    @ /’
     :                                                                              Rs orchhes     fees                                project                                                           client                                         job no       drawn        drawing                                                       dwg no               -           ‘
                                                                                                                                                                                                                   Page             33       of      110

Section 34

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 34 of 110

[rev]   date  [issued | detail                                                                                        J
        \                                                                                                                                                   B | 01.09.15)  PO   | Development Approval                                                                           Development Approval
                             (A )                                             B )                                        (c                           D                    ( E )                                                          ( F )
                              Co                   AK 900K 800K 8000                                                                                                      EK                              ADDY
                               |                                               | °                                         |                          |                      |                           °
                                                                                                                                                                                                          NY
                               |                                               |                                           |                          |                      |
                               |                                               |                                           |                          |                      |
                               |                                               |                                           |                          |                      |                                                                                               z            l            -
                               |                                               |                                           |                          |                      |             von               \ i)                   —\\j                    S              VES              1
                                                                                                                            48°22"                          ‘ihe boundary            wht      &           SW                    :                            Mies       |         20}
              ea      F PTT       instore | |!  |                   SE       i                                             Tass                     T        [               |         >         a    WA Ke                              4            L,       y      NS Aleka 0 N           yo} ~S
             Lk         M4                                         ee             —                                             ee                      SS                                        ee    SS                 Sop  Se                  SE
          7  jeen         \gete |) FFL 26120] | sod          e%,,  Apel                                                    |      y                   {                      |                      ce         |     ee             -        ‘         YOU",    ARS EASE
                       ra                      SS Se                                                                                                                                                     C/N       “oF         +     3                               SN                       .
             Sig =                                                             2                                           |                    1»    hr  Ry                 |                               [kK                            \                   as     8            Sf     SN
 grated drain to     “8        |            2 a                                p                                             ~>-----}-- aby -p -1---                         |                     tng                                                                 Lf                      a
  front of carport                                    7      les                                                                         AW,                   =a                              eS          bang                                         ye      AN             ‘            i
                a                        SaaS                               LA                     st | pantry             I          kitchen                                                                                                                        :                         :
                we             |                  carport                      mw                       Tas                              =                                                                                                  1
                  V                                CONC.ST                                                                           =                                                                                                                                                           7
                         losses                                                ES                                                                                                                                                           |                                       at
             a                 i (en                                                      ee                                                                            +  tte                                                                                                       .          Re
             =           44         WI}                                        pee                                         |                                            A                                                                                                         op            Bs
                               | a Se                                                                                                                                                                                                                                            48
                         |                            ja                                                                   i                                                                                                                                                    .       Z
                         !     |                 {_ FFL 27 000               Ys       |           S|                       |                          |                      |                                                                                                 i
         Ty.                        a.                   sag                                                                                                                                                                                                                    ta *              |
         2}           ane         ee       planter & trellis 5rd         tite                                              !         T&G              |                      f                                      SED                                                             ;             —
        f         |   SNZal       Boas ee                Tay                                    lobby                           living/dining                           t                                       deck 1                                      ae                     %
                      “     Py    By A71h                    “onl                               :                          |   (_FFL26 000 |          |                 .    |                                 (FFL 25640 |                                                                       ;
                      Be              TZ                   at       nT 8 Oo                                                1                                                                                                                                                                       s
                   -  >       1                   |       TT                             pope            Wf     st         |                          |                      |                                                                                                                    l3
                    4, 13     a                                         aut                 Z                              !                                               |                                                                i                                                     |
             2          i      q                  an      “             ae                 {ve}                            |                          }                  |   {I
             8           rina                         iscaped|           {py                                                                                            |
             ~           1    it                  _FFL25 980 |              |  —                                           |                          |                HI
                                 i          !                                            }       entry                     |                                                                                                                                                                    OS
                               | i                                             I        7          T&G                                                t                      |
                         UL                                                    p=                                                                                                                                                                                                      r          >!
        (3)      4.      |   .      4         prada         4         Lo         Mh                                               ————                                          ————————————                                                 et   ie   a          ET  el                         }
                                          he            i)                      wt                                                                                                                                                                                                                ;
                       a!     .            fre(feature  *                |      Uy                                         |            AT                  Ost              {                                 L                                                                                  |
                       ee                               |                       7                                                                         SP                                                  &
                       Se ay              is          dil       LU               a                                       <-       ah      eH          LAN        Pgh              \|         .                 Vas                                                  wed
                       SUA                BA        ee a a ee                                                           Ss       h/t     he            ys           Fi       iN               Bay     >      2         SS                      Ms         \            gen
                       “ans       SLY Rast               Ri Rat, Wel Se RS                             wh           J         WD     N\A  Ni             Zz          S             .        Piss,          |" Sah                          .          Y                                              |
                          CRC                          OE              PEE        SLY    tenet               |  Ye                AYN    Pin          |  GINS                                            Wit                 NZ                                      Becca    SaktatO NO cegae
                         Hea Se                       SL             Se PSY                          oo Aer                       Se                            ,                      EC       y      NWS BIN                    5                _      .              °
                         RS           ZS                                                                     NS               ee                     LUVIN                        | SY        aS                                 eat       Le | oR                            Ee
lade fence - Hwo1      28:0, jf           8.08   |          28d        :  23.             22.0             210         Na gory               0        |    189 Pounsery      170              160 a                 ee                 15.0%                         5        a sce eeking
                               |                                               |                                           |                          |                      |                          “                                                            sn       behaved cladding type t
                                                                                                                                                                                                                                                                     sR      ‘smooth render
                                                                                                                                                                                                                                                                   ST         store
                               |                                               |                                           |                          |                      |                                                                                       ¢        Son
                               |                                               |                                           |                          |                      |                                                                                      refer to schedules for details   |
                                                                                                                                                                                                                                                                     NOTE: all structural elements; including all |
                               |                                               |                                           |                          |                      |                                                                                       slabs, columns, beams, footings and
                                                                                                                                                                                                                                                                     framing; to be in accordance with engineer's
                                                                                                                                                                                                                                                                    design and detail
                               |                                               |                                           |                          |                      |                                                                                       NOTE: all landscaping elements and
                                                                                                                                                                                                            J                                                        planting types and description to be in
                                                                                                                                                                                                                                                                               nd des
                               |                                               |                                           |                          |                                                   &                                                          ounedeo            Architects
            -                                                             a6 Se           fence                   Jamieson Residence                                                                                           Scale 1:100      wuut__J~_L__J                                  —
        {  spar ks architects                                                me                                   38 Park Crescent Sunshine Beach                      John and Ngaio Jamieson             083       PO         Ground Floor Plan                                DD15       {   of   }
                                                                          ms orchtwcts pry. Rd, abn 80 124 6187  project                                               client                              job no.    drawn     drawing                                          dwg no.          a
                                                                                                                                                                              Page 34 of T10

Section 35

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 35 of 110

(                                                                                                      Estates ae       details
                                                                                                        HB -[01.09.15] PO [Development Approval                                              Development Approval )
                A                                 B)                             (C)                (0)               E                                           (F)
                Co                80K 900K 8                                                         KK    8000      EK                     OD
                 |                                 °                               |                  |               |                    °                       |
                                                                                                                                            QY
                 |                                 |                               |                  |               |                                            |
                 |                                 |                               |                  |               |                                            |                       .
                 |                                 |                               |                  |               |                                            I)                     /zE         \      _
                                                                                                                                                                                           A         .
                                                                                                                                                                \    IA                    =        i 4
                                                                                                                                                                \\  f/f)         _       / =   ——     !   LDP
                                                                              ihe.           2, —       S poncery — |: fecal 2 “Gta:          Wp    gpd              === an Ma Lag
                 |                                 |                               |                     NVA          |         aw             )            ~—\\f 4            SL AES                 I
                                             eco et             KU en                                  ANT          TF       on "998 OIIN               |     ANS         Abe    DIS PRS IT Pht
                                                EZ                                           1          AI                   é         ‘J Sane               fo A _F            De Dine          VS          ~
                                             pS                 PUTT TT eT TT                  [  Lay ip K         LY |       _     je     7 (K    eR,    ane       YN         L / 2 & x) Mee ae ml. |
                                                                                                 p             LL               mo                    re     Beef. |             /  Sk       oh      Fea.
          5                                                                        |           K ar iGaeyaays                                 NS                   \poe se TSS             OS        NN
          8S                                                 deck 2                            (               SZ RA                      ;                         MR           -  A wy        IH    Daw
                                                               SED                 |           yp |                  {|              aes                           |     Se       ¢       A Ket       f%
                                                                                  =p | - — 4     RS - 5     SANS - PEA          Ne        eae                     A)    SOQ               A       iy     wv
                                                                                              SZ          oT                 ON        AM ithe.                     NS     See     ZN    Se           ¢
@)        ee                                        See ee                   —     | —. —     ja Sl x        S       i    i BO             3.  eo   po       se I Lf fe “e- eye               <a oe 3 3 =
                                                         7                      —— —                      a —— a             a                                    a Rake           ei                \ Bl
       =                                            Pa                   Bem                                             fF                                        -——                         A de
      REZ                                           RI ||            S—_Pelbatnroom        Me         |                 valve)                                     l7_      \J             ‘eiah        S
                                                    PE                                                                Ti]     ens s                            Hy           Y                    a
                                                           Ag                                |)         es                     "                                            |                 PBs
                                                    Pye               736 |                           ,  "se                        robe         ped 3            /\\       /\                £4, |    | als
                                                                             |                                                                                     |        |
                                                           |                bs                                                Ree                                Sf)                          ave
                                                                                                                             aa                                  hil      [|                  ig
                                                    =      stair          val.         CH                                                                     |    | |    |                   2 “Sy me
                                                    rt       Te                 af                                                                                 1 |    /  |              f°   Be       |
                                                    bp                      |                                             ~                  {FFL 22 040 |         - |   /   |               ‘ee aN       |
 @                                                                              way                   |                                                          Plt        7                  iad     |  if
  2    —                                                                     et                                 a                                                Pp             ee gg |_|                       —
 ~                                                                                                                                                                       }  J                 "Sg
                                                    —                               —                                 =                                           \E)    |                     aan        |
           i                                         vw                                    a                           |                                      th)        VV                     Lae       oN
                                                    aN        =                                               \va                                                  \ |   X                        y       |
                                                                SSS Sy                                          B  +      +                                              \                         +  >
           5                                             :      =          bunk/ rumpus              office          ens2                       bed 2             l\ |   |                                *
                                                                     =         Tae        \day bed            ve]     1?                         T&G               iV    {                                |
                                                                 a                        “ms         sia                        robe                          |   Ih       :                         J,
       6                                                      eft lla                                              |  pg!                                     F    at\   |    \                 \    -
                                                                                           lr                                                                an                                 uP
       €                                                              ~            |                                                                               TA          .                  a
                                                        a                                   4    Sa                    —         =         _——————                                              |      fy
  aye                                                A   | ES                              RSL                IE Se                                             eter ae ef
                                                    Le                         sep—        COS Ne                            GR      Tey                                                         |        |
            8                                       ae                       deck 3|          TAS KTR                       Ki               (Ee                   |           :         Leer TRS         :
            8                                       7                      (FL 22000        rae           BRANT j                   |       /€& =                       es                           Sj
            2                                       wth                           SY f= | |           ESAT bs                               eR \                    eee Nef        ——
                                             ee                          Bas VRS EVE                                                                       el                        =
                                              ,    ooraes | WR RS         SN                 Fe         ZINA NG, Ae ine                        eat       NBS         SON       ft          balustrade type 1
                                             Be gaa.         Sy peo Ee Ne                               / Hl          |  \ ) GIN) Sz Netin ASAT                       SS          |  Conc.ea concrete exposed aggregate
                                a            ns                           ese LA                                    ol |e DPS USS, SS                                ee ae
            26,0 |)  % 25.05 |)       280       23.9        22.0       210         ons      a)            189 Pouncory 170 |       16.6 SS 8 \ Mg        /      15.05      \ KQ\     Go     grated drain
               hhX     |      \ |                                           |      K       7 i)       |                   ~         / a {A       —&                        |   \\    8      sink
               |               \                                                           \                                        al    \X       ~                       \ |      SED    shot edge decking
               .               V                                                           \ |                                            Ys                                \       SHR     shower
                 |             -                   |                               |        v         |               |                                            |        J       aut    stician cadang pe 1
                 |                                 |                               |                  |               |                                            |                 1      ‘org
                                                                                                                                                                                     Tas    tongue and groove
                                                                                                                                                                                    vB      vanity basin
                 |                                 |                               |                  |               |                                            |                refer to schedules for details:
                 |                                 |                               |                  |               |                                            |                 NOTE: all structural elements; including all
                                                                                                                                                                                     ‘slabs, columns, beams, footings and
                 |                                 |                               |                  |               |                                            |                 NOTE: all landscaping elements and
                                                                                                                                           (o>                                      planting types and description to be in
                 |                                 |                               |                  |               |                    QD                      |                | deepen data re ies
 ( sparks orchitects                           —                                                                                                           Lowe ron or en                     wis   (   9”)
                                              Se                                                                                                           cova                               wore     \C
                                                                                                                        Page 35 of 110

