Original source · versioned page text
2015-10-13 Planning & Organisation Committee Agenda
The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 13 OCTOBER 2015
Site Access and Driveways
23. A sealed access driveway must be provided from Doonella Street to all parking
and maneuvering areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. A driveway crossover generally in accordance with standard drawing SEQ
R-051 Type D with a width not exceeding 6.5m at the boundary line with
line marking or mountable traffic device at the entry to encourage left-in
and left-out from the site.
b. Signage in accordance with Manual of Uniform Traffic Control Devices
(MUTCD) installed within the site to indicate left-out only traffic.
c. Grades to allow for a compliant concrete pathway along the frontage.
d. Any landscaping, fences and fixtures near the access entry point must
comply with AS 2890.1 requirements for sight visibility for pedestrians and
cyclists at driveways.
Frontage Reinstatement Works
24. All redundant driveways to the site must be removed and the kerb, footpath and
verge area reinstated to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed. The works must
be undertaken in accordance with an Operational Works approval and must
include in particular:
a. The existing driveway layback be removed and the kerb reinstated to
match the type and alignment of the adjoining existing sections of kerb line.
The driveway layback must be saw-cut and removed to allow for a smooth
and neat join finish between the new and the existing kerb.
b. Reinstatement of concrete footpath to provide even and consistent
gradients in longitudinal and across profiles generally in compliance with
IPWEAQ standard drawing SEQ R-065 Concrete Pathway Construction
Details, this may necessitate replacement of sections of the existing
footpaths beyond the edges of the redundant driveways.
c. Any affected trees within the grassed verge must be replaced with similar
species in accordance with the landscaping conditions of this permit.
Car Parking
25. A minimum of 25 car parking spaces must be provided and marked on the site
generally in accordance with the approved plans. The works must be
undertaken in accordance with an Operational Works approval and must include
in particular:
a. 4 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use.
b. Crossfalls, gradients and vehicle headroom in accordance with Australian
Standard AS2890: Parking Facilities.
26. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and maneuvering and kept in a tidy and safe condition at all
times.
27. All car and bicycle parking areas must be line marked in accordance with
approved plans, no dividing walls be constructed unless a further application for
amendment is approved by Council.
Page 61 of 110
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.