2015-10-13 Planning & Organisation Committee Agenda

of 110

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                        13 OCTOBER 2015


          Service Vehicles
    28.   Service vehicle parking, maneuvering and standing space must be provided on
          the site in accordance with the approved plans.
          Stormwater Drainage
    29.   The site must be provided with a stormwater drainage system connecting to a
          lawful point of discharge. The works must be undertaken in accordance with an
          Operational Works approval, and must include in particular:
          a.   Stormwater system that caters for all storms up and including 1 in 100
               years storm event.
          b.   No adverse impact on other properties and the road’s footpath and
               grassed verge (eg by diverting flows and/or blocking flows and causing
               additional ponding).
          c.   Where applicable, extension of the site stormwater system to
               accommodate stormwater from external site, including registration of
               drainage easements.
          d.   The use of gravity stormwater drainage only and not surcharge pits or
               pumps.
    30.   Stormwater runoff from the development must be disposed of without causing
          scour or damage to the subject site or any adjoining property.
          Electricity and Telecommunication Services
    31.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits
          and pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    32.   Certification must be submitted to Council from all relevant service providers
          which certifies that the development has met the requirements of this Decision
          Notice and all applicable legislation at the time of construction.
          Easements
    33.   A 3 metre wide easement for “Public Thoroughfare” purposes must be registered
          against the title of the property in favour of Council. The easement must be
          located adjacent to the northern boundary of the subject property. The easement
          must:
          a.   be clearly shown on all plans submitted for Operational Works
          b.   be registered prior to the commencement of the use
          c.   the terms of the easement must allow for the use of the easement by the
               public whether in vehicles, cycles or on foot.
    34.   Unless otherwise agreed in writing by the relevant service provider, any public or
          third party infrastructure located on the subject site must be placed within an
          easement registered against the title of the property.
    35.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the
          Grantee’s standard easement terms. Draft easement documentation must be
          submitted to Council for endorsement.




                                                                            Page 62 of 110
Log in to download the original file

2015-10-13 Planning & Organisation Committee Agenda(PDF, 10MB).pdf · 10.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.