Section 36

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 36 of 110

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                  13 OCTOBER 2015

                                                                                                                                                                                             err
                      ?                                                              ?                 ?              ?                                          ?
                       |                                °                             |                 |               |                                          |
                       |                                |                             |                 |               |                                          |
                       |                                |                             |                 |               |                                          |          hwd timer posts & ss. cable trellis
                       |                                |                             |                 |               |                                      ~   IA          ci                 a)
                                                        |                             |                 |  \\y                                                     4         sy               ase | LEZ.
                                                                                                            \\ /,               go,            hy // 45s      A                 "1     2    an     /       ~
                                                                                                           ONT IN.                ORIN                  |  SAWN          FAV POS           PRAT
                                                                                                 a AANA           LY                    OS     fll Seok   pce       N\           7 BEM          Se
                 :                                                                               emia                        ell                     a                         WSS
                                                                                                 a)        a | <I pa                       ath peat                od                   ot          ( wv
                 NI                                                                              ie <i           SU fi     ,     :        ¥                                     PE   ey        L i  Pap
       @)-   —T                                                                               Lod Ze    ae f=   ASK it. es a Shfhee. 2 Engl           ret   “ane cle et          2 Buel me     dg —          _
                                                           ~                                                   eed                   = [a                        ee     sa.4      rm               \"£:
             “                                             ws                         !                 f               |         [= =&                                    lear
             a                                            Ley                                                     ote                  $f                                                             a
                                                               _—_                                                                   Se                           |                                 #
                                                             =                        |                 |               i            =)                                                     ie       8
                                                             az                       !                 pi                                                                                            ny
                                                             oy                         undercroft                                   | pootdeck =    ——i<‘TSSS       pl                        pet     i
                                                          landing te                  Peon                                                           =                    if                   e       ii
        pt                                               conch                   ye                                                    Cor 660                                     a             paL-
       -                                                —                             |                 |               |                                         I}    | /                  i LZ      a
                  !                                                                   |                 |               |                                               V                     Ls       : H
                  i                                      —                            |                 |               |                                               \                              'y
                                                                                      !                 !               |                                                                        on
             ;                                              ~                         !                                 eee      || lI                                                         Ve
                                                                                                               Se                                       ;                                              -
       O-+                                                                             PRION                         ee              | Sa               OSE               UE     S         e N      +— —
                  .                                                                          Os            A i      ZR                       ‘s                                            HR
                  plo                                                                  D6               ESN                    se (8               ae              eA)                  gh) Pe
                           ecm See Ne                                                  W( Be \s           OMA SG                             Fie             RAY)                     x
                  =                                                                    BWDP \A      \| | 7                      Aa         |" F    no     /           aol  uy               782,     h>
                  a                                                              eS LI                              cl         oA                MSN          2 Lage
                                 cooktop                                               =       —     2     0 \ {iN      “| \ Y   Ay WAIN        Nata      is                s—-              .         :
                  26 " \  sep    She ege desing      23.0       22.0       210 |      00     \ Ne       |   18%         f70\)       hh iy (e      “eZ   |      we
                           |g    Bkeme                  |                             p       Vo        |               |                                          i      \
                          st     ‘store
                       | | Wer   emai”                  |                             |                 |               |
                       | | mereeanaaeatoraoum |         |                             |                 |               |                                          |
                       | | sabe column, bere, otngs nd. |                             |                 |
                           framing; to be in accordance with engineer's
                           design and detail,
                           NOTE: all landscaping elements and | b                     |                 |               |                  ’                       |
                          planting types and description to be in
                          design and detail.            |                             |                 |               |                    Dy                    |
                                                   Pen NT                                                                                                 Seale 100    Ls 14
       {  Sparks architects                        —                          | 38.Park Crescent Sunshine Beach == Johmand Ngaio Jamieson  | 083  | PO___~Poo Terrace Flor lan              p17 (7)
                                                   Seater                    [ere                                  eter                   Tbr. Teron] crowing                              dag no
                                                                                                                         Page 36 of 110

Section 37

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 37 of 110

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                               13 OCTOBER 2015

        (                                                                                                                                                                                                       | Development Approval Development Approval )

                                                                                                                                                                                    fo                                  12.0m height limit al
                1                                                                                       _                _                    ~                                            ae                      ~     1
                '                                       (F)                                             (E)              (D)                 ©                                 (8)                                 (A)   1
                |                                       T                                               T                T                                                     a                                    Ty
                i                                                                                                                                                      cece
                                   200K                                       OK 8000                                    >—K    800K                         80K ABO                                                KID
                                                                                                                                                               -o                                                        '
                                                         |                                               |                |                    |       wet                      _—                                   ||
                                                         |                                               |                |                    |.--                              =                                   Lo
       soot}          resem                                                                                                                                       we        ffm em                          RO
                                                                                                                                            on                                       /                               f   1
                1                                                                                                                  -7       —_
                                                         |                                               |                |   lee         i                                     |  /                                 |   iE
     :                                                   |                                               |           aa                /       |                                | /                poe          _ eT eave
        bedroom mezzanine FFL 204200 ef
                '                                        |                                  22        OT                  |                    |                                                         :               '
     3                                            ap                                                                                                                                 nl pile
                1                                                                   _--oO                                                                                                            71S                 1
                                                         |         _       aa                   _                                                                                                 La ae                  1
                I                                                              ——                                                                                                            sen ee DY
     +          Loe LL                  fe 2 Te                                                           po                                                                           7    +   2       oy               1
                                                         1      \          \          OM                                                                                         ~.          Rs          §               '
     o          '               wee                             \                                                         lf                                                    srt - =      if ny Ee PONE
                  Rl aethie =                                                                                                                                                    ~      4   Span  a   OS aN              I
        ground Weor   FFL 2600                                        CS                                                                                        ee                gar SS RE og      ewe                -
         structuraljslab FFL 25,480                                                                                                                      ue                      a4      ae      fat             7}
     ge RAR                                           SS              -                                                                                                          oe                           as         |
        Feu!                                                Fl                                   |                                                “                              sal) 2. AW
                                         -                                                                                                         -                              <3     ge    YY          |             1
      |*   FC2 tolwindow hood typically                                                                                                Ee                                        PS8             eo        s
     fie                    Pos                    |                                Til                               mi                                                                SO
     dogma                      Y>                       |                          ae                               i. (6             E                 im                             3                  i             |
            ee  Tl                     3    $                                                                 _                                                                  7    —                    ul
        lower groiind floor FFL 22.040                   |                                         Ween                   |                    |                                 r)
                ee                                                        es                                                                                                                                             !
                                                  ween dene                        :                 NTRS TT TUT AF sae                 a          d       iD                   r
           onan een nnn             n                                                            ALE Ry Wee               7)                           aS.                      i
     2                                                   :                                      t    CPT)                   Vase                                                r                         a
                1                                                                                 sh ar] aay   | i   é    !    /                   <A\__                                                                 \
     &          \                                                                               Hh  Mh i   ” a       &      4 / eee? Zien ={))                                  7                          legend
                '                                        |                                        AUT   TRI I iF     =       Md    S    CZ                                      i                          Bf      Tramoless glass balustrade
                                                                                                  at    ts a } Ay                                                                                          ay      Seuss
                                                                                                  t]he      AMT  ELT oe                                                         1                                     ve
                                       °                 |               -           (Wreouat    | a Pl Ds                ——S                                                   i|                         er      ignteoor
                1              f                                               Lwin cal, i                                                     undercroft                       ‘|                         Fez    fibre cement with render finish -
         undercroft =_->-FFL 17,280 al               -   |                     sa          (= = =F ~~                                                                           "!                         mt     tmetal shwelibre cement sheel
        ~~ ee              wes UB = eo                                       a ee            a       - ---- 2b         <r rrrrrrirriiiiiiiiiiiiiiiiic7- 4,                                                 we      a et
               e a                OR OS NF               epee tii ti!                                                                                                    te---n-                           rs      part
                4 Gin            ———      ——                eqcort                                                                                                  te                                             «
           ==             SSSSSSTSSaT ee                                                      tat                                                                                    H:11.99M :RL31.99H: 11 | Str Shp easing
                bo-------------4F                             i                                                                                                                     Above NGL: RL 20.00Abov | $Nt S<TEON PE nt colour
                '                         i        Poot       "                                                                                                                  —                         SR2     tooth render dark colour
                |                         i                   i                                                                                                                                            refer to schedules for details
                '                          '                  i i                                                                                                                                          NOTE: all structural elements; including all
                I                         IL                                                                                                                                        H: 11.98M HRUUHTMB : RL: | fering tobe im accordance wth engineers
                                                          a |                                                                                                                                        2RL  |__ design and detat.    /
                                                                                                                                                                                           Key Plan @ 1:500                        :
        ( sparks architects                              weraspatcecs cn                38 Park Crescent Sunshine Beach         John and Ngaio Jamieson      083   Po       North West Elevation                  pp21          )    \
         \                                               sate acine ony Nd oe eae en72  project                                 client                     |jobno. | drawn | drawing                            Tawgn     \    74   /
                                                                                                                                       Page 37 of 110

Section 38

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 38 of 110

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                       13 OCTOBER 2015

                                                                            ?                   °                    0
                                                             !                  ONAN
                                      600 eave          =                =                                                                        600 eave:
        woof       FFLSN8200                                               sj   aimee tte                                 Besser      Nr et
                                                         Th    |    -        \-         =                         iC | gn re        |         <   Sug
                                                       J     4 QA                                 |                    Fa      So                 :
                                                                    3,135                                             ¢—   3.138... ,
        bedroom mezzanine FFL20420 0.00                                        SET ETAT ATE          HT ETH HHTH             ie                                 a ae
                                          |                    | eon         NL                                                     a
                                      hw. timber blade fence -HWD1 =      “EN                                            ¢     |    -
                                                               |                                                                    te
                                                               1,000                                                         SR1    i
        some oor   FFL28                                      mM                          |                                  ME
       structurale  FFL25400 0                                                        SS See
                                                          =\\V/,                                                   ee       ~~. ==
                                                          FZ    NIN} ff                          i                         2 el
                                                           ’   Pap                                                           $ =
                                                           Dyan  . 2                                                       e “> Cia
                                                            pe 0                                                          :     Me
        lower ground floor FFL 22,040                        7 st! Ian!                                                         {500 |
        See eis sees eee Se ar FS see     nS a           ee                             ——                                      7 oy         ee                                     ee
                                                             Cy ie                                                   i =
                                                            als              Pg                                   be            =
                                                         pred     M                                                          4  =H
                                                                                                                             , SS
                                                       fn,                    i                                     A ag
                                                        (         h,                           _ |                             EN
                                                       g     sf         i ie                                          elt
         names    rem                                                                                                   rire                                        tegen               _
                                                        —~    r&            i                                         a        =a
          |                            RSET                       NY                                                                               5               eee
                                                                 W/L        TE    7                                   = <                                           For"  Feehan
                                                             mR  1%          =~    ye            Wh 2 sxcossee?                                                     =    coramctle-Ighicoour
                                                              a ae NN                                                                                               m2   metal sheetifibre cement sheet
                                                               !                                                                                               — i        eee
                                                                                                                                            eenwmel                 |e    See             |
                                                               |                                                                          Above NGL'RLZO00AGOVENGL-RL | Sel Sete”
                                                                                                                                                                    Sees vender = a cur
                                                                                                                                    |                               NOTE: all structural elements; including all
                                                               |                                                                 |                                  refer to schedules for details
                                                                                                                                           i 1190 tions: Ri 28.85   inns tte macro res
                                                                                                                                                   Key Plan @ 1:500
         sparks architects         G@          ein                                                                            088    [PO   Nor Eos eaten                 oa    (_)
                                              ae                                                                               pra | own | rowing                        avg
                                                                                                             Page 38 of T10

Section 39

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 39 of 110

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   13 OCTOBER 2015

                                                                                            [et trterrel ees] Development Approval                                 Development Approval )

                 1                         S                                                                                                                                 '
                 9                           “                           9               9°            ¢                                    ¢                                ;
                 '                               tS                                                                                         T                                |
                 | Co           AK                     BQO      Kf 000K                        8,000   FHKE                9609                 OK           6000          D
                 1                              MB        wos                                                                                                                !
                 1  |                               Ro            ae       |              |             |                                    |                               |
                L                          a5                         me                                                                     :
       —      4     bo ------445—                                          Bt                       pe                                                          rot     ft. 820
           S00 eave                         em                                      a     |             |                                                         12.0m height limit 3
      oe            |     ET os           RES                     es!                         >.      |                                            |             prtroom mezzaning FFL 204
                       MY  so At
                     mon TAU 4        te                                   |                             =~                                  |
      1. timber blade tl LP                                                if                                  a                             |
      fence -HwD1 |] |]     era              i    "                        |                                   sw                    ret     |                      /              8
           2a     {al |||    Mig tl                                                                     |                mero                |                               ps    §
           :  kaa           y    ay     Srey          oe                   |                                                   _        ne
         al!  aN     PNY Par  VRE) Roe   |    ‘haar                        |                                                                                    ground floor L 26,000
                 ee            bs $.,                             a                                                                             Se OL
                  WU ud           o         -      ANG.                    |                            i                                                        structural slab L 25,480
      Ta          OREO            i       coe    eZ Ya                       ——                                                                 ee
                    |       Se  gay    e2        “wie Gy                   i                                                                                       FC2to.window wpicaly
                    :                        “J       ;                  ;                                                                   :                   ?           |  / ag
                    |               #   Lease   |= + = 4H)                                                                                                         FC bind  Nop
       legend                                      LZ        deck 3             pd    SSS           D3   =       SS                                        :   -                fr *
        Bt   frameless glass balustrade       ee                                                                                                          ~                       aH
        io   pevioodtype 1 Be                 | \_                                                                                           |                  tower ground floor FFL 18,980
       tes    1 eet                             |                                                                                            |                                      Be
        wt    connate                           i            =                                   I          I             :                  |        eo            VY     yp 2a
              ==                                Sw                                                                                                   A           sol     oped
              ee                                i                           NZ                   PIA        Wa                               |             eon           Ue
        :                                       i                           aor                                                              |                ;          Slo     g
        Sit   sap cling                         1                            CN                 Hu Papa  tH                                                                        +
        Si   Seam    eee                        i                             SC                   i i      He                               |                     cable io cig
        msi                                     i           nde               it               yal         l                                 :                     ™
              sre  ene                                                           \W AS:             ENT BATT TTT
      fee eyscoens tr                           !                          i                  eee                                fe                            anarron     ep 0
        estan and deta     TTT                       a                                                A.) ve |             Y       .     “, [ poo
                 ||                           tp    --                     |                             Sg               Nig ——— a                                 \ AKA,
                    H: 11.99M : RL31.99H: 11                                              |                      4       ts      TE                                 Vy          ~~
                   Above NGL: RL 20.00 Abov     ‘|                         |              |             |             ‘Sit.                                               |       >
                                                                                                                                 __.                                       Z      i, e
                                                y                                                                                   OTe                 Wo   NGL againstbuiing = |
                                                                                                                                        i              P= get aan    ~~~ = =F
                    Hi 1.98M WRtIMS : RL                                                                                                L---------                           '
                                 =                                                                                                        Se
                                Plan @ 1:500
      ( sparks orchitects                   enn                                                                                      Sot ean                       wes    (|
                                            =e                                                                                        svg                          wore  \
                                                                                                         Page 39 Of T10

Section 40

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 40 of 110

C                                                                                                                         Ex ame                               ee                                                        a Development Approval )

               tos                                > a      =                                     —~                     —~                 ~                                                    Po                                             !
               1  (A)                                   ~~ B)                                   (Cc)                   (0)                (E)                                                   (F)                                            \
               1                                             4
               |    KO 6a30                               DD                                                       C3000                  KO OY
               |                                                      tse                         |                                                                                               |
                                                                             so                                                                                                                                                                5
                    |                                      at    OK          9 fall ~~            |                      |                  |                                                     |                                            H
               '                                                             —_-         yA                                                                                                                                                    1
                    |                                 win                                       ~t                       |                  |                                                     |
 ee                                                                |                              ee                                                                                                                          rot             ft. t20
                                                      -                                            —                     |                  |                                                     |
              3     |                                                                                  \         ~e .                                                                                                                                   3
                    |                                 .         c                                 j rer                 sh                  |                                                     |                              12.0 eight nt          &
                                                     >                                                    —                ys   .                                                                                                 long se
                                           _                                                                         tn                     |                                                     |                 |          bedroom mezzaning FFL 29,4
                         fey     -                                                                                                       ~s >                                                     |
                        fm,                                                                                                                     ~~                 ee
                      | a   &                                                                                                                       ae                               ee           |
 een wall             Figen toes                                                                                                                           SIS                         For)                                                             g
 WA                    ,      —_          cer                                                                                               |                         ~~ ._]              /       |                                                     =
  Wy                   ¢      Pe          y\    &                                                                                                                           weep
  \ V4,               st    : a, sntey cout | 3                                                                                             |                 deck          /     ote . 4- ae al. - oe
WAs ms                   ee        won   Lk                                                                                                 |                                     \     0         ]         Tat apes ele          -------7
                        Pn,      a) Jy                                                                     a                                                       ee             i                                          ground fioor   —_FFL.26,000
                     NR                                                                                                                     =                                                         structural stab                         FFL 25,480
                              ——                                                                                                                                                                  |
                                     my
                                       —                                                                                                                                                          |                              EO      ae   Bh
                                                  a                                                                                                                                                                           ;          2      2
                                                     .                                                                                                                                            |                                                   BF
 %                          |                                :          ih                    Hy                        |                                      La |                               i                   |                                 :
   gend                                                         ~                                                                                                                                                   =
 Bt       frameless glass balustrade                                                                                                                                 =       :                                                                       .
 pwot     sree        "       ee                                         ~                                 ||                                                       L                            L    —                      lower ground floor FFL 18,980
 Fct      fibre cement with render finish -                                                                                                                                                       |                                                       “
          light colour
          =                                                                                                                           ne                                                          |       ¢                                  wl  a0
  Fc2     fibre cement with render Snish -                                                                                               ALIA)                                                                 §
  mt      metal sheetfibre cement sheet!                                                                                            H  SH || Els I   |
          ceramic tile - light colour                                                                                                i ‘|  a i}     Hh                                                                                            4       .
 m2      metal sheetfibre coment shoot                                                                                              zi) RH ka   |  il                                             |                   ;             ,      y       ~
     |    aioe                                                                                                                     a    RSA          IE                                                                           a               1s
  Rt     roof type 1                                                                                      veh,                       i  itl i  4   H                                              |                                           n         3
 R2       roof type 2                                                                                                                i         i   |
  SUL    sep lacing                                                                                           os                        NT  AIPA A                                                                                                      +
  eet      root vender - ight colour                                                                                                l|\|h   i  I    al                  6              pool deck |
  SR2     ‘smooth render - dark colour                                                                                             / ih i   i  i    i                                                                         poo! fence
  ee                  aoe |                                                                                 ria dl |                    a                                      .
  farm ipbeeccodane wih engmeere |                                                                                                 Mataln          a                        3 he         oh                   SS       >     entero |___epsr.s
     ign and deta                                                                                                                                                           7
 i                                                                                                                                                     __                   EM                                                                      -
                                                                                                                                                        ee                    —“‘(‘C‘isCSCisz                T                         D an Ah rT}
                    H: 11.99M : RL 31,99 H: 11             "1                                                                                                          —                           pool                       Jawn.                  sb
                   Above NGL: RL 20.00 Abov:               i                                                                                                                          ee          IN
                                                           ~                                                                                                                                  S--       I IN         ~ oo      me =e.

   Key Plan @ 1:500
fo                                            -       PENS       en enna a8               Jamieson Residence                                                                           Scale 7:100    uuuut__s—_1___J                      iN
|  sparks architects                                   —————                             38 Park Crescent Sunshine Beach               John and Ngaio Jamieson        083     PO       Section A                                 posi    (         )    j
\ -                                                   epate cxcce iy he ohn 9 446728     project                                      client                          jobno.  | drawn | drawing                                 |dwgno.     \     4  /

                                                                                                                                                    Page 40 of 110

Section 41

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   13 OCTOBER 2015


3                      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR A
                       SERVICE AND UTILITY TYPE 3 (TOWER) AT DAVIS ROAD, COOTHARABA
                       (MCU15/0061)
CUMENT INF ORM ATION




Author                         Development Planner, Jack Lewis
                               Planning & Infrastructure Department

Index                          ECM / Application / MCU15/0061

Attachments                    1.   Proposal Plans
                               2.   Photomontages



         APPLICATION DETAILS

         Applicant                         NBN Co

         Proposal                          Development Permit for Material Change of Use - Service &
                                           Utility Type 3 (Tower)

         Properly Made Date                30 June 2015

         Information Request Date          14 July 2015

         Information Response Date         3 August 2015

         Decision Due Date                 5 November 2015

         Number of Submissions             1 Properly Made Submission

         PROPERTY DETAILS

         Property Address                  Davis Rd COOTHARABA QLD 4565

         RP Description                    Lot 1 SP277246

         Land Area                         300m2

         Existing Use of Land              Vacant

         STATUTORY DETAILS

         SEQRP Designation                 Regional Landscape & Rural Production

         Locality                          Boreen Point, Kin Kin & Cootharaba

         Zone                              Rural

         Overlays                          Biodiversity Overlay – Environmental Protection Area
                                           Natural Hazards – Medium Bushfire Hazard

         Assessment Type                   Impact



                                                                                       Page 41 of 110

Section 42

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           13 OCTOBER 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 13 October 2015 regarding Application No. MCU15/0061 for a
Development Permit for Material Change of Use for Service & Utility Type 3 (Tower) situated
at Davis Road, Cootharaba and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
             When Conditions must be Complied With
     1.      Unless otherwise stated, all conditions of this Decision Notice must be complied
             with prior to the use commencing, and then compliance maintained at all times
             while the use continues.
             Approved Plans
     2.      Development undertaken in accordance with this approval must generally
             comply with the approved plans of development. The approved plans are listed
             in the following table unless otherwise amended by these conditions.
          Plan No.          Rev.   Plan/Document Name                               Date
          4GYM-51-25-       06     Site Specific Notes and Antenna Table drawn by   12/05/2015
          DAVD-C1                  Aurecon

          4GYM-51-25-       06     Overall Site Plan drawn by Aurecon               12/05/2015
          DAVD-C2

          4GYM-51-25-       06     Site Setout Plan drawn by Aurecon                12/05/2015
          DAVD-C3

          4GYM-51-25-       06     Site Elevation and Details drawn by Aurecon      12/05/2015
          DAVD-C4

     3.      Development authorised by this approval must be undertaken generally in
             accordance with the Approved Plans listed within this Decision Notice.
             Building Height
     4.      The maximum height of the structure must not exceed 41 metres above the
             finished ground level and the natural ground surface.
     5.      Certification must be submitted to Council from a Licensed Surveyor which
             certifies that the monopole structure does not exceed the maximum height
             requirement of this Decision Notice.
     6.      No lights are permitted to be attached to the telecommunications facility, except
             where required for aircraft hazard lighting purposes or similar.
             Existing Vegetation
     7.      Existing vegetation within the lease area located outside of the 100m2 compound
             and driveway access area shall be maintained and allowed to grow to full form.




                                                                                 Page 42 of 110

Section 43

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            13 OCTOBER 2015


           Health and Safety
     8.    The development must not, at any time during the life of the development, result
           in human exposure to environmental electromagnetic emissions exceeding the
           current regulations, standards and/or recommendations of the Australian
           Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the
           infrastructure must provide, at any time upon request by Council, written
           certification to demonstrate compliance with this condition.        The written
           certification must assume:
           a.    a maximum number of users over the lifetime of any pole or other
                 supporting structure
           b.    full power usage
           c.    a maximum down tilt of antennae.
     9.    Warning information signs and security fencing must be provided on the site to
           prevent unauthorised entry. Fencing must be camouflaged through the use of
           colours, materials and screening vegetation to blend the fence into the visual
           landscape.
           Colours and Finishes
     10.   The monopole and associated panels must be finished in colours that blend in
           visually into the landscape.
           Cessation of Use
     11.   The telecommunications facility must be removed from the site upon cessation of
           the use.

B.   Find the following are sufficient grounds to justify the decision despite the conflict with
     the Planning Scheme:
     1.    The telecommunications facility will provide coverage for the NBN fixed wireless
           network, allowing for the delivery of higher speed data to rural residential
           households in the Cootharaba area; and
     2.    The proposal will not significantly impact on the visual or residential amenity of
           the locality as it is to be located near existing infrastructure, and is screened by
           existing vegetation.



REPORT
1.   PROPOSAL
The application seeks a Development Permit for Material Change of Use for a
telecommunications tower associated with the establishment of the fixed wireless network
infrastructure of the National Broadband Network (NBN). Fixed wireless is a network of base
station facilities proposed to provide fast internet service to the majority of rural and rural
residential properties. Since 2013, there have been 8 other NBN towers approved in the
Noosa Shire, with several already constructed and operational.

The base stations communicate directly with antennas fixed to individual premises (dwellings
or businesses) to deliver wireless broadband access. The proposed tower is designed to
serve approximately 275 rural residential properties in the Cootharaba area.




                                                                                 Page 43 of 110

Section 44

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                     13 OCTOBER 2015


The proposal is for a 41 metre high monopole located within a 300m2 lands lease on Davis
Road, Cootharaba. The lands lease has recently been created within the 210m wide Davis
Road reserve, near the existing Cootharaba Rural Fire Service (RFS) Station. The
infrastructure includes transmission equipment and outdoor cabinets within a 100m2
compound. The locality plan is shown in Figure 1 below, and the detailed proposal plans
included as Attachment 1.




Figure.1 Locality plan of Davis Road, Cootharaba.




                                                                         Page 44 of 110

Section 45

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


2.   SITE DETAILS
2.1. Background
On 5 July 2015, the Department of Natural Resources & Mines (DNRM) created the 300m 2
lands lease over the subject development site.
2.2. Site Description
The proposed tower is located 65m east of the formed/bitumen section of Davis Road and
120m south of Cootharaba Road. The site is adjacent to existing electricity infrastructure and
accessible via an existing access track. The proposed facility will utilise existing access and
power infrastructure, in conjunction with mature vegetation screening that will surround the
facility to the east, south and west (see Figure 2).




Figure 2 – Location of proposed facility (red arrow) looking south east from the Davis Road
reserve.
2.3. Surrounding Land Uses
Surrounding the site are large rural residential and agricultural grazing properties. The
closest houses to the tower are located 150m to the north east (640 Cootharaba Rd), 270m
to the south east (23 Davis Rd), and 170m to the west (612 Cootharaba Rd). The
Cootharaba Rural Fire Service Station is also located approximately 100m to the west of the
site.
2.4. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions; and
   the Planning Scheme for the local government area.


                                                                               Page 45 of 110

Section 46

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             13 OCTOBER 2015


Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
2.5. State and Other Statutory Instruments
The site is located within the Regional Landscape and Rural Production Area of the SEQ
Regional Plan. The proposal is consistent with the regional policies and regulatory provisions
of the SEQ Regional Plan.
2.6. Statutory Instruments – Planning Scheme
The subject site is located in the Boreen Point, Kin Kin & Cootharaba Locality. The site is
within the Davis Road reserve and in accordance with Part 2.10.1 of The Noosa Plan, if a
road is not shown as being covered by a zone, the land has the same zoning as the
adjoining land. The surrounding lots are all zoned Rural and the subject site therefore also
takes on the Rural zoning.
The proposed use is identified as an inconsistent use within the Rural zone and is required
to follow an impact assessable application process. While the whole of the planning scheme
is applicable, the following codes and policies are most relevant to the application:
    Mary River Catchment Locality Code
    Planning Scheme Policy 23 – Telecommunication Towers
    Infrastructure Uses Code

The pertinent issues arising out of the assessment are discussed below.

Mary River Catchment Locality Code
The Locality Code seeks for new development to not significantly impact on the existing
visual amenity of the area. The proposed 41m high tower is surrounded by existing mature
vegetation (up to 30m in height) and is more than 150m away from the closest house.

The applicant has produced photomontages using a cherry picker to represent the visual
impacts of the tower from the closest residential houses to the east of the site and the Davis
Rd bitumen formation as indicated in Attachment 2. The photomontages show that only the
top portion of the tower will be visible from the closest residential dwellings, with the majority
of the tower screened by the existing vegetation. It is considered that the proposed location
does not detract from the existing scenic amenity of the area and is consistent with the visual
amenity Outcomes of the code.

Planning Scheme Policy 23 - Telecommunication Towers
Section 3.2 & 3.4 of the Policy outlines matters for consideration when assessing proposals
for towers. The most applicable points associated with the assessment of this proposal are:

     3.2 a) Loss of vegetation on steep slopes or ridgelines; or
     3.2 b) Visual scarring or the degradation of views or vistas from the major road
            network; or
     3.2 c) Alteration to key landform and landscape characters such that they become
            dominated by the facility; or
     3.4 d) Be positioned to minimise clutter of multiple facilities.

The proposed tower is located on relatively flat land and requires the removal of
approximately 15 trees associated with the lease area and driveway. The tower will not be
readily seen from the major road network and the existing vegetation assists in screening the
base of the tower. The height of the tower also allows future co-location opportunities with
other telecommunication providers, consistent with the outcomes of the Policy.



                                                                                 Page 46 of 110

Section 47

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


Infrastructure Uses Code
The Code includes requirements around two central themes - Health & Safety and Visual
Amenity.

Health & Safety
The Specific Outcomes of the Code require the development to avoid unacceptable risks to
the environment or to personal and public safety. The applicant has provided a summary of
the maximum cumulative radiofrequency (RF) and electromagnetic energy (EME) levels at
ground level emitted from the proposed tower, assuming full power usage. The summary
indicates the proposed tower will emit a maximum EME level from the tower, which is
0.098% of the Australian Radiation Protection and Nuclear Safety Agency’s (ARPANSA)
regulated acceptable maximum radiation public exposure limits.

Taking a precautionary approach to the sensitive issue concerning health and safety over
time, certification is to be provided by the telecommunications carrier upon request. The
certification must demonstrate annual compliance with the Health & Safety requirements
compared to ARPANSA regulations.

Visual Amenity
The Code seeks for the tower to be below 25m height in the Rural zone. The proposed tower
is 41m high, with the applicant indicating the height is required to provide appropriate
coverage to the surrounding properties.

The tower will be sited amongst mature vegetation, near existing electricity infrastructure and
setback more than 150m from the closest residential dwelling. As demonstrated by the
photomontages of the tower from the neighbouring residential dwellings and the Davis Road
carriageway (See Attachment 2), the proposal is considered to be visually integrated with
its setting and existing infrastructure so as not to dominate views from surrounding areas.

Conditions are recommended for the development to be finished with suitable muted tones,
no lights to be attached and existing vegetation to be kept around the perimeter of the lease
area, which would assist in screening the tower.
Overlay Provisions
The Biodiversity and Natural Hazards Overlay codes are applicable to this application:
Natural Hazards Overlay (Medium Bushfire Hazard Area)
The proposed development is a non-habitable structure, which will not result in an increase
in the number of people living, working or congregating in the mapped bushfire or landslide
hazard areas, thus meeting the outcomes of the Natural Hazards Overlay.
Biodiversity Overlay (Environmental Enhancement)
The proposed facility has been located within a section of the Davis Road reserve mapped
as being Environmental Enhancement Area. Although the subject site is mapped by the
overlay, the location of the facility has been sited within a previously disturbed area of the
Davis Road reserve, adjacent to an existing clearing for aerial power lines and access.

The development will occupy a relatively small footprint within the site and will involve only
minor vegetation clearing of ‘least concern’ vegetation (approximately 15 trees) and requires
only minor excavation works during the construction of the facility. The applicant includes a
flora and fauna survey within a 100m buffer of the proposed clearing, which concludes that
the site does not include any rare and/or endangered species and has been impacted by
previous clearing.



                                                                               Page 47 of 110

Section 48

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


Council’s Environment Officer agrees with the consultant report and indicates that the
proposal minimises the total footprint within which all structures and driveways are
contained. For these reasons, the proposal is considered to comply with the Overall
Outcomes of the Biodiversity Overlay Code.
3.   CONSULTATION
3.1. IDAS Referral Agencies
Not applicable
3.2. Other Referrals
The application was forwarded to the following internal Council specialists:
   Environment Officer
   Development Engineering Officer

The specialist comments are included as part of this report.
3.3. Public Notification
The application was publicly notified for 15 business days in accordance with the
Sustainable Planning Act 2009. One (1) properly made submission was received. The
following table provides a summary and assessment of the issues raised by submitters.

 Issues                                      Comments

 Electromagnetic radiation from the tower    The summary indicates the proposed tower will
 will cause cancer.                          emit a maximum EME level from the tower,
                                             which is 0.098% of the Australian Radiation
                                             Protection and Nuclear Safety Agency’s
                                             (ARPANSA) regulated acceptable maximum
                                             radiation public exposure limits.

4.   CONCLUSION
The proposed development is for a 41m high tower to be erected within the Davis Road
reserve, Cootharaba for the establishment of the fixed wireless network infrastructure of the
National Broadband Network (NBN). The site is located within the Rural zone and the
proposed Infrastructure use as a Service & Utility Type 3 Tower is identified as an
inconsistent use within the zone.

Despite the inconsistency with the zone, the application has been assessed against the
provisions of The Noosa Plan and does not raise any significant planning concerns. The
tower does not pose an unacceptable risk to public safety. The proposed location is set
amongst existing vegetation and is an acceptable distance away from neighbouring
properties and the major road network, so as not to be visually dominant or obtrusive.

Whilst the proposed use raises a conflict with the Boreen Point, Kin Kin & Cootharaba
Locality Code, it is considered that the following grounds are sufficient to support the
proposal:

1.   The telecommunications facility will provide coverage for the NBN fixed wireless
     network, allowing for the delivery of higher speed data to rural residential households
     in the Cootharaba area; and




                                                                               Page 48 of 110

Section 49

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  13 OCTOBER 2015


2.     The proposal will not significantly impact on the visual or residential amenity of the
       locality as it is to be located near existing infrastructure, and is screened by existing
       vegetation.
The application is, therefore, recommended for approval, subject to conditions.


Departments/Sections Consulted:

     Community Services                       x   Planning & Infrastructure
     Disaster Management & Public Order           Building & Plumbing Services
     Waste & Environmental Health                 DA Planning
     Community Facilities                         Strategic Land Use Planning
     Cultural Facilities                          Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

     Executive Office                             Corporate Services
     Community Engagement                         Finance
     Customer Service                             ICT
     Executive Support                            Procurement & Fleet
     Governance                                   Property & Facilities
     Human Resources                              Revenue Services




                                                                                     Page 49 of 110

Section 50

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015


                                                                       ATTACHMENT 1 – Proposal Plans




                                                      Page 50 of 110

Section 51

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 51 of 110

Get

                                                                                                                                                                                                            Vv
                                                                                                                                                                                                    Limited
                                                                                                                                                                                       Get
               AE — AE — AE — at — ab — Ae —at —at              ae —at      at —at —at —ae            ae    en               7 EXISTING AERIAL ELECTRICAL LINES                                  ee
          re                                                                                             €            EAE      —“AE  — AE   —AE   — AE — ae — ae     ae       —ae.              =
                                      EXISTING ACCESS                                                                                                                                       ERICSSON
                                          TRACK
          So                                                                                                                              PROPOSED NBN CONSUMERS MAINS
              \                                  a                     $a                                                                           en
               \
                \                                                                                                                         PROPDSED NBN 2.4m HIGH CHAINWIRE SECURITY
               —pROPOSED NBN GPS UNIT I1-OFF)              ee                  som =                                                      FENCE WITH 3.0m WIDE ACCESS GATE
                   s                     ~                                       .      ere ——                                     _ __
                 PROPOSED NBN POWER DISTRIBUTION                                                                                          PRE ED NBN PROPERTY
                 BOARD/METER PANEL ON H-FRAME                            $—w»— 7 —             Ly,                 ‘       -               ol                                   ’
                        \                            ——                                  —_                 nek
               j FINAL ELECTRICAL CIRCUITS IN cons                                    NUE — NUE — NUE SE Fe   weber      — we ik — we —dag            NUE —= NUE — nue     *           =
                 INSTALL AS PER AS/NZS 3000                                      =                                  -               f                    .                             NATIONAL BROADBAND
                 PROPOSED NBN OUTDOOR CABINET —===—q————"4_¥                      |    ;                     _                Pd          PROPOSED NBN MONOPOLE FOOTING (TBC) |               NETWORK
               \ $SC-02 ON CONCRETE SLAB                       J                 8                          r        ~~                                                               SITE No: 4GYN-51 25-DAVD
               | PROPOSED NBN OUTDOOR CABINET                       ~                                        \  fas                 <                                                         ,
                 $SC-02 (FUTURE LOCATION)       ae          S\N                    eg                    \    |   AE                #                                                  DAVID COOTHARABA\
                                             =             ~         ~                                 2
                                              ;        =a                 ~~    HEIND      OY, NEF,        a          “Sa PROPOSED NBN 1x #600 PARABOLIC                                    ROAD RESERVE
            "0.0m PROPOSED NBN ACCESS ROUTE“                           we      pa Roy |                        ANT. Monopae is            ANTENNA (TO BOREEN POINT NORTH)                    DAVIS ROAD
                 (APPROX. 10m LONG!                               ~             ee 7           (emits fi                          s/f                   -                    |          COOTHARABA QLD 4565
                 WEN 300 WDE CABLE LADOO) wir (1-081,                       bls                   PE                   a           |      PROPOSED NBN 40m MONOPOLE WITH CIRCULAR
                 CABLE LADDER SUPPORT POST                        ~       _ line                    I:    v     at             |   lg                                                       PRELIMINARY
                                              1                      -       EA                  Le       ep                              HEADFRAME AND LADDER WITH LAD-SAF          |    PRELIMINARY         |
                                                                  ~—                                  '                    aL                                                         _—
                                                             i               :                        5             .  ~      S|  7       PROPOSED NBN 3x LLPX310R PANEL ANTENNAS     _——
              foo                                          s| a                |                      So .                    =    |      WITH NBN REMOTE RADIO UNITS TO BE FIXED
                                                            sie   NS,                                | 5           -   |        |         BEHIND THE PANEL ANTENNAS
                                                              BR   pee.       | as                                     .                                                    1
                                              2             +        Ss a,                            Ss
                 VEGETATION TO BE REMOVED, APPROX, 270m*   -            7            7      /      s—     ;—~,—l
                               NS                              | SETI                                                             _                                                    e
                                                                       2250
                        =              te ee                        _2250_|                                 350
                                              .                   L__                      10000                                                 —      _
                                                                                    NBNCOMPOUND AREA                                                                                   aurecon
                                              PROPOSED NBN CONSTRUCTION AREA                                                              evIGTINGTREES APPROY. mH                      actaipestateettregteresanatertan
                                                                                   sae                                                                                                fescee OvR
  sceno                                                                            SCALE 1100                        wore                                                           pene            JR
 LEGEND                                                                                                               NOTE:
  — Nut — NuE —    NBN UNDERGROUND ELECTRICAL LINES                                                                                                                                   Seana Tee
  — ec — ec— _ FINAL ELECTRICAL CIRCUITS IN 2x 50¢ HDPVC                                                              1, THE NBN CONSUMERS MAINS ROUTE SHOWN ON THE DRAWINGS IS INDICATIVE SITE SETOUT
                   UNDERGROUND ELECTRICAL CONDUIT                                                                       ONLY. ELECTRICAL CONTRACTOR TO DETERMINE EXACT ROUTE, ELECTRICAL
  _            _                                                                                                        CONTRACTOR TO LOCATE AND IDENTIFY EXISTING U/G SERVICES PRIORTO | PLAN
      /      /     NBN COMPOUND FENCE                                                                                   COMMENCEMENT OF WORK,
  — +   —4«E —_    EXISTING AERIAL ELECTRICAL LINES                                                                                                                                    sane                =a
  ——— - ——         PROPOSED NBN LEASE AREA                                                                                                                                             4GYM-51-25-DAVD-C3
(COPYRIGHT © NEN CoUIMITED ABN &6 136 533 741 . ALL RIGHTS RESERVED. VERSION 10- SEPT 2011                                                                              2     10   9    10    20   30   40  S0mn Az
                                                                                                                                                                        Lasuedesrtisietirosf fp |P|G
                                                                                                                           Page 51 of 110

Section 52

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 52 of 110

Get
                                                                                                                                                                                                                SS
                                              El 4.0m                                                                                                                                                                 Nv
                                              APPROX, OVERALL FACILITY HEIGHT \                                                                                                                  NBNCo
                                              EL 40,0m                                                                           EL 40,0m
                                             Zz                                                                                 Zz     _                                                                        |   ;
                                              TOP OF MONOPOLE                                                                    C/L 3x 1077H PROPOSED NBN PANEL ANTENNAS                                    Limited
                                                                                                                     —_             3x 500H REMOTE RADIO UNITS MOUNTED BEHIND                    =<
                                                                                                                             \ w EL 39.0m
                                                                                                                                 C/L 1x PROPOSED NBN CANISTER                                               es
                                                                                                                             \ gL 37.00                                                                        4
                                                                                                     |                              ix #600 PROPOSED NBN PARABOLIC ANTENNA                                =
                                                                                                                                    (TO BOREEN POINT NORTH)
                                                                                                                                                                                                     ERICSSON
                                                                                                     |
                                                                                                     |
                                            EXISTING TREES TO 27m
                                                                      \
                                                                       \                             |                         w EL 275m
                                                                        \                                                        C/L PROPOSED NBN GPS UNIT
                                                                                                     |
                                                                                                     |
                                                                                                     |
                                                                                                     |                            ROPOSED NBN 40m MONOPOLE WITH
                                                                                                     |                           CIRCULAR HEADFRAME                                              ae
                                                                                                     |                                                                                          NATIONAL BROADBAND)
                                                                                                                                  ROPOSED NBN FEEDER CABLES TO BE                                       NETWORK
                                                                                                     |                           RUN VERTICALLY INSIDE MONOPOLE                                 SITE No: 4GYM-51-25-DAVD
                                                                                                     |                                                                                          DAVID COOTHARABA
                                                                                                     |                                                                                               ROAD RESERVE
                                                                                                     |                                                                                                 DAVIS ROAD
                                                                                                     |                                                                                           COOTHARABA QLD 4565
                                                                                                     I
                                                                                                     |                                                                                               PRELIMINARY
                                                                                                     |                                                                                        _—
                                                                                                     |                       /— PROPOSED NBN 300 WIDE CABLE LADDER WITH
                                            PROPOSED NBN 2.4m HIGH CHAINWIRE SECURITY —,                                          {OFF} CABLE LADDER SUPPORT POST
                                            FENCE WITH 3.0m WIDE ACCESS GATE           \             |                            PROPOSED NBN OUTDOOR CABINET
                                                                                        \            |                     / __ SSC-02 ON CONCRETE SLAB
                                                                                         \           |                                                                                                Revel Deis
                                -nE           PROPOSED NBN PROPERTY                       \          |                    /-— PROPOSED NBN POWER DISTRIBUTION
                                             POLE                                           \        |                           BOARD/METER PANEL ON H-FRAME                                   s
                                                                                             \  1                 M7                                                                                       eco
                                                                                              \                                                                                                 aur                   n
                                                                                                                                 EL 0 om                                                       ‘Aurecon Australia Pty Lic ABN S¢ 005 133.873
                                                                                                                              {TOP OF FOUNDATION
                                                                                                                             fe  Fl 0.158
                                                                                                                                 FINISHED GROUND LEVEL
                                                                                             ===
                                                                                                                                                                                                Orawing The:
                                                                                                                                                                                                 SITE ELEVATION
                                                                                       NORTH ELEVATION                                                                                           AND DETAILS
                                                                                                 SCALE 1:200                                                                                         ~o
                                                                                                                                                                                                 4GYN-51-25-DAVD-C4
(COPYRIGHT © NEN CoUIMITED ABN S6 136 533 741 . ALL RIGHTS RESERVED. VERSION 10- SEPT 2011                                                                                       2     10   9     10   20    30   40   SOma Az

                                                                                                                                   Page 52 of 110

Section 53

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015


ATTACHMENT 2 - Photomontages




                                                      Page 53 of 110

Section 54

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 54 of 110

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015

               PROPOSED NBN
               FACILITY

f
E                                                              ro ae et)
aS       a   :                                                og     ;                                         4
 ee   .   J                                      Pe         a        we     aes
oa 5 te        4                              ils ot      '     ;           ae
 ¥       [ .                                  a.       ; k,,                        %     “>  . A               .
             /~ >                         ,  mt                                             ,
                                 +         i"
        “    ‘     ‘4                      Y    ,
            par”    belie                                                                                    =. |

                       i.        as Ea
                            .   Ace

                                                                               Page 54 of 110

Section 55

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 55 of 110

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA  13 OCTOBER 2015

                      PROPOSED NBN
                      FACILITY

                                                                        ag a
                                                                         ~
   ~~      ~~                                                      © oe
        ue                                                        -   ye”
      . rs il                                                      ——ae
    Coa                   |                                    Pia rt satan
>  | ite —                                         a? Salt. Cea
    7      Pir a iri             Ta           ery                      as

                                                     Page 55 of 110

Section 56

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   13 OCTOBER 2015




                                                      Page 56 of 110

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA               13 OCTOBER 2015

         PROPOSED NBN
         FACILITY

a
©

  )    A
 ae    ‘ % ¥
 a4  i    tA)         r     x ;
       Me ual TL) ; i | “    ‘            A                              =
                                            pe    sale ) :              "
                                                       A oe          >    ~      -           :

                                                           —

                                                                  Page 56 of 110

Section 57

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   13 OCTOBER 2015


4                      DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
                       MULTIPLE HOUSING - TYPE 4 CONVENTIONAL FOR 16 UNITS AT 30-32
                       DOONELLA STREET, TEWANTIN (MCU15/0053)
CUMENT INF ORM ATION




Author                         Denis Wallace, Coordinator Planning
                               Planning & Infrastructure Department

Index                          ECM/Application/MCU15/0053

Attachments                    1.   Proposal Plans
                               2.   Landscape Concept Plan



         APPLICATION DETAILS

         Applicant                        Serina Pty Ltd C/- DFS Group

         Proposal                         Development Permit for Material Change of Use for Multiple
                                          Housing - Type 4 Conventional (16 units)

         Properly Made Date               19 June 2015

         Information Request Date         2 July 2015

         Information Response             21 August 2015
         Date

         Decision Due Date                19 November 2015

         Number of Submissions            Nil

         PROPERTY DETAILS

         Property Address                 30 – 32 Doonella Street Tewantin

         RP Description                   Lot 32 RP893427
                                          Lot 903 T1631

         Land Area                        2,539m2

         Existing Use of Land             Multiple Dwellings / Detached House

         STATUTORY DETAILS

         SEQRP Designation                Urban Footprint

         Locality                         Tewantin & Doonan

         Zone                             Community Services

         Overlays                         Potential Acid Sulphate Soils

         Assessment Type                  Impact


                                                                                       Page 57 of 110

Section 58

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            13 OCTOBER 2015


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Organisation
Committee Meeting dated 13 October 2015 regarding Application No. MCU15/0053 for a
Development Permit for Material Change of Use for Multiple Housing - Type 4 Conventional
(16 units) situated at 30-32 Doonella Street, Tewantin and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied
           with prior to the use commencing, and then compliance maintained at all times
           while the use continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally
           comply with the approved plans of development. The approved plans are listed
           in the following table unless otherwise amended by these conditions.
            Plan No.         Rev.   Plan/Document Name                              Date
            0000-A-00-01     G      Cover Sheet and Site Plan by Inter Pty Ltd      12 August 2015

            0000-A-02-01     D      Basement and Ground Floor by Inter Pty Ltd      12 August 2015

            0000-A-02-02     C      First Floor Plan by Inter Pty Ltd               24 May 2015

            0000-A-02-03     C      Unit Plans by Inter Pty Ltd                     24 May 2015

            0000-A-04-01     D      Overall Elevations by Inter Pty Ltd             12 August 2015

            0000-A-05-00     C      Overall Sections by Inter Pty Ltd               24 May 2015

            0000-A-06-01     B      Waste Management Details by Inter Pty Ltd       12 August 2015

            SD-01            A      Landscape Concept Plan by DFS Group             27 May 2015

            SD-02            A      Landscape Concept Plan by DFS Group             27 May 2015

           Nature and Extent of Approved Use
     3.    The approved development comprises 15 x 2 bedroom and 1 x 1 bedroom
           residential units.
           Building Height
     4.    The maximum height of the development must not exceed 8 metres above the
           natural ground level and finished ground level (with the exception of the driveway
           entrance to the basement carpark and refuse store area).
     5.    Certification must be submitted to Council from a Licensed Surveyor which
           certifies that the building does not exceed the maximum height requirement of
           this Decision Notice.




                                                                                 Page 58 of 110

Section 59

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                        13 OCTOBER 2015


          Performance Bond
    6.    Security in the form of a cash bond or trading bank guarantee to the sum of
          $20,000 must be submitted to Council, to secure performance of all conditions of
          this approval, prior to the site pre-start meeting. The cash bond or trading bank
          guarantee will be returned on performance of the conditions of approval less any
          costs incurred by Council in respect of enforcing performance of this permit.
          Council reserves the right to call upon the bond or guaranteed sum to effect
          compliance with conditions.
          Street Identification
    7.    The street address of the development must be clearly visible and discernible
          from the primary frontage of the site by the provision of a street number and,
          where appropriate, the building name.
          Water & Sewer Connections
    8.    An underground connection to reticulated water and sewerage must be provided
          to the development site in accordance with the standards and requirements of
          Northern SEQ Distributor–Retailer Authority (Unitywater).
    9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground
          connection to reticulated water and sewerage has been provided to the
          development site.
          Building Appearance
    10.   All air conditioning units or other mechanical equipment must be fully enclosed or
          screened such that they are not visible from the street frontages nor adjoining
          properties.
    11.   All deck and balcony areas above ground floor must not be enclosed by
          permanent fixtures such as shutters, louvres, glass panelling or the like.
    12.   Undercroft areas toward the building’s Doonella Street frontage shall be
          screened/battened generally as indicated on the approved plans.
    13.   Balustrading to balcony areas must be glazed, as indicated on the approved
          plans.
          Fencing and Walls
    14.   Any street fencing must be set back an average of 1 metre from the front
          property boundary. Any fencing on the front boundary must either:
          a.   not exceed a maximum height of 1.2m
          b.   be of open construction.
    15.   The area of land between the fence and the front property boundary must be
          densely landscaped to screen any fencing from the street.
          Clothes Drying Areas
    16.   A common access outdoor clothes line shall be provided for resident’s use,
          which is screened from public view.
          Storage
    17.   Each dwelling unit must be provided with an allocated secure storage area(s)
          within the basement carpark.




                                                                            Page 59 of 110

Section 60

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         13 OCTOBER 2015


          Community Management Statement
    18.   Any proposed Community Management Statement required for the development
          pursuant to the Body Corporate and Community Management Act 1997 must be
          submitted to Council for endorsement at the same time as submission of the
          Building Format Plan (or similar) to Council for compliance assessment.
    19.   All clauses and by-laws of the proposed Community Management Statement
          must accord with the requirements of this Decision Notice.
          Landscaping Works
    20.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval and the Noosa Plan and must
          include:
          a.   The works shown on the approved plan number SD-02[A] titled
               “Landscape Concept Plan” by the DFS Group dated 27/05/15.
          b.   New planting species generally consistent with requirements of Planning
               Scheme Policy 3 – Landscaping Plants & Guidelines.
          c.   Retention of exiting trees toward the eastern boundary and south-eastern
               corner of the site as shown on the approved Landscape Concept Plan
               (with consideration to be given to the viability of retaining the tree(s) close
               to the building in the context of the likely construction disturbance).
          d.   Retention of existing street trees (with consideration to be given to the
               viability of retaining the tree(s) close to the new vehicle crossover in the
               context of the likely construction disturbance).
          e.   Screening vegetation along the western boundary and front setback.
          f.   Clearly detail any proposed front fencing.
    21.   All landscape works must be maintained generally in accordance with the
          approved design for the life of the development.
    ENGINEERING
          External Works
    22.   Roadworks must be provided within the proposed 3.0m wide “Public
          Thoroughfare” easement adjacent to the northern boundary of the site. The
          works must be undertaken in accordance with an Operational Works approval
          and must include in particular:
          a.   2.0m wide seal or concrete pavement along full length of the easement.
               The formation must be designed to cater for the potential future use by
               vehicles and be in accordance with Council’s Planning Scheme Policy 5 –
               Engineering Design Standards – Roads, Drainage and Earthworks.
          b.   Landscaping works to provide a suitable visual screening buffer between
               the building and the easement with a minimum garden bed width of
               800mm.
          c.   Pram ramps where required.
          d.   Any necessary alteration and reinstatement works beyond the boundary of
               the site to connect and match existing public carparks or pathways
               pavements.




                                                                              Page 60 of 110

Section 61

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                       13 OCTOBER 2015


          Site Access and Driveways
    23.   A sealed access driveway must be provided from Doonella Street to all parking
          and maneuvering areas of the development. The works must be undertaken in
          accordance with an Operational Works approval and must include in particular:
          a.   A driveway crossover generally in accordance with standard drawing SEQ
               R-051 Type D with a width not exceeding 6.5m at the boundary line with
               line marking or mountable traffic device at the entry to encourage left-in
               and left-out from the site.
          b.   Signage in accordance with Manual of Uniform Traffic Control Devices
               (MUTCD) installed within the site to indicate left-out only traffic.
          c.   Grades to allow for a compliant concrete pathway along the frontage.
          d.   Any landscaping, fences and fixtures near the access entry point must
               comply with AS 2890.1 requirements for sight visibility for pedestrians and
               cyclists at driveways.
          Frontage Reinstatement Works
    24.   All redundant driveways to the site must be removed and the kerb, footpath and
          verge area reinstated to match the balance of the site frontage, including the
          provision of topsoil and turf where the existing verge is grassed. The works must
          be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.   The existing driveway layback be removed and the kerb reinstated to
               match the type and alignment of the adjoining existing sections of kerb line.
               The driveway layback must be saw-cut and removed to allow for a smooth
               and neat join finish between the new and the existing kerb.
          b.   Reinstatement of concrete footpath to provide even and consistent
               gradients in longitudinal and across profiles generally in compliance with
               IPWEAQ standard drawing SEQ R-065 Concrete Pathway Construction
               Details, this may necessitate replacement of sections of the existing
               footpaths beyond the edges of the redundant driveways.
          c.   Any affected trees within the grassed verge must be replaced with similar
               species in accordance with the landscaping conditions of this permit.
          Car Parking
    25.   A minimum of 25 car parking spaces must be provided and marked on the site
          generally in accordance with the approved plans. The works must be
          undertaken in accordance with an Operational Works approval and must include
          in particular:
          a.   4 visitor parking spaces within the total, which are clearly marked for that
               purpose and accessible at all times for visitor use.
          b.   Crossfalls, gradients and vehicle headroom in accordance with Australian
               Standard AS2890: Parking Facilities.
    26.   All car parking areas and access driveways must be maintained exclusively for
          vehicle parking and maneuvering and kept in a tidy and safe condition at all
          times.
    27.   All car and bicycle parking areas must be line marked in accordance with
          approved plans, no dividing walls be constructed unless a further application for
          amendment is approved by Council.



                                                                            Page 61 of 110

Section 62

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                        13 OCTOBER 2015


          Service Vehicles
    28.   Service vehicle parking, maneuvering and standing space must be provided on
          the site in accordance with the approved plans.
          Stormwater Drainage
    29.   The site must be provided with a stormwater drainage system connecting to a
          lawful point of discharge. The works must be undertaken in accordance with an
          Operational Works approval, and must include in particular:
          a.   Stormwater system that caters for all storms up and including 1 in 100
               years storm event.
          b.   No adverse impact on other properties and the road’s footpath and
               grassed verge (eg by diverting flows and/or blocking flows and causing
               additional ponding).
          c.   Where applicable, extension of the site stormwater system to
               accommodate stormwater from external site, including registration of
               drainage easements.
          d.   The use of gravity stormwater drainage only and not surcharge pits or
               pumps.
    30.   Stormwater runoff from the development must be disposed of without causing
          scour or damage to the subject site or any adjoining property.
          Electricity and Telecommunication Services
    31.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits
          and pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    32.   Certification must be submitted to Council from all relevant service providers
          which certifies that the development has met the requirements of this Decision
          Notice and all applicable legislation at the time of construction.
          Easements
    33.   A 3 metre wide easement for “Public Thoroughfare” purposes must be registered
          against the title of the property in favour of Council. The easement must be
          located adjacent to the northern boundary of the subject property. The easement
          must:
          a.   be clearly shown on all plans submitted for Operational Works
          b.   be registered prior to the commencement of the use
          c.   the terms of the easement must allow for the use of the easement by the
               public whether in vehicles, cycles or on foot.
    34.   Unless otherwise agreed in writing by the relevant service provider, any public or
          third party infrastructure located on the subject site must be placed within an
          easement registered against the title of the property.
    35.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the
          Grantee’s standard easement terms. Draft easement documentation must be
          submitted to Council for endorsement.




                                                                            Page 62 of 110

Section 63

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


    36.   All works must be kept clear of any existing or proposed easements on the
          subject land, unless agreed otherwise in writing by the Grantee.
          Earthworks and Retaining Walls
    37.   All earthworks, associated batters and retaining walls must be undertaken in
          accordance with an Operational Works approval, and must in particular:
          a.    Be undertaken in compliance with the provisions of Australian Standard
                AS3798: Guidelines on Earthworks for Commercial and Residential
                Developments.
          b.    Be carried out in accordance with a site-specific Geotechnical Investigation
                Report prepared by a suitably qualified person* that addresses, in
                particular:
                i.    the impact of excavation and the construction works on the stability
                      of nearby building and infrastructures
                ii.   Acid Sulfate Soil assessment report in accordance with State
                      Planning Policy 2/02 Planning and Managing Development Involving
                      Acid Sulfate Soils and supported by appropriate testing and
                      documentation.
          c.    Have all access chamber surface levels for drainage, water supply or
                sewerage infrastructure within the work site be adjusted to provide a
                freeboard of 100mm above the finished ground surface level or be in
                accordance with the requirements and directions of the service provider.
          d.    All fill and associated batters must be contained entirely within the subject
                site unless written permission from the respective landowner(s) is provided
                to Council.
                (*) refer to Advisory Notes
          Acid Sulfate Soils
    38.   Where excavations of non-imported soils below the elevation of 5m AHD are
          necessary for construction, the application for Operational Works for Bulk
          Earthworks, Stormwater and /or Landscaping must demonstrate and include
          certification from a suitably experienced and qualified geotechnical engineer of
          methods necessary to ensure construction and operation of the development:
          a.    Shall be consistent with Queensland Acid Sulfate Soil Technical Manual:
                Soil Management Guidelines; and
          b.    will not result in the release of acid or associated metals; and
          c.    will not cause localised lowering of groundwater.
          Erosion and Sediment Control
    39.   Prior to the completion of the development, all site surfaces must be effectively
          stabilised. For the purpose of this condition, an effectively stabilised surface is
          defined as one that does not, or is not likely to result in visible evidence of soil
          loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to
          water contamination.




                                                                               Page 63 of 110

Section 64

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                       13 OCTOBER 2015


          Water Quality and Quantity
    40.   Except as otherwise modified herein, the development must be designed,
          constructed and maintained to achieve the stormwater quality and quantity
          outcomes detailed in the Stormwater Management Plan for 30-32 Doonella
          Street, Tewantin Rev A by AquaIntel Pty Ltd dated 12 August 2015 (Doc No
          2014027 RPT 001).
    41.   The development must include measures to prevent oils, hydrocarbons or other
          pollutants likely to be released in basement areas from being released into
          Council’s Stormwater system or other receiving waters.
    42.   Water quality treatment devices must be shaped and designed to be low
          maintenance, and integrate into the landscape. Where bioretention devices are
          proposed, the Operational Works Application for Stormwater Drainage,
          Landscaping and Earthworks must demonstrate how the design is consistent
          with the most current version of the Water by Design Bioretention Technical
          Design Guidelines.
    43.   Water Quality Treatment devices must be operated and maintained in
          accordance with manufacturer’s specifications and relevant maintenance
          manuals.
    44.   Prior to commencement of use the Community Management Statement must
          include provision for the engagement of personnel to operate and maintain
          Water Quality Treatment devices in accordance with manufacturer’s
          specifications, relevant maintenance manuals and the Stormwater Management
          Plan for 30-32 Doonella Street, Tewantin Rev A by AquaIntel Pty Ltd dated 12
          August 2015 (Doc No 2014027 RPT 001).
          Water Reuse
    45.   Detail design plans submitted with the Operational Works Application must
          demonstrate how waters will be reticulated from the rainwater storage tank to
          reuse areas with a minimum water use of 342KL per annum.
    46.   A suitable backflow prevention device must be installed on water reuse facilities
          to protect the potable water within the reticulated water supply in accordance
          with AS/NZS 3500:2003 Plumbing and Drainage.
    WASTE MANAGEMENT
          Waste Storage
    47.   The development must provide waste storage and disposal facilities in
          accordance with Planning Scheme Policy 9, Waste Management, including an
          external imperviously paved area correctly sized for all refuse and recycling
          containers and suitably screened from public places and neighbouring
          properties.
          The waste management facilities should ensure recyclables bins are
          appropriately sited and accessible, and/or provided with their own waste shute,
          to ensure recyclable waste is not placed in the general waste shute.
    48.   The site must be provided with a bin wash area with a cold-water tap, hose and
          drain outlet connected to sewer, via a bucket trap. The drain outlet is to be
          designed to prevent storm water entry to the sewerage system which can be
          achieved by a bunded area, with a nib wall height of 100mm maximum,
          enclosing a wash area of 700mm x 700mm minimum (max 0.7m²). Alternatively
          the waste area can be roofed, or any other appropriate design approved by
          Council.



                                                                           Page 64 of 110

Section 65

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                        13 OCTOBER 2015


          Building Demolition/Removal/Relocation
    49.   A Waste Management Plan (construction and demolition) must be submitted and
          approved by Council’s Environmental Health Officer prior to issue of a
          development permit for operational works for demolition, removal or relocation of
          any building other than a shed.
          The purpose of the Waste Management Plan is to facilitate the segregation of
          waste for the effective reuse and recycling of such materials. Segregated
          wastes attract significantly reduced disposal fees at the landfill with some items
          free. Higher gate fees are charged for mixed waste.
          Waste Management Plans (construction and demolition) are required to be
          submitted in accordance with Planning Scheme Policy 11, Waste Management
          Plans.
          Waste storage areas must provide adequate separation of all reusable,
          recyclable and waste materials. These must be located so that they are
          convenient and safe to use.
          The Plan must contain the following information:
             The site area for the storage and separation of waste is to be shown on the
               plan drawings accompanying the application.
             A waste management table as indicated below is to be completed showing
               how waste material is to be segregated - recycled – reused or disposed.

                  Table – Waste Management Table
           MATERIALS ON-SITE                DESTINATION
                                            Re-use and Recycling                 Disposal
           Expected    waste   Estimated    On-site           Off-site           *specify
           materials           volume(m³)   *specify proposed *specify           contractor     and
                                            re-use or on-site contractor and     landfill site or
                                            recycling methods recycling outlet   other disposal site
           Excavation
           material
           Green waste
           Bricks
           Concrete
           Timber-please
           specify
           Plasterboard
           Metals - please
           specify
           Asbestos
           Other - please
           specify
          Note * If a demolition contractor is undertaking works, then the Waste
          Management table is to be completed by the demolition contractor.
    ENVIRONMENTAL HEALTH
          Noise
    50.   Written certification is required from a suitably qualified person confirming that
          sound pressure levels from all mechanical plant and equipment comply with the
          following :




                                                                            Page 65 of 110

Section 66

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           13 OCTOBER 2015


           Air-conditioning and Refrigeration:
               7am to 10pm: Maximum level allowable = background + 5dB(A)
               10pm to 7am: Maximum level allowable = background + 3dB(A)
           Pumps:
             7am to 7pm: Maximum level allowable = background + 5dB(A)
             7pm to 10pm: Maximum level allowable = background + 3dB(A)
             10pm to 7am: No audible noise.
           Assessment and certification is required immediately after installation of the
           equipment and prior to any occupation of the building. All equipment should be
           operating at the same time to test the overall noise level created, with the
           measurement location at either the residential boundary or outside the most
           exposed part of an affected building - whichever is the closest to the
           plant/equipment.
           The certification must be submitted to Council, which certifies that operational
           noise from any fixed plant and equipment complies with the requirements of this
           Decision Notice.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with
     the Planning Scheme:
     1.    The multiple dwelling use is existing on the site.
     2.    The development will provide centrally located small dwelling units with access
           to Tewantin’s facilities and services.
     3.    The development’s small dwelling units will increase residential housing options
           in the locality and are likely to be relatively affordable.
     4.    There is no identified need for further community or infrastructure facilities within
           Tewantin and the development will not unduly constrain land available for
           commercial uses consistent with the site’s zoning provisions.
     5.    The development is consistent with the developed character of the area and will
           not negatively impact on visual or residential amenity.



REPORT
1.   PROPOSAL
The application seeks development approval for a Material Change of Use for Multiple
Housing – Type 4 Conventional for 16 residential units. The units are proposed within a 2-
storey building comprising 15 x 2 bedroom units and 1 x 1 bedroom unit arranged over two
habitable levels above a basement carpark. The gross floor area of the 2 bedroom units
range in size between 72 – 78m2 and the 1 bedroom unit is 64m2, with all units constituting
“small dwelling units” under The Noosa Plan (being less than 90m2).
The basement carpark houses 21 cars, bicycle parking, plant rooms, residents’ storage, a lift
and refuse area. 4 uncovered visitor carparks are provided at grade, external to the building.
Each of the 2 habitable building levels contain 8 units and each unit has a small east or west
facing balcony of a minimum 2.2 metre depth.
The building construction is primarily a mix of concrete, masonry block and FC sheeting.
Character elements are provided by the mix of external elements and use of timber
battening, glazed balustrading, window hoods, louvres and deep eaves to the simple skillion
roof form.




                                                                                Page 66 of 110

Section 67

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                        13 OCTOBER 2015


A number of the lower level units are allocated private courtyard areas but substantial
portions of the site will be left as communal open space. A roofed communal deck and BBQ
area is proposed in the northeast corner of the site and a number of existing large shade
trees are proposed to be retained. Dedication of a 3 metre wide pedestrian easement is
proposed along the northernmost boundary to provide a new formalised link between the
Council carpark to the east and the public laneway to the northwest.
A stormwater detention and treatment basin is proposed adjacent the Doonella Street
frontage in the southeast corner of the site. Vehicle access is via an upgraded crossover at
the western end of the site frontage with another existing crossover to the east to be
removed.
Figures 1 to 3 below show the proposed site layout and front building perspectives. Full
proposal plans are included as Attachment 1 and a Landscape Concept Plan is included as
Attachment 2.




                               Figure 1 – Proposed Site Plan




                                                                            Page 67 of 110

Section 68

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015




                       Figure 2 – Front Perspective from South West




                        Figure 3 – Front Perspective from South East

The application acknowledges the residential proposal raises conflicts with the site’s
Community Services zoning and submits grounds in support of the development considered
sufficient to overcome the planning conflicts.
2.   SITE DETAILS
2.1. Background
The site contains an existing detached house and an existing unit building with 4 units on Lot
903, which appears to have been constructed in the 1960s or 1970s and pre-dates planning
approvals for the area.
A pre-lodgement meeting was held with the applicant in September 2014 for a 21 unit
proposal on the site. A number of built form, population density and traffic concerns were
raised with that design, which have been addressed in the current proposal.


                                                                              Page 68 of 110

Section 69

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


2.2. Site Description
The site comprises two rectangular allotments both fronting Doonella Street. Lot 32 is
516m2 in area and contains an existing 2 storey weatherboard house. Lot 903 is 2,023m2 in
area and contains an older fibro unit building of 5 units in a poor state of repair. The units
are within 2 buildings, one being single storey and the other 2 storey. Both lots have mature
gardens but predominantly comprise exotic species. A tall mature hoop pine is located on
the northern boundary of the larger lot.

Both lots gain access via Doonella Street, with the 2 driveways rising up a moderate slope.
Overall, the site slopes at approximately 8% from the rear boundary down to the south
eastern corner at the Doonella Street frontage. The frontage contains 3 mature Poinciana
trees within the footpath reserve and a pedestrian crossing at its centre. Figures 4 to 6
below show aerial images of the site, zonings and the site survey.




                    Figure 4 – Aerial Photograph of Site and Surrounds




                                                                              Page 69 of 110

Section 70

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA              13 OCTOBER 2015




                          Figure 5 – Zoning Map




                 Figure 6 – Site Survey and Demolition Plan



                                                                 Page 70 of 110

Section 71

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          13 OCTOBER 2015


2.3. Surrounding Land Uses
The site is surrounded by the following land uses:
   Adjoining the site to the east is the large Council owned ‘Doonella Street carpark’,
     which provides rear access to the Tewantin Plaza and the carpark for the ‘Berry Place’
     cafés and takeaway shops fronting Memorial Avenue.
   Adjoining the site to the north is the ‘Tewantin Newsagency’ building, located at 107
     Poinciana Avenue. Currently, there is no through access from the Sidoni Lane carpark
     to the Council owned carpark at Doonella Street due to the shape of this lot.
   Adjoining the site to the west is the Salvation Army’s support accommodation building,
     providing safe, affordable and supported accommodation to families who are homeless
     or at imminent risk of being homeless. The site also adjoins the large Council owned
     ‘Sidoni Lane carpark’, which provides rear access to many of the shops on the
     southern side of Poinciana Avenue.
   Across the Doonella Street to the west are a mix of older style unit developments and
     detached houses fronting Lake Doonella.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions; and
   the Planning Scheme for the local government area;
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policies

The following State Planning Policy provisions with regard to water quality and acid sulfate
soils apply to the development and can be met by the development. Council’s Environment
Officer has assessed these aspects against both the State Planning Policy and the planning
scheme provisions and applied conditions in the recommendation to achieve compliance.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the urban footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan and associated State
Regulatory Provisions.
3.3. Statutory Instruments – Planning Scheme
The site is located in the Tewantin & Doonan Locality and is zoned Community Services.
The proposed multiple dwelling use is identified as an inconsistent use within the zone and is
required to follow an impact assessable application process.
Locality Provisions
The planning intent for land within the Community Services zone within the locality is
identified in Overall Outcome 12.8.2 (w), which states:



                                                                              Page 71 of 110

Section 72

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              13 OCTOBER 2015


For the Community Services Zone—land committed or planned for community purposes—
i         is protected and managed to enable the efficient and timely delivery of community
          services; and
ii        is consistent with the indoor recreation, education, social and safety needs of the local
          community, including people with special needs, such as the elderly, children, low
          income earners and disabled persons;
The proposed development does not involve a community use or infrastructure use
consistent with the zoning. Given the site is privately owned, the most likely community uses
on the site would be either childcare or aged care. Notably, Tewantin’s Community Services
zone provisions also allow office development, medical, veterinary and entertainment &
dining uses on the site. As such, the development provisions for the site are an amalgam of
the Community Services and Business Centre zones. Further outcome O77 of the locality
code states:
Uses found within the Community Services Zone, fronting Pelican Street, Poinciana Avenue,
Memorial Avenue, Doonella Street and Sidoni Street—
a)        support the functions of the Business Centre and include a range of important
          community services which serve the Tewantin and Doonan locality as well as the wider
          region; and
b)        are focused on emergency services, information centres; medical centres, social and
          infrastructure uses, and in the case of the Tewantin-Noosa RSL Club, entertainment
          and dining uses;
The applicant acknowledges the development involves an inconsistent use but submits a
number of grounds in support of the proposal. These are discussed in Section 3.4 of this
report.
The Overall outcomes for the locality seek new uses that are compatible with the character
and amenity of existing uses in the area. They also seek new multiple housing
developments that focus on areas close to the Tewantin Business Centre, community
facilities, parks and public transport services. The proposed unit development expands on
the existing multiple dwelling use on the site, but does not introduce any significant new
impacts on the amenity of the area and is generally well designed. The proposed small
dwelling units are likely to be relatively affordable and the location provides excellent access
to Tewantin’s facilities and services.
The locality code includes built form provisions for new development. The table below
provides assessment against the built form limits that would be applied to the site under both
the Community Services zone and Attached Housing zone (for comparison where unit
development is allowed).


     Criteria                      Planning Scheme                 Proposal              Complies
     Site Area                                                     2,539m²

     Population density            40.62 persons max               37.7 persons             
                                   (100persons per ha for
                                   Community Services Zone for
                                   retirement housing)

                                   25.39 persons max                                        X
                                   (100persons per ha for
                                   Attached Housing Zone)




                                                                                   Page 72 of 110

Section 73

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             13 OCTOBER 2015


 Criteria                       Planning Scheme                 Proposal                  Complies
 Gross floor area               1,625m² max                     1,437m²                     
                                (Community Services Zone)
                                1,019m² max                                                   X
                                (Attached Housing Zone)

 Site cover                     40% max                         33%                           
                                     2                                 2
 Landscaped open space          381m                            913m                          
                                (for Community Services Zone)

                                1,131m² min                     913m²                         X
                                (for Multiple Housing)

 Soft landscaping               > min 60% of total              > 60% of total                

 Landscaping Setbacks           6m to frontage                  6m                            
                                2m to uncovered parking         2m                            

 Building height
  storeys                     2 storeys max                   2 storeys                     

      metres                  8 metres                        8 metres                      
                                                                (with non-
                                                                compliance at
                                                                basement entrance,
                                                                which is acceptable)

 Boundary setbacks
  Frontage                    6 metres min                    6 metres                      

      Side                    4 metres min                    13.175 metres                 
                                                                (east)
                                                                4 metres (west)               

      Rear                    6 metres min                    6 metres                      

 Carparking                     16 spaces                       25 spaces                     

 Roof Form                      5 deg slope min                 2 deg skillion roof           X

                                600mm+ eaves to a min of 75%    900mm eaves to                
                                of perimeter                    100%


The development involves a number of built form and density relaxations, which are
discussed below.
       Population Density & Gross Floor Area
The proposal complies with the population density and gross floor area provisions for the
zone that would apply to retirement housing but does exceed these provisions as they would
apply for a consistent unit development within the adjacent Attached Housing zone. While
not a clear planning scheme “conflict”, it is considered the grounds to support the application
detailed in Section 3.4 should demonstrate clear benefits to justify the development at the
proposed density.




                                                                                      Page 73 of 110

Section 74

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            13 OCTOBER 2015


The building bulk and appearance is otherwise largely compliant, having a site cover of only
33%, providing substantial landscaped areas and allowing the retention of a number of
mature trees on the site. As such, the density and gross floor area aspects are not
considered to result in development out of character with the Community Services zone.
   Landscaping
The Landscaping Code applies a pro-rata requirement of 30m2 landscaping per person of
proposed population density and thereby requiring 45% landscaping for the site. The
development provides less at 36%, with the area of at-grade vehicle manoeuvring area
limiting the landscaping somewhat. However, the proposal significantly exceeds the 15%
minimum sought for the Community Services zone and submitted preliminary landscaping
plans indicate a good outcome including trees to partially screen the building elevations and
the predominance of soft-scaping.
   Roof Pitch
The locality code identifies a minimum 5 degree roof pitch as a probable solution to achieve
simple roof forms avoiding box profiles, flat roof with parapets, and the like. The proposal
has a lesser pitch (2 degrees), but provides a single skillion form across a 25m roof width
resulting in a legible fall of 0.5m as well as including deep eave overhangs to the full roof
perimeter. In the context of the surrounding development (including the large petrol station
canopy on the corner of Doonella St and Memorial Avenue, the Tewantin Plaza and the
Cooloola Centre), the relatively large roof line avoids the appearance of a box profile and is
considered acceptable.
   Public Thoroughfare
A key outcome of the Tewantin Locality code seeks connectivity between buildings and
public spaces is retained and enhanced. In this regard, Council’s Operational Works
Engineer recommends a 3m wide public thoroughfare easement be created at the rear of the
site for a new public right of way between the Sidoni Lane and Doonella Street carparks. The
dedication as an access easement is favoured rather than ‘road reserve’, as the access will
only be for pedestrian thoroughfare at this stage.
It is considered the area at the rear of the ‘Tewantin Newsagency’ site and the adjoining
units (107 & 109 Poinciana Avenue) is a more appropriate alignment for the extension of the
road as it is unencumbered by existing infrastructure (electricity transmission box) and
should be undertaken when the opportunity arises.
Land Use, Works & Overlay Provisions
The following codes which regulate land use, design and works are most applicable to this
application:
   Residential Uses Code
   Engineering Works Codes
   Landscaping Code
   Waste Management Code
The application has been assessed against each of the above applicable codes and
complies, or can be conditioned to comply, with each. Conditions are also recommended to
address the following matters:
   Right turn restrictions for vehicles exiting the site to avoid traffic conflicts on Doonella
     Street.
   Retention of existing mature trees toward the eastern open space portion of the site.
   Retention of mature Poinciana street trees within the road reserve.
   Various waste, stormwater, clothes drying, communal facilities and building
     appearance aspects.


                                                                                Page 74 of 110

Section 75

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           13 OCTOBER 2015


3.4. Grounds to Support Application
The applicant identifies the following grounds it considers sufficient to overcome the
application’s conflicts with the planning provisions applying to the site’s Community Services
zoning, in accordance with the requirements of the Sustainable Planning Act 2009:
1.    The application site is already used for residential purposes;
2.    Residential use is compatible with other established uses within the area and can
      continue to operate on the site without adverse impacts on the amenity of the adjoining
      uses or the character of the surrounding area;
3.    The proposed development will address a need for smaller, more affordable,
      residential dwellings within Tewantin;
4.    The proposed development will add to the supply, variety and mix of dwellings within
      Tewantin;
5.    The proposed development is consistent with the height, scale and density expected
      within the local area;
6.    The site is located next to the Tewantin Business Centre and has excellent
      accessibility to the services and facilities within the Centre;
7.    The proposed residential development will help to support the vitality and viability of
      the Business Centre;
8.    The Council has no additional community facilities identified or planned for Tewantin
      Town Centre and the site is no longer required to provide these types of facilities;
9.    There is no identified need, or demand for, the site to be used for service, utility or
      transport uses; and
10.   Commercial Business and Entertainment uses, which are also supported on the site by
      the Noosa Plan, would more appropriately be located within the Business Centre Zone
      to help reinforce its vitality and viability.
These grounds are generally agreed with. Advice from Council’s Strategic Planning unit
indicates no additional community facilities have been identified or planned for the
Tewantin’s business centre, with the intent to continue to upgrade and strengthen the
existing Tewantin Community Centre at Ernest/Earl Streets (which includes United
Synergies and Tait House).

Perhaps the most likely use for the site, given its private ownership, would be for childcare,
however, there are a number of existing nearby centres and loss of this land for that purpose
would not unduly constrain land for provision of future facilities should the need arise in the
future. The site’s planning provisions also allow for offices and medical (more commonly
associated with the adjacent business centre zone), but it is generally agreed with the
applicant that further commercial development fronting Doonella Street is not desirable.

Council’s Strategic Planning unit notes The Noosa Plan’s stated intent to provide for shop-
top housing and small dwelling units within the Business Centre zone, but these provisions
have yet to realise any significant new re-development or provision of affordable housing.
Tewantin has an older population relative to the broader Sunshine Coast and only 21.1% of
households comprise couples with children compared to 26.6% for the Sunshine Coast.
Also 26.5% of households are lone households compared to 22.1% for the Sunshine Coast.
Across the Sunshine Coast there is a lack of housing choice, especially for smaller and more
affordable dwellings. This is particularly the case for Noosa where there is a mismatch
between current housing forms and current and anticipated future demographic
profiles. Based on available land for housing in infill and greenfield areas, there is likely to
be increasing shortage of smaller and more affordable housing. The subject site is well


                                                                                Page 75 of 110

The text continues on section 76.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.